Siemens

Siemens 6AV7615-0AE10-0AH0 SIMATIC Panel PC 670

SKU 6AV7615-0AE10-0AH0

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6AV7615-0AE10-0AH0

  • Country of origin:Germany

  • Product Type: Panel PC

  • Barcode: 85371091

  • Payment: T/T, Western Union

  • Weight: 4g

  • Dimensions: To be calculated

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6AV7615-0AE10-0AH0 is a SIMATIC Panel PC 670, an industrial panel personal computer designed for HMI and control tasks in automation environments. This specific configuration features a 15-inch TFT display, a 40 GB hard drive, 64 MB of RAM, and is powered by a Celeron 300 MHz CPU. It operates on a 24 V DC power supply and comes pre-installed with Windows NT 4.0 German operating system. The unit is part of the SIMATIC Panel PC range, specifically the PC670 subrange, and is categorized as an obsolete product phase.

Features

  • SIMATIC Panel PC 670 series
  • Integrated 15-inch TFT display
  • Celeron 300 MHz processor
  • 64 MB RAM
  • 40 GB hard disk drive
  • 24 V DC power input
  • Pre-installed with Windows NT 4.0 (German version)

Applications

The Siemens SIMATIC Panel PC 670 is suitable for various industrial applications requiring local visualization, data acquisition, and control. Typical deployments include:

  • Machine operation and monitoring
  • Process control visualization
  • Data logging and trending
  • Manufacturing execution systems (MES) interfaces
  • Building automation control panels

Technical Specifications

Parameter Value
Brand Siemens
Manufacturer Siemens
Range SIMATIC Panel PC
Subrange PC670
Product Type Panel PC
Display 15-inch TFT
CPU Celeron 300 MHz
RAM 64 MBYTE
Hard Drive 40 GB HD
Power Supply 24 V DC
Operating System Windows NT 4.0 German
Product Phase Obsolete
Shipping Weight 4.00 kg
Commodity Code 85371091
Export Control Regulations (ECCN) N
Country of Origin Not specified
Package Dimensions (Calculated) To be calculated

Installation Guidelines

  1. De-energize System: Before commencing installation, ensure all power to the control cabinet or mounting location is disconnected and secured against accidental re-energization.
  2. Mounting: Install the Panel PC into a prepared panel cutout. Secure the unit using the provided mounting clamps or screws, ensuring a tight and stable fit to maintain proper sealing and vibration resistance.
  3. Power Connection: Connect the 24 V DC power supply to the designated terminals, observing correct polarity. Ensure the power source is adequately fused and capable of supplying the required current.
  4. Grounding: Connect the protective earth (PE) terminal of the Panel PC to the central grounding point of the control cabinet. This is crucial for safety and electromagnetic compatibility.
  5. Peripheral Connections: Connect any required peripherals such as keyboards, mice, or external communication cables to the appropriate ports. Ensure cables are routed to prevent strain and interference.
  6. Cable Management: Route all cables neatly and secure them to prevent accidental disconnections or damage. Separate power cables from signal cables to minimize electromagnetic interference.
  7. Ventilation: Ensure adequate clearance around the Panel PC for proper ventilation and heat dissipation, especially if operating in high ambient temperatures.
  8. Power On: After all connections are verified, re-energize the system and power on the Panel PC. Verify proper boot-up and functionality of the operating system and display.

FAQ

What is the display size and type of the 6AV7615-0AE10-0AH0?

The unit features a 15-inch TFT display.

What operating system is pre-installed on this Panel PC?

It comes with Windows NT 4.0 German pre-installed.

What power supply is required for the SIMATIC Panel PC 670?

The Panel PC operates on a 24 V DC power supply.

What are the key hardware specifications of this model?

It includes a Celeron 300 MHz CPU, 64 MB of RAM, and a 40 GB hard drive.

Is the 6AV7615-0AE10-0AH0 still actively manufactured?

No, this product is classified as obsolete.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 3 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Commissioning PLX32-EIP-MBTCP: Subnets, Registers, and RPI

A commissioning checklist for the ProSoft PLX32-EIP-MBTCP covering subnet separation, register contracts, EtherNet/IP timing, failure tests and replacement records.

Diagnosing IC693MDL916 Relay Outputs Before Module Replacement

A field checklist for IC693MDL916 relay commands, terminal blocks, load current, switching rate and contact-side measurements.

Troubleshooting Beckhoff KL1512 Counter Inputs and Mapping

A field checklist for KL1512 signal thresholds, counter direction, process data and the KL1512-to-KS1512 wiring difference.

Troubleshooting Beckhoff EPP2008-0001 Output Faults

A field checklist for EPP2008-0001 current limits, supply voltage, channel LEDs, connector coding and load-related output faults.

Moving TwinCAT 3 Licenses with C9900-L100: Build and Device Checks

Before moving a TwinCAT 3 license with a Beckhoff C9900-L100, verify the TwinCAT build, XML device description, exact order code and cabinet limits.

Replacing a Beckhoff EL4032: Wiring and Output Checks

A field checklist for replacing a Beckhoff EL4032, covering the ±10 V load, terminal map, power contacts, EtherCAT state, and watchdog behavior.