Siemens

Siemens 6AV7614-0AE30-0CF0 SIMATIC Panel PC 670 15" TFT Touch Display

SKU 6AV7614-0AE30-0CF0

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6AV7614-0AE30-0CF0

  • Country of origin:Germany

  • Product Type: Industrial Panel PC

  • Barcode: 85371091

  • Payment: T/T, Western Union

  • Weight: 4g

  • Dimensions: Corrections Applied: none

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6AV7614-0AE30-0CF0 is a SIMATIC Panel PC 670, an industrial panel computer featuring a 15" TFT Touch Display. This unit is configured with a 40 GB HD, 256 MBYTE RAM, and a Celeron 300 MHz CPU, making it suitable for human-machine interface (HMI) and control tasks in various industrial automation environments. It operates on a 115-230 V power supply and comes pre-installed with an English version of Windows 98.

Features

  • 15" TFT Touch Display
  • Standard configuration with 40 GB Hard Drive
  • 256 MBYTE RAM
  • Celeron 300 MHz CPU
  • 115-230 V power supply compatibility
  • Pre-installed Windows 98 (English)
  • Designed for industrial applications

Applications

The SIMATIC Panel PC 670 is typically deployed in industrial settings requiring a robust and integrated HMI and control platform. Common applications include:

  • Machine operation and visualization
  • Process control and monitoring
  • Data acquisition and display
  • Factory automation systems
  • Building management systems

Technical Specifications

Parameter Value
Manufacturer Siemens
Brand Siemens
Range Simatic Panel PC
Subrange PC670
Type of Product PC panels
Display Type 15" TFT Touch Display
Hard Drive 40 GB HD
RAM 256 MBYTE RAM
CPU Celeron 300 MHz
Power Supply 115-230 V
Operating System WIN98 English
Product Phase Obsolete
Shipping Weight 4.00 kg
Commodity Code 85371091
Export Control Regulations (ECCN) N

Installation Guidelines

Proper installation ensures reliable operation and longevity of the SIMATIC Panel PC. Adhere to the following general guidelines:

  1. De-energize System: Before commencing any installation work, ensure that all power to the control cabinet or machine is disconnected and secured against accidental re-energization.
  2. Mounting: Mount the Panel PC securely into a prepared panel cutout. Ensure adequate clearance for ventilation and cable routing. Use appropriate mounting hardware to prevent vibration.
  3. Power Connection: Connect the 115-230 V AC mains cable to the designated power input terminal. Verify correct voltage and polarity. Ensure the power supply is stable and within the specified range.
  4. Grounding: Establish a proper protective earth (PE) connection to the Panel PC chassis. A robust grounding system is crucial for electrical safety and electromagnetic compatibility (EMC).
  5. Peripheral Connections: Connect any necessary peripherals such as keyboards, mice, or external storage devices to the appropriate ports.
  6. Network Connections: If applicable, connect Ethernet cables for network communication. Ensure proper cable routing to avoid interference.
  7. Environmental Considerations: Ensure the installation location provides adequate cooling and protection from excessive dust, moisture, and extreme temperatures.
  8. Power Up: After all connections are secure and verified, restore power to the system and observe the Panel PC's startup sequence.

FAQ

What is the primary function of the Siemens 6AV7614-0AE30-0CF0?

It functions as an industrial panel computer and human-machine interface (HMI) for visualization and control tasks in automation systems.

What operating system is pre-installed on this Panel PC?

The unit comes with an English version of Windows 98 pre-installed.

What are the power supply requirements for this device?

The Panel PC operates on a 115-230 V AC mains power supply.

Can the hard drive or RAM be upgraded?

The standard configuration includes a 40 GB HD and 256 MBYTE RAM. While physical upgrades might be possible, compatibility and driver support for an obsolete system should be verified.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 7 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Diagnosing IC693MDL916 Relay Outputs Before Module Replacement

A field checklist for IC693MDL916 relay commands, terminal blocks, load current, switching rate and contact-side measurements.

Troubleshooting Beckhoff KL1512 Counter Inputs and Mapping

A field checklist for KL1512 signal thresholds, counter direction, process data and the KL1512-to-KS1512 wiring difference.

Troubleshooting Beckhoff EPP2008-0001 Output Faults

A field checklist for EPP2008-0001 current limits, supply voltage, channel LEDs, connector coding and load-related output faults.

Moving TwinCAT 3 Licenses with C9900-L100: Build and Device Checks

Before moving a TwinCAT 3 license with a Beckhoff C9900-L100, verify the TwinCAT build, XML device description, exact order code and cabinet limits.

Replacing a Beckhoff EL4032: Wiring and Output Checks

A field checklist for replacing a Beckhoff EL4032, covering the ±10 V load, terminal map, power contacts, EtherCAT state, and watchdog behavior.

Replacing Yokogawa AAI835: Wiring and Barrier Checks Before Swap

Before replacing a Yokogawa AAI835, verify the 4-in/4-out channel map, power-loss loop behavior, barrier type, output load, cable, and redundancy.