1 z 1

Siemens 6ES7647-6CG00-0FX0 SIMATIC IPC627C Box PC

Siemens 6ES7647-6CG00-0FX0 SIMATIC IPC627C Box PC

Only 5 item(s) left in stock
  • Manufacturer: Siemens

  • Product No.: 6ES7647-6CG00-0FX0

  • Country of origin:Niemcy

  • Product Type: Industrial Box PC

  • Barcode: 85371099

  • Payment: T/T, Western Union

  • Weight: 7050g

  • Dimensions: 92.0 x 21.0 x 14.0 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Ilość
Pokaż kompletne dane

Description

The Siemens 6ES7647-6CG00-0FX0 is a SIMATIC IPC627C series Box PC designed for demanding industrial automation applications. This unit is configured with an Intel Core i7-610E processor, 1 GB of DDR3 RAM, and a dual storage configuration of 2x 320 GB SATA hard drives managed by an onboard RAID controller. It features an integrated industrial power supply compatible with 110/230V AC inputs and includes essential system monitoring functions such as a watchdog timer and temperature/fan monitoring. Connectivity is provided through dual Gigabit Ethernet ports, high-current USB 2.0 ports, and a serial interface. This model is supplied without a pre-installed operating system.

Features

  • Intel Core i7-610E Processor (2.53 GHz, 2 Cores / 4 Threads)
  • 1 GB DDR3 1066 DIMM Memory
  • Dual 320 GB SATA Hard Drives
  • Onboard RAID Controller for data redundancy or performance
  • Dual 10/100/1000 Mbit/s Ethernet ports for network connectivity
  • Integrated system monitoring with Watchdog, Temperature, and Fan sensors
  • DVD+/-RW optical drive and front-accessible CompactFlash slot
  • Two free PCI slots for hardware expansion

Applications

  • Machine-level data processing and visualization
  • Process control and monitoring systems
  • Industrial gateways and data loggers
  • Supervisory Control and Data Acquisition (SCADA) nodes

Technical Specifications

General Information
Manufacturer Siemens
Product Series SIMATIC IPC627C
Model Number 6ES7647-6CG00-0FX0
Product Type Box PC
Product Lifecycle Status Phase-Out
Processing Unit
CPU Intel Core i7-610E
Cores / Threads 2 Cores / 4 Threads
Clock Speed 2.53 GHz
Cache 4 MB
Features Turbo Boost (TB), Hyper-Threading (HT), Virtualization Technology (VT), Active Management Technology (AMT)
Memory and Storage
RAM 1 GB DDR3 1066 DIMM
Hard Drive 2x 320 GB SATA
RAID Controller Onboard
Optical Drive DVD +/-RW
Removable Media CompactFlash Drive No. 1 (Front)
Interfaces and Expansion
Ethernet 2x 10/100/1000 Mbit/s RJ45
USB 4x USB V2.0 (High Current)
Serial 1x COM 1
Graphics HD Graphic Onboard
Expansion Slots 2x PCI (Free)
Power Supply
Input Voltage 110/230V AC
Type Industrial Power Supply Unit with NAMUR
Power Cable Europe
Physical and Environmental
System Monitoring Watchdog, Temperature/Fan Monitoring
Package Dimensions (Calculated) 92.0 x 21.0 x 14.0 cm
Shipping Weight 7.05 kg
Country of Origin Germany (Estimate)
Commodity Code 85371099

Installation Guidelines

CRITICAL WARNING: Hazardous voltages are present. Installation must be performed by qualified personnel only. Failure to follow safety procedures can result in severe injury, death, or equipment damage. Always de-energize and lock out/tag out (LOTO) all power sources before installation or maintenance.
  1. 1 De-energize the main control cabinet and verify the absence of voltage using a calibrated meter. Apply Lockout/Tagout (LOTO) procedures.
  2. 2 Select a suitable mounting location inside the panel, ensuring adequate clearance for ventilation around the PC chassis as specified by the manufacturer. Avoid proximity to high-noise sources like VFDs.
  3. 3 Securely mount the Box PC chassis to the backplane or mounting plate using all provided mounting points to ensure mechanical stability and proper grounding continuity.
  4. 4 Connect the main AC power cable to the unit's power supply input. Ensure the power source matches the 110/230V AC rating.
  5. 5 Connect a low-impedance protective earth (PE) conductor to the designated chassis grounding terminal. This is critical for safety and EMI protection.
  6. 6 Connect all required peripheral and network cables (Ethernet, USB, Serial). Use shielded cables for data lines where appropriate and ensure shields are properly terminated.
  7. 7 After a final inspection of all connections, remove LOTO devices and re-energize the cabinet to commission the system.

Globalna ekspresowa wysyłka

  • Standardowa dostawa: 4-6 dni roboczych za pośrednictwem DHL, FedEx i UPS.
  • Ekspresowa wysyłka: Wysyłka tego samego dnia dla zamówień dostępnych w magazynie złożonych przed godziną 14:00 (GMT+8).
  • Globalne pokrycie: Obsługujemy ponad 150 krajów, w tym szybką dostawę do Arabii Saudyjskiej i ZEA.

Zwroty i gwarancja

  • 30-dniowa gwarancja: Zwroty przyjmowane są dla produktów dostępnych w magazynie, w oryginalnym, fabrycznie zapieczętowanym opakowaniu.
  • 12-miesięczna gwarancja: Każdy komponent przemysłowy objęty jest naszą profesjonalną gwarancją techniczną.

Zamówienia są przetwarzane i dostarczane od poniedziałku do piątku (z wyłączeniem dni świątecznych).


Aby poznać pełne warunki kwalifikowalności, opłaty za przyjęcie towaru z powrotem oraz szczegóły dotyczące zwrotów międzynarodowych, prosimy zapoznać się z naszym oficjalnym Polityka zwrotów i zwrotu pieniędzy .

TECHNICAL SPECIFICATIONS

Country of origin
Niemcy

Ostatnio oglądane produkty

Wiedza techniczna

Siłowniki elektryczne zaprojektowane do zastąpienia systemów hydraulicznych: praktyczny przewodnik po automatyce przemysłowej

Ten artykuł wyjaśnia, jak zintegrowane siłowniki elektryczne, takie jak seria e-Actuator firmy SMC, rewolucjonizują przemysłową kontrolę ruchu, zastępując tradycyjne systemy pneumatyczne i...

Operacje matematyczne z wykorzystaniem OpenPLC w zastosowaniach automatyki przemysłowej

Ten artykuł wyjaśnia, jak systemy PLC wykonują podstawowe operacje matematyczne, takie jak dodawanie, odejmowanie, mnożenie, dzielenie, modulo oraz potęgowanie w automatyce przemysłowej. Pokazuje,...

Zaawansowana logika boolowska w programowaniu PLC za pomocą FBD: praktyczne zastosowania przemysłowe wykraczające poza podstawową logikę

Artykuł wyjaśnia kilka zaawansowanych funkcji logiki boolowskiej stosowanych w programowaniu PLC, wykraczających poza podstawowe operacje AND, OR i NOT. Omawia, jak narzędzia takie jak tabele prawdy,...

Logika boolowska w programowaniu PLC: Zrozumienie bramek logicznych FBD

Logika boolowska jest podstawą każdego programu PLC. Od prostych sterowań maszyn po złożone systemy automatyki przemysłowej, bramki logiczne decydują o tym, jak sterowniki reagują na zmieniające się...

Szczegółowy przewodnik po przemysłowych zaporach sieciowych i segmentacji sieci OT

Przemysłowe zapory sieciowe odgrywają kluczową rolę w cyberbezpieczeństwie OT, chroniąc sieci PLC, DCS i SCADA poprzez segmentację, kontrolę ruchu przychodzącego/wychodzącego oraz integrację IDS/IPS...

Przewodnik po chwytakach robotycznych: od delikatnego manipulowania po ciężką automatykę

Nowoczesne chwytaki robotyczne ewoluują poza tradycyjne mechaniczne szczęki. Od systemów adhezyjnych inspirowanych gekonem i miękkich chwytaków spożywczych po narzędzia magazynowe zasilane sztuczną...