Description
The Siemens 6AV7893-0BG40-0AE0 is a SIMATIC IPC677C Panel PC designed for demanding Human Machine Interface (HMI) applications in industrial environments. This unit integrates a high-performance computer with a 15-inch keypad display. It is powered by an Intel Core i7-610E processor and equipped with 8 GB of DDR3 RAM and a 250 GB SATA hard disk drive. Connectivity options include dual Gigabit Ethernet ports, multiple USB 2.0 interfaces, and a serial port. The system features integrated monitoring for watchdog, temperature, and fan status, along with an onboard RAID controller for data reliability. This specific configuration is supplied with a 110/230 V AC power supply and comes pre-installed with Windows 7 Ultimate (64-bit).
Features
- 15-inch display with keypad interface (1024 x 768 resolution).
- Intel Core i7-610E dual-core processor (2.53 GHz).
- Onboard RAID controller for enhanced data integrity.
- Integrated system monitoring for watchdog timer, temperature, and fan speed.
- Dual 10/100/1000 Mbit/s Ethernet ports for network connectivity.
- Convenient front-side USB 2.0 port for easy access.
- Two free PCI slots for hardware expansion.
- Pre-installed Windows 7 Ultimate (64-bit) with multi-language support.
Applications
- Process visualization and control systems.
- Machine-level data acquisition and HMI tasks.
- Manufacturing Execution Systems (MES) terminals.
- Industrial control rooms and operator stations.
- Automation applications requiring a robust, integrated PC platform.
Technical Specifications
| Category |
Specification |
| Product Type |
SIMATIC HMI IPC677C (Panel PC) |
| Processor |
Intel Core i7-610E (2 Cores / 4 Threads, 2.53 GHz, Turbo Boost, Hyper-Threading, VT, 4 MB Cache) |
| Memory |
8 GB DDR3 1066 DIMM |
| Storage |
250 GB HDD SATA |
| Display |
15-inch Keypad Interface |
| Resolution |
1024 x 768 pixels |
| Power Supply |
110/230 V AC with NAMUR |
| Operating System |
Windows 7 Ultimate 64-bit SP1, MUI (de, en, fr, es, it) |
| Expansion Slots |
2x PCI (free) |
| Optical Drive |
Not included |
| System Monitoring |
Watchdog, Temperature and Fan Monitoring |
| RAID Controller |
Onboard |
| Product Lifecycle Status |
Phase-Out |
| Country of Origin |
Germany (estimated) |
| Manufacturer |
Siemens |
| Package Dimensions (Calculated) |
22.0 x 46.7 x 22.5 cm |
| Shipping Weight |
17.35 kg |
Connections and Interfaces
| Interface |
Quantity & Type |
| Ethernet |
2 x 10/100/1000 Mbit/s |
| USB |
4 x USB 2.0 (rear) |
| Front USB |
1 x USB 2.0 |
| Serial |
1 x COM1 |
Installation Guidelines
CRITICAL WARNING: Electrical Hazard. Disconnect all power sources and follow Lockout/Tagout (LOTO) procedures before installation or servicing. Installation must be performed by qualified personnel familiar with industrial control panel standards and practices.
-
1
Panel Cutout and Mounting: Prepare the control cabinet panel cutout according to the device's mechanical drawings. Ensure the mounting surface is flat and clean. Install the Panel PC and secure it using all provided mounting clamps, tightening them evenly to the specified torque to ensure a proper seal and prevent chassis distortion.
-
2
Protective Earth (PE) Connection: Connect the chassis to the main protective earth conductor of the control cabinet. Use a low-impedance connection with a short, large-gauge wire. This is critical for both safety and electromagnetic compatibility (EMC).
-
3
Power Supply Connection: Connect the 110/230 V AC power supply using the provided power cable. Ensure the source voltage matches the unit's rating. Route power cables separately from signal and communication cables to minimize electrical noise interference.
-
4
I/O and Network Cabling: Connect Ethernet, USB, and serial devices as required. Use shielded cables for all data communication lines. Ensure cable shields are properly terminated at one end, typically at the cabinet's ground bar, to prevent ground loops. Secure all cables to prevent strain on the connectors.
-
5
Initial Power-Up: After verifying all connections, remove LOTO devices and apply power to the unit. Observe the boot sequence to ensure the operating system loads correctly. Proceed with software configuration and application deployment.