1 z 1

Siemens 6AV7611-0AA22-0AE0 SIMATIC Panel PC 670

Siemens 6AV7611-0AA22-0AE0 SIMATIC Panel PC 670

Only 6 item(s) left in stock
  • Manufacturer: Siemens

  • Product No.: 6AV7611-0AA22-0AE0

  • Country of origin:Niemcy

  • Product Type: Panel PC

  • Barcode: 85371091

  • Payment: T/T, Western Union

  • Weight: 4g

  • Dimensions: 40 x 30 x 15 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Ilość
Pokaż kompletne dane

Description

The Siemens 6AV7611-0AA22-0AE0 is a SIMATIC Panel PC 670, an industrial-grade human-machine interface (HMI) designed for control and visualization tasks in manufacturing environments. This unit features a 10-inch TFT display and is powered by an Intel Pentium III 500 MHz processor. It is configured with 128 MB of RAM, a 20 GB hard drive, and operates on a 24 VDC power supply. This specific model comes pre-installed with a German-language version of the Windows 98 operating system.

Features

  • 10-inch color TFT display for process visualization.
  • Powered by an Intel Pentium III 500 MHz CPU.
  • Equipped with 128 MB of system RAM.
  • Includes a 20 GB hard drive for data and application storage.
  • Operates on a standard 24 VDC industrial power source.
  • Pre-loaded with Windows 98 operating system (German language).

Applications

  • Human-Machine Interface (HMI) for machine control.
  • SCADA client for plant-level monitoring.
  • Process data logging and visualization.
  • Control panel for automated assembly lines.
  • Legacy system integration and monitoring.

Technical Specifications

Specification Value
Brand Siemens
Model Number 6AV7611-0AA22-0AE0
Product Series SIMATIC Panel PC 670
Product Type Panel PC
Display 10 inch TFT
Processor (CPU) Intel Pentium III, 500 MHz
Memory (RAM) 128 MB
Storage 20 GB Hard Drive (HD)
Power Supply Input 24 VDC
Operating System Windows 98 (German)
Product Lifecycle Status Obsolete
Shipping Weight 4.00 kg
Harmonized Tariff Code 85371091
ECCN N
Package Dimensions (Calculated) 40 x 30 x 15 cm

Installation Guidelines

CRITICAL WARNING: RISK OF ELECTRIC SHOCK

Installation must be performed by qualified personnel only. Disconnect all power sources and implement Lockout/Tagout (LOTO) procedures before accessing or installing this equipment. Failure to de-energize the system can result in severe injury or death.

  1. 1 Panel Cutout and Mounting: Prepare the control cabinet panel cutout according to the device's mechanical drawings. Ensure the mounting surface is clean, flat, and rigid. Insert the Panel PC into the cutout and secure it evenly using all provided mounting clamps to maintain the specified ingress protection rating. Do not overtighten the clamps.
  2. 2 Protective Earth (PE) Connection: Connect the chassis to the control cabinet's protective earth busbar using a low-impedance, short-gauge wire. A reliable earth connection is critical for operator safety and electromagnetic compatibility (EMC).
  3. 3 Power Supply Wiring: Connect the 24 VDC power supply to the designated terminals. Verify the polarity (+/-) is correct before energizing. Use appropriately sized conductors and ensure connections are torqued to specification. Route power cables separately from high-voltage or high-frequency signal cables.
  4. 4 Interface Connections: Connect all required communication and peripheral cables (e.g., Ethernet, USB, serial). Ensure all connectors are fully seated and secured. Use shielded cables for communication lines and ground the shields at one end, typically at the cabinet ground bar, to minimize noise interference.
  5. 5 System Power-Up: After verifying all connections and clearing the work area, remove LOTO devices and apply power to the cabinet. Observe the Panel PC's boot sequence to ensure the operating system loads correctly. Proceed with software configuration and commissioning.

Globalna ekspresowa wysyłka

  • Standardowa dostawa: 4-6 dni roboczych za pośrednictwem DHL, FedEx i UPS.
  • Ekspresowa wysyłka: Wysyłka tego samego dnia dla zamówień dostępnych w magazynie złożonych przed godziną 14:00 (GMT+8).
  • Globalne pokrycie: Obsługujemy ponad 150 krajów, w tym szybką dostawę do Arabii Saudyjskiej i ZEA.

Zwroty i gwarancja

  • 30-dniowa gwarancja: Zwroty przyjmowane są dla produktów dostępnych w magazynie, w oryginalnym, fabrycznie zapieczętowanym opakowaniu.
  • 12-miesięczna gwarancja: Każdy komponent przemysłowy objęty jest naszą profesjonalną gwarancją techniczną.

Zamówienia są przetwarzane i dostarczane od poniedziałku do piątku (z wyłączeniem dni świątecznych).


Aby poznać pełne warunki kwalifikowalności, opłaty za przyjęcie towaru z powrotem oraz szczegóły dotyczące zwrotów międzynarodowych, prosimy zapoznać się z naszym oficjalnym Polityka zwrotów i zwrotu pieniędzy .

TECHNICAL SPECIFICATIONS

Country of origin
Niemcy

Ostatnio oglądane produkty

Wiedza techniczna

Electric Actuators Designed to Replace Fluid Power Systems: A Practical Industrial Automation Guide

This article explains how integrated electric actuators, such as SMC’s e-Actuator series, are transforming industrial motion control by replacing traditional pneumatic and hydraulic systems. It...

Math Operations Using OpenPLC for Industrial Automation Applications

This article explains how PLC systems perform core mathematical operations such as addition, subtraction, multiplication, division, modulo, and exponentiation within industrial automation. It shows...

Advanced Boolean Logic with FBD PLC Programming: Practical Industrial Applications Beyond Basic Logic

The article explains several advanced Boolean logic functions used in PLC programming beyond basic AND, OR, and NOT operations. It covers how tools like truth tables, multiplexers, pulse generators,...

Boolean Logic in PLC Programming: Understanding FBD Logic Gates

Boolean logic is the foundation of every PLC program. From simple machine controls to complex industrial automation systems, logic gates determine how controllers respond to changing inputs and...

Deep-Dive Guide to Industrial Firewalls and OT Network Segmentation

Industrial firewalls play a critical role in OT cybersecurity, protecting PLC, DCS, and SCADA networks through segmentation, ingress/egress control, and IDS/IPS integration aligned with IEC 62443...

Guide to Robotic Grippers: From Delicate Handling to Heavy-Duty Automation

Modern robotic grippers are evolving beyond traditional mechanical jaws. From gecko-inspired adhesive systems and soft food-grade grippers to AI-powered warehouse tools, advanced gripping...