{"product_id":"siemens-6es7400-0hr54-4ab0-simatic-s7-400h-system-bundle","title":"Siemens 6ES7400-0HR54-4AB0 SIMATIC S7-400H System Bundle","description":"\u003ch3\u003eDescription\u003c\/h3\u003e\n\u003cp\u003eThe Siemens \u003cstrong\u003e6ES7400-0HR54-4AB0\u003c\/strong\u003e is a SIMATIC S7-400H system bundle, designed for high-availability industrial automation applications. This comprehensive H-system package includes a UR2-H rack, two PS 405 10A power supplies (rated for 24\/48\/60 V DC), four sync modules with a maximum cable length of 10 meters, two 1-meter sync cables, and two CPU 417-5H processors. It forms the core of a redundant control system, ensuring continuous operation in critical environments. Please note that two memory cards and four backup batteries are required additionally for full system functionality.\u003c\/p\u003e\n\n\u003ch3\u003eFeatures\u003c\/h3\u003e\n\u003cul\u003e\n  \u003cli\u003eSIMATIC S7-400H high-availability system bundle\u003c\/li\u003e\n  \u003cli\u003eIncludes 1 x UR2-H rack\u003c\/li\u003e\n  \u003cli\u003eEquipped with 2 x PS 405 10A power supplies (24\/48\/60 V DC)\u003c\/li\u003e\n  \u003cli\u003eFeatures 4 x sync modules (up to 10 m) and 2 x 1 m sync cables\u003c\/li\u003e\n  \u003cli\u003eContains 2 x CPU 417-5H processors\u003c\/li\u003e\n  \u003cli\u003eDesigned for redundant operation in critical applications\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eApplications\u003c\/h3\u003e\n\u003cp\u003eThe Siemens SIMATIC S7-400H system bundle is suitable for a wide range of industrial applications requiring maximum uptime and fault tolerance. Typical deployments include:\u003c\/p\u003e\n\u003cul\u003e\n  \u003cli\u003eCritical process control in chemical, oil \u0026amp; gas, and pharmaceutical industries\u003c\/li\u003e\n  \u003cli\u003ePower generation and distribution systems\u003c\/li\u003e\n  \u003cli\u003eWater and wastewater treatment plants\u003c\/li\u003e\n  \u003cli\u003eTransportation infrastructure\u003c\/li\u003e\n  \u003cli\u003eManufacturing lines with high availability requirements\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eTechnical Specifications\u003c\/h3\u003e\n\u003cdiv style=\"overflow-x:auto;\"\u003e\n  \u003ctable style=\"width:100%; border-collapse: collapse; border: 1px solid #ddd;\"\u003e\n    \u003cthead\u003e\n      \u003ctr\u003e\n        \u003cth style=\"padding: 8px; border: 1px solid #ddd; text-align: left;\"\u003eParameter\u003c\/th\u003e\n        \u003cth style=\"padding: 8px; border: 1px solid #ddd; text-align: left;\"\u003eValue\u003c\/th\u003e\n      \u003c\/tr\u003e\n    \u003c\/thead\u003e\n    \u003ctbody\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eManufacturer\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eSiemens\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eBrand\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eSiemens\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eRange\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eSIMATIC S7\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eSubrange\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eS7-400\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eProduct Type\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eHigh-availability CPUs (System Bundle)\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003ePLM Product Phase\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eActive\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003ePower Supply Input Voltage\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003e24\/48\/60 V DC\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003ePower Supply Current Rating\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003e10 A\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eSync Module Cable Length (Max)\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003e10 m\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eSync Cable Length (Included)\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003e1 m\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003ePackage Dimensions (Calculated)\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003e100.50 x 36.50 x 27.50 cm\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eShipping Weight\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003e11.00 kg\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eCommodity Code\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003e85371091\u003c\/td\u003e\n      \u003c\/tr\u003e\n      \u003ctr\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eExport Control Regulations (ECCN)\u003c\/td\u003e\n        \u003ctd style=\"padding: 8px; border: 1px solid #ddd;\"\u003eEAR99\u003c\/td\u003e\n      \u003c\/tr\u003e\n    \u003c\/tbody\u003e\n  \u003c\/table\u003e\n\u003c\/div\u003e\n\n\u003ch3\u003eInstallation Guidelines\u003c\/h3\u003e\n\u003cp\u003eProper installation is crucial for the reliable operation of the SIMATIC S7-400H system bundle. Adhere to standard industrial practices and safety protocols:\u003c\/p\u003e\n\u003col\u003e\n  \u003cli\u003e\n\u003cstrong\u003eDe-energization:\u003c\/strong\u003e Ensure all power to the installation area is disconnected and locked out before beginning any work.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMounting:\u003c\/strong\u003e Securely mount the UR2-H rack in a suitable control cabinet, ensuring adequate ventilation and clearance for cable routing and maintenance.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePower Supply Connection:\u003c\/strong\u003e Connect the two PS 405 power supplies to the appropriate 24\/48\/60 V DC sources, ensuring correct polarity and proper grounding. Verify that power cables are correctly terminated and secured.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCPU and Module Installation:\u003c\/strong\u003e Insert the CPU 417-5H processors and sync modules into their designated slots within the UR2-H rack. Ensure all modules are firmly seated.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSync Cable Routing:\u003c\/strong\u003e Connect the provided 1-meter sync cables between the sync modules of the redundant CPUs. Route these cables to minimize electromagnetic interference and mechanical stress.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMemory Cards and Batteries:\u003c\/strong\u003e Install the two required memory cards into the CPU 417-5H processors and the four backup batteries into their respective compartments.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eGrounding and Shielding:\u003c\/strong\u003e Establish a robust grounding connection for the entire system to the control cabinet's ground bus. Implement proper shielding for signal cables to prevent noise interference.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCable Management:\u003c\/strong\u003e Route all power, communication, and I\/O cables neatly, separating high-voltage and low-voltage lines to prevent interference. Use cable ties and conduits where appropriate.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePower-Up and Testing:\u003c\/strong\u003e After all connections are verified, re-energize the system and perform initial diagnostic checks and functional testing according to Siemens' commissioning procedures.\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Siemens","offers":[{"title":"Default Title","offer_id":52715775557995,"sku":"6ES7400-0HR54-4AB0","price":100.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0953\/3227\/0443\/files\/6es7400-0hr54-4ab0-fj20uvdazfw_8d464530-b68c-42c4-b9c7-c4e4c368977b.jpg?v=1767070907","url":"https:\/\/www.plcprotech.com\/ms\/products\/siemens-6es7400-0hr54-4ab0-simatic-s7-400h-system-bundle","provider":"PLC ProTech Ltd.","version":"1.0","type":"link"}