{"product_id":"honeywell-8c-pcnt05-51454363-275-series-8-c300-controller-module","title":"Honeywell 8C-PCNT05 51454363-275 Series 8 C300 Controller Module","description":"\u003ch3\u003eDescription\u003c\/h3\u003e\n\u003cp\u003eThe \u003cstrong\u003eHoneywell 8C-PCNT05\u003c\/strong\u003e (Part Number \u003cstrong\u003e51454363-275\u003c\/strong\u003e) is a \u003cstrong\u003eSeries 8 C300v5 Controller Module\u003c\/strong\u003e engineered for continuous control strategy execution, complex process loops, and high-throughput field communication within the Honeywell Experion PKS system architecture. Built on dual-core processing hardware, this fifth-generation C300 controller significantly expands execution resources and communication throughput compared to legacy C300v3 hardware.\u003c\/p\u003e\n\u003cp\u003eOperating within the Honeywell Control Execution Environment (CEE), the \u003cstrong\u003eHoneywell 8C-PCNT05 51454363-275\u003c\/strong\u003e provides 32 MB of CEE user memory and 9000 execution units for intensive process logic, loop execution, and system-wide peer-to-peer data distribution. The module features factory conformal coating (coated 5, 6) to protect internal circuit assemblies against aggressive atmospheric conditions, chemical gases, and moisture encountered in demanding process control environments.\u003c\/p\u003e\n\u003cp\u003eThe unit connects directly to standard Series 8 mounting carriers, interfacing seamlessly across Fault Tolerant Ethernet (FTE) control networks. Supported on Experion PKS software releases R520.2 and onwards, the controller pairs with the dedicated 50182539-001 RAM charger module to ensure non-volatile retention of control configurations during main power supply interruptions.\u003c\/p\u003e\n\u003ch3\u003eFeatures\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eDual-Core Processing Hardware\u003c\/strong\u003e: Built with a dual-core architecture delivering 9000 processing execution units for high-demand control algorithms and communications.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExpanded CEE Memory Capacity\u003c\/strong\u003e: Features 32 MB of dedicated CEE user memory for large-scale control strategy storage, function blocks, and sequential operations.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEnhanced Peer Communication\u003c\/strong\u003e: Supports up to 8 Peer Gateway Module (PGM) connections per C300 node for scalable network architecture expansion.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHigh Data Access Rate\u003c\/strong\u003e: Achieves an overall display data access response rate of 4000 PPS and a peer communication rate of 2000 PPS.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePeer Initiator and Target Capacity\u003c\/strong\u003e: Delivers up to 2000 PPS incoming initiator pull\/get subscribe rates and 2000 PPS outgoing target publish rates.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHigh-Density Update Rates\u003c\/strong\u003e: Handles up to 200 peer capacity at 100 ms, 400 at 200 ms, 1000 at 500 ms, and 2000 at 1 sec update choices.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDedicated Power Backup\u003c\/strong\u003e: Designed to pair with the 50182539-001 RAM charger module to protect runtime data during power interruptions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eConformal Coated Protection\u003c\/strong\u003e: Factory conformal coating (coated 5, 6) safeguards electronic components in corrosive and harsh industrial atmospheres.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eApplications\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eExperion PKS Process Control\u003c\/strong\u003e: Central control processing engine executing continuous loops, complex interlocks, and batch recipes.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLarge-Scale Plant Automation\u003c\/strong\u003e: Distributed control operations across chemical, refining, petrochemical, and power generation facilities requiring high tag counts.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHigh-Speed Controller Networking\u003c\/strong\u003e: Peer-to-peer real-time data exchange across multiple C300 controller nodes via Fault Tolerant Ethernet (FTE).\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcess Subsystem Integration\u003c\/strong\u003e: Managing high-density Series 8 I\/O modules, smart transmitters, and fieldbus interfaces.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eOrdering Information\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eModel Number\u003c\/td\u003e\n\u003ctd\u003e8C-PCNT05\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePart Number\u003c\/td\u003e\n\u003ctd\u003e51454363-275\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eHardware Generation\u003c\/td\u003e\n\u003ctd\u003eC300v5 (Series 8)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eModule Coating\u003c\/td\u003e\n\u003ctd\u003eFactory Conformal Coating (Coated 5, 6)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eDedicated RAM Charger\u003c\/td\u003e\n\u003ctd\u003e50182539-001 (Required for RAM backup)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eTechnical Specifications\u003c\/h3\u003e\n\u003ch4\u003eGeneral\u003c\/h4\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eManufacturer\u003c\/td\u003e\n\u003ctd\u003eHoneywell\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eModel Number\u003c\/td\u003e\n\u003ctd\u003e8C-PCNT05\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePart Number\u003c\/td\u003e\n\u003ctd\u003e51454363-275\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eProduct Type\u003c\/td\u003e\n\u003ctd\u003eSeries 8 C300 Controller Module\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePlatform \/ System\u003c\/td\u003e\n\u003ctd\u003eExperion PKS \/ Experion LX\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eHardware Generation\u003c\/td\u003e\n\u003ctd\u003eC300v5\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSurface Protection\u003c\/td\u003e\n\u003ctd\u003eConformal Coated (Coated 5, 6)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch4\u003eProcessing \u0026amp; Memory\u003c\/h4\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eProcessor Architecture\u003c\/td\u003e\n\u003ctd\u003eDual Core\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eProcessing Execution Units\u003c\/td\u003e\n\u003ctd\u003e9000 Us (Control \/ Execution)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eTotal CEE User Memory\u003c\/td\u003e\n\u003ctd\u003e32 MB\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eRAM Charger Backup Module\u003c\/td\u003e\n\u003ctd\u003e50182539-001\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch4\u003eCommunication Performance\u003c\/h4\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMax PGM Connections per C300\u003c\/td\u003e\n\u003ctd\u003e8\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eDisplay Data Access Response Rate\u003c\/td\u003e\n\u003ctd\u003e4000 PPS\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePeer Data Access Response Rate\u003c\/td\u003e\n\u003ctd\u003e2000 PPS\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMax Initiator Pull\/Get Rate\u003c\/td\u003e\n\u003ctd\u003e2000 PPS\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eMax Target Publish Rate\u003c\/td\u003e\n\u003ctd\u003e2000 PPS\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePeer-to-Peer Execution Capacity\u003c\/td\u003e\n\u003ctd\u003e200 @ 100 ms, 400 @ 200 ms, 1000 @ 500 ms, 2000 @ 1 sec\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSupported FTE Switches\u003c\/td\u003e\n\u003ctd\u003eCisco 9200 (and qualified series)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch4\u003eSoftware Compatibility\u003c\/h4\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eMinimum Experion Release\u003c\/td\u003e\n\u003ctd\u003eExperion PKS \/ LX R520.2 and onwards\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eConnections \/ Interfaces\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eInterface\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eFunction\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eCarrier Edge Connector\u003c\/td\u003e\n\u003ctd\u003eDual backplane connection for attachment to Series 8 carrier assembly\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eFTE Network Interface\u003c\/td\u003e\n\u003ctd\u003eRedundant network routing over Fault Tolerant Ethernet infrastructure\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eRAM Charger Interface\u003c\/td\u003e\n\u003ctd\u003eDedicated header connection for the 50182539-001 RAM charger unit\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eInstallation Guidelines\u003c\/h3\u003e\n\u003col\u003e\n\u003cli\u003eInspect the 8C-PCNT05 module and carrier assembly to ensure slot contacts are clean and free of debris.\u003c\/li\u003e\n\u003cli\u003eIsolate power to the Series 8 mounting carrier before physically installing or replacing controller hardware.\u003c\/li\u003e\n\u003cli\u003eAlign the module's edge connectors with the designated C300 slot on the Series 8 carrier.\u003c\/li\u003e\n\u003cli\u003ePush the unit firmly into the carrier until the mechanical retaining latch fully engages.\u003c\/li\u003e\n\u003cli\u003eConnect the 50182539-001 RAM charger unit to the dedicated backup terminal on the controller.\u003c\/li\u003e\n\u003cli\u003eVerify redundant Fault Tolerant Ethernet (FTE) cabling connections to qualified Cisco 9200 switch ports.\u003c\/li\u003e\n\u003cli\u003eApply system power and monitor diagnostic LEDs during system initialization and boot sequence.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch3\u003eConfiguration \/ Commissioning \/ Replacement Guidelines\u003c\/h3\u003e\n\u003ch4\u003eConfiguration Guidelines\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003eProgram and configure control strategies using Honeywell Control Builder on Experion PKS release R520.2 or higher.\u003c\/li\u003e\n\u003cli\u003eAssign unique FTE node addresses and verify subnet settings prior to performing initial strategy downloads.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eCommissioning Recommendations\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003eMonitor CEE user memory consumption within Control Builder to optimize block assignments within the 32 MB limit.\u003c\/li\u003e\n\u003cli\u003eVerify peer-to-peer publication rates and PGM connection paths across configured controller nodes.\u003c\/li\u003e\n\u003cli\u003eCheck charging voltage status for the connected 50182539-001 RAM charger to ensure battery health.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eReplacement Recommendations\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eCross-Generational Redundancy Constraint\u003c\/strong\u003e: The 8C-PCNT05 (C300v5) module cannot be paired in a redundant set with an 8C-PCNT03 (C300v3) module, as different hardware generations will not synchronize redundancy states.\u003c\/li\u003e\n\u003cli\u003ePerform a full system database and parameter backup in Control Builder before removing an existing controller module.\u003c\/li\u003e\n\u003cli\u003eAlways ensure the replacement 8C-PCNT05 unit is installed with the correct 50182539-001 RAM charger model rather than legacy charger units.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Honeywell","offers":[{"title":"Default Title","offer_id":52668024684907,"sku":"8C-PCNT05 51454363-275","price":100.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0953\/3227\/0443\/files\/honeywell-8c-pcnt05-51454363-275-controller-module-kgiqxif0a1y_2584baf8-a696-449a-98c5-56fc50affb76.jpg?v=1765505257","url":"https:\/\/www.plcprotech.com\/it\/products\/honeywell-8c-pcnt05-51454363-275-series-8-c300-controller-module","provider":"PLC ProTech Ltd.","version":"1.0","type":"link"}