1 of 1

Siemens 6AV3607-5BB00-0AH0 SIMATIC HMI OP7 Operator Panel

Siemens 6AV3607-5BB00-0AH0 SIMATIC HMI OP7 Operator Panel

Only 6 item(s) left in stock
  • Manufacturer: Siemens

  • Product No.: 6AV3607-5BB00-0AH0

  • Country of origin:Germany

  • Product Type: Operator Panels

  • Barcode: 85371091

  • Payment: T/T, Western Union

  • Weight: 100g

  • Dimensions: 15.20cm x 18.80cm x 5.50cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Quantity
View full details

Description

The Siemens 6AV3607-5BB00-0AH0 is a SIMATIC HMI OP7 series operator panel, specifically configured as an OP7/DP model with a customer-specific design (Version B). This operator panel is designed to provide a human-machine interface for machine control, parameter monitoring, and diagnostic reporting. It features a reliable, ruggedized interface suitable for integration with SIMATIC S7 PLC systems via the PROFIBUS-DP network. Although this unit incorporates customer-specific design elements, it is delivered with a standard front interface consistent with the functional capabilities of the OP7 series. Note that this product is currently classified as Obsolete in the Siemens product lifecycle.

Features

  • Designed for PROFIBUS-DP (OP7/DP) network integration
  • Compact operator panel interface for S7 PLC systems
  • Robust construction for industrial environments
  • Customer-specific design version B
  • Standard front interface design

Technical Specifications

Parameter Specification
Manufacturer Siemens
Brand Siemens
Range SIMATIC HMI
Subrange OP7 series
Product Type Operator Panels
Product Phase Obsolete
Dimensions 15.20 x 18.80 x 5.50 cm
Weight 0.10 kg
Commodity Code 85371091
Export Control (ECCN) N

Installation Guidelines

  • Mounting: Ensure the panel is mounted in a stable, flat surface on the control cabinet door or console using the provided clamping elements to maintain the required IP protection rating.
  • Environmental Considerations: Protect the unit from direct sunlight, excessive vibrations, and conductive dust to ensure long-term reliability.
  • Wiring: Use screened cables for PROFIBUS-DP communication to minimize electromagnetic interference (EMI). Ensure the bus termination is correctly set at both ends of the segment.
  • Grounding: Maintain a low-impedance connection between the panel and the cabinet common ground to prevent potential equalization issues.
  • Power Supply: Verify that the supply voltage matches the requirements of the specific OP7/DP model before initial power-up.

Is the 6AV3607-5BB00-0AH0 still actively manufactured?

No, this product is currently classified as Obsolete by Siemens.

What communication network does this operator panel support?

This is an OP7/DP model, designed for integration with PROFIBUS-DP networks.

What is the primary function of the OP7 series panels?

The OP7 series serves as an HMI for monitoring process data and controlling machine functions in S7 PLC environments.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Greyish White
Country of origin
Germany

Recently Viewed Products

Technical knowledge

Micro Drive Specialist EMS Bets on Custom Engineering to Broaden Market Appeal

UK micro-drive specialist EMS is pairing Faulhaber high-torque gearheads and compact motion controllers with in-house custom engineering—aiming beyond catalog sales into tailored mechatronics.

Bringing Object-Oriented Thinking to PLC Programming

Copy-paste ladder does not scale. Object-oriented PLC techniques—user-defined structures and instructions—cut duplication, propagate fixes once, and keep large multi-device programs readable.

Why Process Safety Management Programs Fail Even When OSHA Boxes Are Checked

OSHA boxes checked is not the same as a living PSM system. Refinery history shows programs fail when procedures, training, contractors, and investigations drift from how the plant actually runs.

What Is SCADA? Supervisory Control Without Replacing the PLC

SCADA sits above PLCs and RTUs: it acquires field data, alarms operators, and issues supervisory commands across plants and remote assets—without replacing local deterministic control.

What Is a VFD? Variable Frequency Drives That Actually Move the Needle

A VFD turns fixed-frequency mains into controlled voltage and frequency so AC motors match real load—cutting pump and fan energy while tightening torque, soft-start, and braking behavior.

What Is a PLC? The Controllers That Still Run the Plant Floor

PLCs still run the plant floor: scan cycles, I/O, and IEC 61131-3 languages decide whether machines stay deterministic. Here is how controllers work, where they win, and where they strain.