The DS2020DACAG2 operates as a ruggedized AC to DC power conversion assembly designed for integration within EX2100 excitation systems and Mark VIe control networks. This power supply module supplies regulated local energy to essential distribution architectures, effectively extending systemic control ride-through capabilities during line source failures or operation within completely battery-less configurations.

The structural circuit path of the DS2020DACAG2 executes rectification of alternative source feeds into structured direct current bus rails. Operating from a dual-tap 115 VAC or 230 VAC line entry, the module delivers an output potential rated at 126 VDC with a maximum delivery boundary of 9.5 ADC under individual assembly usage. This rectified DC line couples to concurrent system energy feeds through an on-board diode network to build a common distribution bus, directly feeding secondary controller blocks, core module sectors, and active gate pulse amplifier cards. The conversion topology utilizes heavy-duty electrolytic storage capacitors to maintain ripple filtering, accompanied by dedicated diagnostic LED indicators arranged at downstream modules (such as EPDM, EGPA, EXTV, and EPBP) to verify consistent power rail health. For expanded system loads, multiple units can be coupled in parallel configurations via a standardized 12-position connector interface to boost aggregate loop outputs to 16.5A DC.

Features

  • Dual-Voltage Input Conversion: Rectifies standard 115 VAC or 230 VAC utility inputs into a stabilized 126 VDC configuration loop.
  • Parallel Core Scaling: Supports dual-module parallel load sharing across a shared bus to increment total output delivery up to 16.5A DC.
  • Integrated Ride-Through Buffering: Provides localized capacitive hold-up capacity to secure system control execution parameters over temporary line voltage drops.
  • Diode-Coupled Bus Isolation: Employs built-in steering diodes to seamlessly tie converted DC current with alternative backup battery rails.

Applications

  • EX2100 Excitation Bus Power: Delivers continuous rectified bus power to gate pulse amplifier boards and excitation distribution racks.
  • Mark VIe Battery-Less Controller Feeds: Main power conversion assembly deployed in turbine generator infrastructure missing static battery storage banks.
  • Industrial DC Distribution Maintenance: Used as a drop-in, fully backward-compatible replacement for obsolete Group 1 (DS2020DACAG1) modules.

Technical Specifications

Parameter Specification
Manufacturer General Electric (GE)
Model DS2020DACAG2
Product Series EX2100 Excitation Series / Mark VIe System
Module Type AC-DC Power Conversion Assembly
Functional Acronym DACA
Power Conversion Parameters 115/230 VAC input to 126 VDC output
Output Power Rating 1000 W
Maximum Output Current (Single) 9.5 ADC
Maximum Output Current (Parallel) 16.5 ADC
Capacitor Configuration Wear-replaceable Electrolytic Capacitors
Operating Temperature -22 to +140 degF (-30 to +60 degC) via free convection
Operating Humidity Bounds 5 to 95%, non-condensing
Calculated Life Expectancy 100 years at ambient temp of 68 degF (20 degC)
PCB Coating Profile Normal style surface coating
Replaces Model DS2020DACAG1 (Group 1)
Product Weight 48.39 lbs (21.95 kg)

Connections/Interfaces

Connector Identifier Terminal Layout Function
JZ Connector 12-Position Modular Block Integrated input path for raw AC entry and output pathway for rectified DC loops

Installation Guidelines

  • Bus Line De-energization: Verify total isolation and zero potential on all source input wires and parallel battery loops before attempting hardware replacement.
  • ESD Shielding Protocol: Installation engineers must stay attached to an approved, fully grounded anti-static wrist strap to avert dielectric shock to the inner circuit components.
  • Parallel Voltage Matching Requirements: If operating dual conversion assemblies in a parallel network, both blocks must hook into the identical AC source link to secure identical source input potentials.
  • Harness Interconnection Setup: When wiring the conversion assembly alongside an IS2020JPDF module, lock the specialized wiring harness firmly between the JPDF and JPDB terminals.

FAQ

Are there any design differences between the DS2020DACAG1 and the DS2020DACAG2?

There are virtually no functional differences between the two models. The DS2020DACAG2 serves as a direct drop-in and fully backward-compatible replacement for the older DS2020DACAG1 module.

Can two parallel units be connected to separate AC power sources?

No. When running two parallel assemblies to increase current output to 16.5A, they must be tied to the exact same AC input source to maintain balanced input voltages.

How does extreme ambient operating temperature alter the expected service life of the module?

While the baseline life expectancy is 100 years at 68 degF, operating continuously at an elevated ambient temperature of 149 degF degrades the internal electrolytic capacitors, requiring module replacement roughly every five years.

What nominal voltage measurements should be checked on a grounded, coupled DC bus setup?

When the conversion module is correctly diode-coupled and grounded, nominal voltage checks across the bus rails should register +62.5 VDC and -62.5 VDC relative to ground.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 3
Only 4 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Dots Silver
Country of origin
United States

Technical knowledge

Moving TwinCAT 3 Licenses with C9900-L100: Build and Device Checks

Before moving a TwinCAT 3 license with a Beckhoff C9900-L100, verify the TwinCAT build, XML device description, exact order code and cabinet limits.

Replacing a Beckhoff EL4032: Wiring and Output Checks

A field checklist for replacing a Beckhoff EL4032, covering the ±10 V load, terminal map, power contacts, EtherCAT state, and watchdog behavior.

Replacing Yokogawa AAI835: Wiring and Barrier Checks Before Swap

Before replacing a Yokogawa AAI835, verify the 4-in/4-out channel map, power-loss loop behavior, barrier type, output load, cable, and redundancy.

ABB PM891K01 Replacement: Check Redundancy Before Ordering

ABB PM891K01 article 3BSE053241R1 is the non-redundant AC 800M processor kit. Use this field checklist before replacement.

ABB TP853 Replacement Checks for CI853/CI855/CI857/CI861

Replacement checks for ABB TP853 3BSE018126R1: identify the installed CI853, CI855, CI857, or CI861 interface, record wiring, and verify communication after installation.

5069-L330ERMS2 Startup Checks: RTBs, I/O, and Motion Limits

Engineering checks for the Allen-Bradley 5069-L330ERMS2: controller capacity, separate RTB kits, local I/O limits, network-node limits, and motion-axis count.