Omron C200HW-PA204C Power Supply Unit for SYSMAC PLCs
SKU C200HW-PA204C
In stock
No reviews
12-month warranty
Free returns within 30 days
Manufacturer:
Omron
Product No.:
C200HW-PA204C
Country of origin:Japan
Product Type:
Power Supply Units
Payment:
T/T, Western Union
Weight:
1500g
Shipping port:
Xiamen
Warranty:
12 months
Description
The C200HW-PA204C is a specialized Power Supply Unit (PSU) designed for the Omron SYSMAC C200H series PLCs. A distinguishing feature of this model is its integrated Maintenance Forecast Monitor, which provides early warning signs of power supply degradation. By utilizing a 7-segment display and transistor output, it allows maintenance teams to monitor the health of the power unit in real-time, significantly reducing the risk of unexpected system downtime.
This unit supports a wide input voltage range of 100 to 240 VAC, making it suitable for global industrial installations. It provides a robust output capacity, including 4.6 A at 5 VDC (23 W) and 0.6 A at 26 VDC (15.6 W), with a maximum total output power of 30 W.
Features
Maintenance Forecast Monitor: Integrated 7-segment display and transistor output for predictive maintenance.
Wide Input Range: 100 to 240 VAC power input compatibility.
Reliable Output: Stable power delivery for CPU, I/O, and communication modules.
Compact Design: Lightweight (approx. 450 g) for efficient control cabinet utilization.
Power Interruption Detection: Automatically detects voltage drops below 85 V max.
Technical Specifications
Feature
Specification
Manufacturer
Omron
Model
C200HW-PA204C
Input Voltage
100 to 240 VAC
Output (5 VDC)
4.6 A (23 W)
Output (26 VDC)
0.6 A (15.6 W)
Max Total Power
30 W
Maintenance Monitor
Yes (Display + Transistor Output)
Weight
450 g
Installation Guidelines
Mounting: Ensure the unit is installed in a well-ventilated area within the PLC rack to prevent heat accumulation, which can negatively affect the lifespan of internal components.
Wiring: Connect the AC input lines to the designated terminals, ensuring that all connections are secure to prevent voltage fluctuations.
Monitor Output: If utilizing the maintenance forecast function, wire the transistor output to an available PLC input module to receive alerts directly into your control software or HMI.
Power Capacity: Ensure that the total power consumption of your PLC rack (CPU, modules, and peripherals) does not exceed the 30 W limit of the power supply.
FAQ
What is the primary benefit of the Maintenance Forecast Monitor?
It provides proactive alerts through a 7-segment display and transistor output, allowing operators to replace the power supply before it fails, thereby preventing unscheduled downtime.
What is the total power output capacity of this unit?
The C200HW-PA204C provides a maximum total output power of 30 W.
What happens if the input voltage drops below 85 V?
The unit features a power interruption detection circuit that identifies voltage drops below 85 V, allowing the system to react appropriately to power instability.
A practical commissioning sequence for KEPServerEX OPC UA connections: define data ownership, test tags locally, configure endpoint and certificate trust, limit access, then verify failure recovery...
Commissioning an Ethernet-connected PLC often starts with the laptop, not the controller. Learn how to record existing settings, choose a temporary address, test connectivity, and restore the plant...
Combustible dust controls require more than alarms. Learn how to map dust generation, select instrumentation, design interlocks, handle failed feedback, test safe states, and maintain the full...
Hairpin windings raise slot fill and support compact traction motors, but conductor geometry, AC losses, insulation damage, weld quality, and cooling determine whether the design meets its targets.
Use Ansible to standardize SCADA server changes without expanding OT risk. This guide covers inventories, idempotent playbooks, staged testing, credentials, logging, and practical rollback controls.
A VPN encrypts the path to an industrial network, but secure remote PLC work also needs identity controls, segmented access, change approval, logging, safe operating boundaries, and tested recovery...
Choosing a selection results in a full page refresh.