1 z 3

General Electric DS200TCTGG1AFF Mark V Simplex Trip Board

General Electric DS200TCTGG1AFF Mark V Simplex Trip Board

Only 3 item(s) left in stock
  • Manufacturer: General Electric

  • Product No.: DS200TCTGG1AFF

  • Country of origin:United States

  • Product Type: Simplex Trip Board

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 320g

  • Dimensions: 28.8cm x 7.2cm x 3.8cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Množství
Zobrazit veškeré podrobnosti

Description

The DS200TCTGG1AFF acts as a core hardware component within the Mark V Turbine Control System Series. As a Simplex Trip Board, this unit is engineered to manage specific trip and protection functionalities for turbine systems. The device is a domestically manufactured printed circuit board that features a normal style of coating assembly, ensuring long-term hardware reliability in standard operating environments. It integrates an array of plug-in relays and heavy-duty multi-pin connectors to distribute control and trip signals reliably.

Features

  • Equipped with 21 sequential plug-in relays labeled from K1 through K21.
  • Relays are physically secured using integrated metal retention straps.
  • Features three 50-pin connectors and two 12-pin connectors for comprehensive system interfacing.
  • Built with a normal style of PCB protective coating.

Applications

  • General Electric Mark V Turbine Control Systems
  • Simplex configuration trip management and protection loops
  • Industrial gas and steam turbine control automation

Technical Specifications

Parameter Specification
Manufacturer General Electric
Series Mark V
Part Number DS200TCTGG1AFF
Functional Acronym TCTG
Functional Description Simplex Trip Board
PCB Coating Normal Coating
Functional Revision 1 A
Functional Revision 2 F
Artwork Revision F

Connections/Interfaces

Connector Pin / ID Function
JLY 50-Pin Interface Connector
JLX 50-Pin Interface Connector
JLZ 50-Pin Interface Connector
JN 12-Pin Interface Connector
JM 12-Pin Interface Connector

Installation Guidelines

  • Power Isolation: Disable all power supplies by disconnecting the relevant fuses or alternative isolation devices before servicing. Always use a verified voltage testing device to confirm the absence of electric current inside the drive prior to touching components.
  • Cable Mapping: Explicitly diagram and label all cable locations and routing designations before disconnection to guarantee accurate reinstallation.
  • Relay Removal: Detach the securing metal strap from the connector base before pulling the relay straight out of its socket.
  • Relay Insertion: Align the replacement relay precisely with the connector socket, press it firmly into place, clip one end of the metal strap to the connector, route the strap over the top of the relay, and clip it securely to the opposite side of the connector.

How many plug-in relays are populated on the board?

The board is populated with 21 plug-in relays, which are sequentially designated starting from K1 up to K21.

What types of cable connectors are available on the device?

The device features a total of five connectors: three 50-pin connectors designated as JLY, JLX, and JLZ, and two 12-pin connectors designated as JN and JM.

What is the procedure for securing a replacement relay into its socket?

Align the relay with the connector, press it down, clip one end of the metal strap to the connector, position the strap over the top of the relay, and clip the remaining end to the opposite side of the connector.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Dots
Country of origin
United States
Power source
DC Power

Recently Viewed Products

Technical knowledge

Modernizing Bailey INFI 90 Symphony HMIs Running on OpenVMS Alpha

A practical guide to replacing aging Bailey Symphony operator stations running on OpenVMS Alpha. It compares Alpha emulation, OpenVMS x86 migration, OPC re-platforming, and phased ABB modernization.

Why Maintenance Data Is Essential for Industrial Reliability

Maintenance data connects work orders, sensor signals, asset history, costs, and technician knowledge. Used well, it improves planning, reliability, predictive maintenance, spare-parts control, and...

Elektrické pohony navržené jako náhrada hydraulických systémů: Praktická příručka průmyslové automatizace

Tento článek vysvětluje, jak integrované elektrické pohony, jako je řada e-Actuator od SMC, mění průmyslové řízení pohybu nahrazením tradičních pneumatických a hydraulických systémů. Zdůrazňuje...

Matematické operace pomocí OpenPLC pro průmyslové automatizační aplikace

Tento článek vysvětluje, jak PLC systémy provádějí základní matematické operace, jako jsou sčítání, odčítání, násobení, dělení, modulo a umocňování v rámci průmyslové automatizace. Ukazuje, jak tyto...

Pokročilá Booleovská logika s programováním FBD PLC: Praktické průmyslové aplikace nad rámec základní logiky

Článek vysvětluje několik pokročilých funkcí Booleovy logiky používaných v programování PLC nad rámec základních operací AND, OR a NOT. Popisuje, jak se v diagramu funkčních bloků (FBD) využívají...

Booleovská logika v programování PLC: Pochopení logických bran FBD

Booleovská logika je základem každého programu PLC. Od jednoduchých ovládání strojů až po složité průmyslové automatizační systémy určují logické hradla, jak řadiče reagují na měnící se vstupy a...