{"product_id":"siemens-6es7141-3bh00-0xa0-et-200eco-basic-module","title":"Siemens 6ES7141-3BH00-0XA0 ET 200eco Basic Module","description":"\u003ch3 style=\"color: #1a365d; border-bottom: 2px solid #e2e8f0; padding-bottom: 8px; margin-bottom: 16px;\"\u003eDescription\u003c\/h3\u003e\n\u003cp style=\"color: #2d3748;\"\u003eThis Siemens 6ES7141-3BH00-0XA0 is a Basic Module for the ET 200eco distributed I\/O system, engineered for reliable signal processing in industrial environments. As a compact and durable component, it simplifies plant configuration by minimizing wiring complexity and reducing susceptibility to electromagnetic interference. The module facilitates straightforward commissioning and provides \u003cstrong\u003eadvanced diagnostic functions\u003c\/strong\u003e for stable, long-term operation. Communication is handled via the \u003cstrong\u003ePROFIBUS DP\u003c\/strong\u003e protocol, ensuring fast and accurate data exchange between the controller and field devices.\u003c\/p\u003e\n\n\u003ch3 style=\"color: #1a365d; border-bottom: 2px solid #e2e8f0; padding-bottom: 8px; margin-bottom: 16px;\"\u003eFeatures\u003c\/h3\u003e\n\u003cul style=\"list-style-type: square; color: #2d3748; padding-left: 20px;\"\u003e\n\u003cli\u003eIntegral component of the SIMATIC ET 200eco distributed I\/O family.\u003c\/li\u003e\n\u003cli\u003eEnables communication over the PROFIBUS DP fieldbus network.\u003c\/li\u003e\n\u003cli\u003eDesigned for simplified wiring and flexible installation.\u003c\/li\u003e\n\u003cli\u003eFeatures advanced diagnostic capabilities for system monitoring.\u003c\/li\u003e\n\u003cli\u003eCompact and robust construction suitable for field applications.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3 style=\"color: #1a365d; border-bottom: 2px solid #e2e8f0; padding-bottom: 8px; margin-bottom: 16px;\"\u003eApplications\u003c\/h3\u003e\n\u003cul style=\"list-style-type: square; color: #2d3748; padding-left: 20px;\"\u003e\n\u003cli\u003eDistributed control systems in factory automation\u003c\/li\u003e\n\u003cli\u003eMachine building and OEM equipment\u003c\/li\u003e\n\u003cli\u003eProcess control and monitoring\u003c\/li\u003e\n\u003cli\u003eMaterial handling and conveyor systems\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3 style=\"color: #1a365d; border-bottom: 2px solid #e2e8f0; padding-bottom: 8px; margin-bottom: 16px;\"\u003eTechnical Specifications\u003c\/h3\u003e\n\u003cdiv style=\"overflow-x: auto;\"\u003e\n\u003ctable style=\"width: 100%; border-collapse: collapse; color: #2d3748;\"\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth style=\"border: 1px solid #e2e8f0; padding: 10px 12px; text-align: left; background-color: #f7fafc; font-weight: 600;\"\u003eSpecification\u003c\/th\u003e\n\u003cth style=\"border: 1px solid #e2e8f0; padding: 10px 12px; text-align: left; background-color: #f7fafc; font-weight: 600;\"\u003eValue\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eManufacturer\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eSiemens\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eModel Number\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003e6ES7141-3BH00-0XA0\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eProduct Series\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eSIMATIC ET 200eco\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eModule Type\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eBasic Module\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eCondition\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eBrand New\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eCommunication Protocol\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003ePROFIBUS DP\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eLifecycle Status\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eActive\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eShipping Weight\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003e0.95 kg\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003ePackage Dimensions (Calculated)\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003e2.5 cm x 5.1 cm x 83.8 cm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eCountry of Origin\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eGermany\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003eHS Code\u003c\/td\u003e\n\u003ctd style=\"border: 1px solid #e2e8f0; padding: 10px 12px;\"\u003e8537101190\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/div\u003e\n\n\u003ch3 style=\"color: #1a365d; border-bottom: 2px solid #e2e8f0; padding-bottom: 8px; margin-bottom: 16px; margin-top: 24px;\"\u003eInstallation Guidelines\u003c\/h3\u003e\n\u003cdiv style=\"padding: 16px; background-color: #fff5f5; border-left: 5px solid #c53030; margin-bottom: 20px;\"\u003e\n\u003cstrong style=\"color: #c53030;\"\u003eCRITICAL WARNING:\u003c\/strong\u003e Electrical Hazard. Installation must be performed by qualified personnel only. Failure to de-energize the system and follow Lockout\/Tagout (LOTO) procedures before installation can result in severe injury or death.\n\u003c\/div\u003e\n\u003col style=\"list-style: none; padding-left: 0; color: #2d3748;\"\u003e\n\u003cli style=\"display: flex; align-items: flex-start; margin-bottom: 16px;\"\u003e\n\u003cspan style=\"display: inline-flex; align-items: center; justify-content: center; width: 24px; height: 24px; border-radius: 50%; background-color: #2b6cb0; color: white; font-weight: bold; margin-right: 12px; flex-shrink: 0;\"\u003e1\u003c\/span\u003e\n\u003cdiv\u003e\n\u003cstrong\u003eSystem De-energization:\u003c\/strong\u003e Before starting any work, completely disconnect power to the control panel and all related machinery. Verify zero energy state using a calibrated voltmeter. Apply appropriate LOTO devices.\n\u003c\/div\u003e\n\u003c\/li\u003e\n\u003cli style=\"display: flex; align-items: flex-start; margin-bottom: 16px;\"\u003e\n\u003cspan style=\"display: inline-flex; align-items: center; justify-content: center; width: 24px; height: 24px; border-radius: 50%; background-color: #2b6cb0; color: white; font-weight: bold; margin-right: 12px; flex-shrink: 0;\"\u003e2\u003c\/span\u003e\n\u003cdiv\u003e\n\u003cstrong\u003eModule Mounting:\u003c\/strong\u003e Securely mount the ET 200eco module directly to a clean, flat, and conductive surface on the machine or panel. Ensure all mounting screws are tightened to the manufacturer's specified torque to guarantee a solid mechanical and grounding connection.\n\u003c\/div\u003e\n\u003c\/li\u003e\n\u003cli style=\"display: flex; align-items: flex-start; margin-bottom: 16px;\"\u003e\n\u003cspan style=\"display: inline-flex; align-items: center; justify-content: center; width: 24px; height: 24px; border-radius: 50%; background-color: #2b6cb0; color: white; font-weight: bold; margin-right: 12px; flex-shrink: 0;\"\u003e3\u003c\/span\u003e\n\u003cdiv\u003e\n\u003cstrong\u003ePROFIBUS DP Connection:\u003c\/strong\u003e Use approved PROFIBUS DP cables. Ensure proper termination at both ends of the bus segment. Connect the cable shield to the functional earth (FE) terminal at one point to prevent ground loops.\n\u003c\/div\u003e\n\u003c\/li\u003e\n\u003cli style=\"display: flex; align-items: flex-start; margin-bottom: 16px;\"\u003e\n\u003cspan style=\"display: inline-flex; align-items: center; justify-content: center; width: 24px; height: 24px; border-radius: 50%; background-color: #2b6cb0; color: white; font-weight: bold; margin-right: 12px; flex-shrink: 0;\"\u003e4\u003c\/span\u003e\n\u003cdiv\u003e\n\u003cstrong\u003ePower and I\/O Wiring:\u003c\/strong\u003e Connect the 24V DC power supply and I\/O field device wiring to the appropriate terminals. Ensure correct polarity. Use ferrules on stranded wires for secure connections and route cables to minimize electrical noise interference.\n\u003c\/div\u003e\n\u003c\/li\u003e\n\u003cli style=\"display: flex; align-items: flex-start; margin-bottom: 16px;\"\u003e\n\u003cspan style=\"display: inline-flex; align-items: center; justify-content: center; width: 24px; height: 24px; border-radius: 50%; background-color: #2b6cb0; color: white; font-weight: bold; margin-right: 12px; flex-shrink: 0;\"\u003e5\u003c\/span\u003e\n\u003cdiv\u003e\n\u003cstrong\u003eSystem Commissioning:\u003c\/strong\u003e After all connections are verified, remove LOTO devices and restore power. Configure the module in the PLC programming software, set the correct PROFIBUS address, and test all I\/O points for correct functionality.\n\u003c\/div\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Siemens","offers":[{"title":"Default Title","offer_id":52695210426731,"sku":"6ES7141-3BH00-0XA0","price":100.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0953\/3227\/0443\/files\/siemens-6es7141-3bh00-0xa0-basic-module-meiydi1huyl_420017ee-789c-496b-b7c7-a4017bd17951.jpg?v=1766130813","url":"https:\/\/www.plcprotech.com\/products\/siemens-6es7141-3bh00-0xa0-et-200eco-basic-module","provider":"PLC ProTech Ltd.","version":"1.0","type":"link"}