General Electric

GE IS200WETAH1AHC Mark VIe Wind WETA Topbox A PCB

SKU IS200WETAH1AHC

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: General Electric

  • Product No.: IS200WETAH1AHC

  • Country of origin:United States

  • Product Type: Printed Circuit Boards

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 840g

  • Dimensions: 36.3cm x 28cm x 3.8cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The IS200WETAH1AHC functions as a high-density printed circuit board developed by GE Energy for integrated placement within the Mark VIe Wind turbine control system platform. Engineered specifically as a WETA Topbox A PCB, this assembly operates inside wind energy infrastructure to interface vital control signaling with the turbine monitoring system. The IS200WETAH1AHC leverages built-in limit checking diagnostics and system programmable software tools execution paths to support operations, fault evaluation, and signal maintenance capabilities across alternative energy wind networks.

Features

  • Integrated Sub-Board Support: Equipped with one auxiliary daughterboard labeled explicitly as the IS210BPPBH2C module for expanded technical sub-processing capability.
  • Perimeter Grounding Design: Features an exposed copper strip containing multiple factory-drilled holes along all four board edges to maximize chassis-ground connectivity.
  • Built-In Diagnostic Architecture: Works alongside built-in hardware and software limit checking diagnostic functions to process control boundary monitoring without extra network interfaces.

Applications

  • Alternative energy wind turbine control setups
  • Topbox A interface panels in the Mark VIe Wind series platform
  • Main structural system monitoring and diagnostic routing panels

Technical Specifications

Item Description / Value
Manufacturer GE Energy
Series Mark VIe Wind
Part Number IS200WETAH1AHC
Functional Acronym WETA
Functional Description WETA Topbox A PCB
Auxiliary Board Part Number IS210BPPBH2C

Installation Guidelines

  • Board Perimeter Grounding: Utilize the bare copper strips along all four board edges and the factory-drilled mounting holes to establish solid functional grounding back to the cabinet enclosure chassis.
  • Auxiliary Daughterboard Fitting: Check that the hosted IS210BPPBH2C auxiliary card remains locked onto its dedicated hardware sockets before finalizing external system wiring steps.
  • Static Discharge Control: Always handle the assembly inside an ESD-safe workspace, applying a grounded wrist strap to guard surface elements against static paths.

FAQ

What auxiliary card comes attached to this assembly?

The board features one sub-assembly daughterboard attached directly to its main structure, labeled as part number IS210BPPBH2C.

How are grounding paths established across the module chassis?

Grounding is secured via an exposed copper lining path featuring several factory-drilled holes running continuously along all four board edges to provide comprehensive noise mitigation.

What main turbine sector is this circuit board optimized for?

While the overarching control series manages multiple utilities, this specific device is custom-tailored for wind energy alternative generation applications.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 3
Only 6 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Green
Country of origin
United States

Technical knowledge

Commissioning Three-Phase Power Measurement Safely

A field-focused guide to commissioning three-phase power measurement: verify CT and voltage wiring, scaling, phase order, signal quality, PLC mapping, alarms, and safe maintenance before trusting...

First TwinCAT PLC Project on a Beckhoff IPC

Build and verify a first TwinCAT PLC project on a Beckhoff IPC. This checklist covers target selection, EtherCAT discovery, I/O mapping, safe activation, restart tests, and commissioning records.

Commissioning OPC UA in KEPServerEX: A Field Checklist

A practical commissioning sequence for KEPServerEX OPC UA connections: define data ownership, test tags locally, configure endpoint and certificate trust, limit access, then verify failure recovery...

Set a PLC Commissioning Laptop IP Without Losing Access

Commissioning an Ethernet-connected PLC often starts with the laptop, not the controller. Learn how to record existing settings, choose a temporary address, test connectivity, and restore the plant...

Designing Automation for Combustible Dust Hazards

Combustible dust controls require more than alarms. Learn how to map dust generation, select instrumentation, design interlocks, handle failed feedback, test safe states, and maintain the full...

Hairpin Stators: Benefits, Limits, and Inspection

Hairpin windings raise slot fill and support compact traction motors, but conductor geometry, AC losses, insulation damage, weld quality, and cooling determine whether the design meets its targets.