Description
The Siemens 6AV7873-1AC20-1AC0 is a SIMATIC Panel PC 677B, designed for industrial automation and visualization tasks. This robust panel PC features a 15-inch key display with a resolution of 1024 x 768 pixels. It is equipped with a Core 2 Duo T5500 processor running at 1.66 GHz, supported by 1 GB of DDR2 RAM and a 160 GByte SATA HDD (3.5"). For data storage and media, it includes a DVD+-R+-RW drive. Communication capabilities are extensive, offering two 10/100/1000 Mbit/s Ethernet ports, four USB V2.0 interfaces, and one serial (COM1) port. Additionally, it supports PROFIBUS/MP communication with 2MB buffered SRAM. The unit operates on a DC 24V power supply and comes pre-installed with Windows XP Professional MUI, supporting multiple languages (English, German, French, Italian, Spanish, Japanese, Chinese, Korean).
Features
- 15-inch Key Display with 1024 x 768 Resolution
- Integrated Core 2 Duo T5500 Processor (1.66 GHz)
- 1 GB DDR2 RAM and 160 GByte SATA HDD (3.5")
- Dual 10/100/1000 Mbit/s Ethernet Interfaces
- Multiple USB V2.0 and Serial (COM1) Ports
- PROFIBUS/MP Communication with 2MB Buffered SRAM
- DC 24V Power Supply
- Pre-installed Windows XP Professional MUI (Multi-Language)
- Includes DVD+-R+-RW Drive and 2x PCI Slots
Applications
The Siemens SIMATIC Panel PC 677B is suitable for a wide range of industrial applications requiring robust computing and visualization capabilities. Typical deployments include:
- Human-Machine Interface (HMI) for machine control and process visualization.
- Data acquisition and processing in manufacturing environments.
- Supervisory control and data logging in process automation.
- Integration into control cabinets for plant-wide monitoring.
- Industrial workstations requiring a compact and durable form factor.
Technical Specifications
| Brand |
Siemens |
| Manufacturer |
Siemens |
| Range |
Simatic Panel PC |
| Subrange |
PC677B |
| Product Type |
PC panels |
| PLM Product Phase |
Obsolete |
| Ethernet Ports |
2x 10/100/1000 Mbit/s |
| USB Ports |
4x USB V2.0 (without front-side USB interface) |
| Serial Port |
1x (COM1) |
| Display Size |
15 inches |
| Display Resolution |
1024 x 768 |
| Power Supply |
DC 24V |
| Processor |
Core 2 Duo T5500, 1.66 GHz |
| SLC |
2MB |
| PCI Slots |
2x |
| RAM |
1 GB DDR2 |
| Hard Disk Drive |
160 GByte SATA HDD 3.5" (with HDD only) |
| Optical Drive |
DVD+-R+-RW |
| Fieldbus Interface |
PROFIBUS/MP |
| Buffered SRAM |
2MB |
| Operating System |
Windows XP Professional MUI (EN,GE,FR,IT,SP,JP,CHN,KOR) |
| Package Dimensions (Calculated) |
67.00 x 83.00 x 11.50 cm |
| Shipping Weight |
17.00 kg |
| Commodity Code |
85371098 |
| Export Control Regulations (ECCN) |
N |
Installation Guidelines
-
De-energize System: Ensure all power to the installation area and connected systems is completely de-energized before beginning any work.
-
Mounting: Securely mount the Panel PC in its designated panel cutout or enclosure, ensuring adequate clearance for ventilation and cable routing.
-
Power Connection: Connect the DC 24V power supply to the appropriate terminals, observing correct polarity. Verify the power source meets the specified voltage and current requirements.
-
Grounding: Establish a proper protective earth (PE) connection to the Panel PC chassis to ensure electrical safety and minimize electromagnetic interference.
-
Ethernet Connections: Connect Ethernet cables to the 10/100/1000 Mbit/s ports for network integration. Use shielded cables in noisy industrial environments.
-
USB and Serial Connections: Connect USB devices and serial communication cables (COM1) as required for peripherals or field devices.
-
PROFIBUS/MP Connection: If utilizing PROFIBUS/MP, connect the bus cable to the designated interface, ensuring correct termination and shielding practices.
-
Ventilation: Ensure that the installation provides sufficient airflow around the unit to prevent overheating, especially given the integrated components.
-
Cable Management: Route all cables neatly and securely, separating power and signal cables to reduce interference.
-
System Power-Up: After all connections are verified, re-energize the system and observe for proper operation.