Siemens

Siemens 6ES7315-6TG10-0AB0 SIMATIC S7-300 CPU 315T-2 DP

SKU 6ES7315-6TG10-0AB0

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6ES7315-6TG10-0AB0

  • Country of origin:Germany

  • Product Type: Central Processing Unit

  • Barcode: 85371091

  • Payment: T/T, Western Union

  • Weight: 600g

  • Dimensions: 17.80 x 12.70 x 15.20 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6ES7315-6TG10-0AB0 is a SIMATIC S7-300 CPU 315T-2 DP, a central processing unit engineered for advanced automation tasks within industrial environments. This CPU is equipped with 128 KByte working memory, facilitating efficient data processing for complex production processes. It features two high-speed communication interfaces: a primary MPI/DP interface supporting data rates up to 12 Mbit/s, and a dedicated DP (Drive) interface for seamless integration with drives and other field devices. Integrated I/O for technology applications is accessible via a 40-pin front connector, which simplifies installation and maintenance within control cabinets. The 6ES7315-6TG10-0AB0 requires a minimum 4MB Micro Memory Card for operation, making it a robust and dependable solution for evolving manufacturing needs.

Features

  • 128 KByte working memory
  • Integrated MPI/DP interface with 12 Mbit/s data rate
  • Dedicated DP (Drive) interface for drive communication
  • Integrated I/O for technology applications
  • Single 40-pin front connector for I/O access
  • Requires minimum 4MB Micro Memory Card

Applications

  • Advanced automation tasks in manufacturing
  • Control systems for complex production processes
  • Integration with industrial drives and field devices
  • General PLC control within the SIMATIC S7-300 platform

Technical Specifications

Parameter Value
Manufacturer Siemens
Brand Siemens
Range Simatic S7
Subrange S7-300
Product Type Standard CPUs, CPU 315T-2 DP
PLM Product Phase Obsolete
Working Memory 128 KByte
Interface 1 MPI/DP, 12 Mbit/s
Interface 2 DP (Drive)
Integrated I/O Connector 1 x 40-pin front connector
Memory Card Requirement Minimum 4MB Micro Memory Card
Package Dimensions (Calculated) 17.80 x 12.70 x 15.20 cm
Shipping Weight 0.60 kg
Commodity Code 85371091
Export Control Regulations (ECCN) N

Connections / Interfaces

Interface Type Description
MPI/DP Multi-Point Interface / Distributed Periphery, 12 Mbit/s
DP (Drive) Dedicated Distributed Periphery interface for drive communication
Front Connector 1 x 40-pin connector for integrated I/O
Micro Memory Card Slot For program and data storage, requires minimum 4MB card

Installation Guidelines

  1. Safety First: Ensure all power to the rack or control cabinet is de-energized and locked out before beginning installation.
  2. Mounting: Insert the CPU module into the designated slot on the SIMATIC S7-300 rack. Ensure it is securely seated and locked into place using the module's retaining clips.
  3. Memory Card Insertion: Carefully insert a Micro Memory Card (minimum 4MB) into the designated slot on the CPU. Ensure it clicks into place.
  4. Front Connector Attachment: Connect the 40-pin front connector to the CPU for integrated I/O. Verify that all wiring to the connector is correct and secure according to your system's wiring diagrams.
  5. Communication Cabling: Connect the MPI/DP and DP (Drive) communication cables to their respective ports on the CPU. Ensure proper termination and shielding for optimal signal integrity.
  6. Power-Up: After all connections are verified, re-energize the system. Observe the CPU's status LEDs for proper operation.
  7. Configuration: Use appropriate Siemens engineering software (e.g., STEP 7) to configure the CPU, load the application program, and set up communication parameters.

FAQ

What is the working memory capacity of the 6ES7315-6TG10-0AB0?

The CPU 315T-2 DP is equipped with 128 KByte of working memory.

What communication interfaces are available on this CPU?

It features an MPI/DP interface with 12 Mbit/s and a dedicated DP (Drive) interface for communication with drives.

What type of memory card is required for operation?

The CPU requires a Micro Memory Card with a minimum capacity of 4MB.

How is the integrated I/O accessed?

Integrated I/O for technology applications is accessible via a 40-pin front connector.

Is this CPU suitable for connecting to industrial drives?

Yes, it includes a dedicated DP (Drive) interface designed for seamless communication with industrial drives.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 7
Only 5 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Grounded or Floating 24 VDC? A Control-Panel Decision Guide

Grounding one side of a 24 VDC supply can improve fault detection and voltage reference, while floating circuits support isolation. This guide explains bonding, noise, first-fault behavior, and...

Seal-In Logic or OTL/OTU? Choosing PLC Memory Safely

Seal-in circuits and OTL/OTU instructions can hold the same command, but they fail differently. This guide compares scan behavior, restart risk, troubleshooting, permissives, and safer PLC design...

Commissioning a Micro800 PLC in FactoryTalk Design Workbench

A practical Micro800 commissioning workflow covering hardware checks, USB and Ethernet discovery, safe ladder testing, download risks, fault isolation, and project recovery in FactoryTalk Design...

Derivative Action in PID Control Without Noise Problems

Learn what derivative action contributes to a PID loop, why it can amplify measurement noise and setpoint changes, and how filtering, sampling, and staged tests make D tuning safer.

Designing Industrial Networks That Stay Troubleshootable

A practical guide to segmenting, documenting, and testing industrial Ethernet networks so plant teams can isolate faults quickly, control change, and expand without creating fragile dependencies.

Commissioning IO-Link From Master Ports to IODD Data

Commission IO-Link systematically from master addressing and port modes through IODD selection, PLC byte mapping, parameter backups, device validation, and failure-injection tests.