Siemens

Siemens 6ES7410-5FM08-0AB0 SIMATIC S7-400 CPU 410SIS Safety Controller

SKU 6ES7410-5FM08-0AB0

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6ES7410-5FM08-0AB0

  • Country of origin:Germany

  • Product Type: Safety PLC CPU

  • Barcode: 85389091

  • Payment: T/T, Western Union

  • Weight: 1490g

  • Dimensions: 29.0 cm x 21.9 cm x 5.0 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6ES7410-5FM08-0AB0 is a CPU 410SIS Safety Controller, a central processing unit designed for the SIMATIC S7-400F (fail-safe) and S7-400FH (fault-tolerant, high-availability) automation systems. This module provides robust control and communication capabilities for safety-critical applications. It features a total of 5 interfaces, including 2x PROFINET (PN), 1x PROFIBUS DP, and 2x interfaces for Sync modules used in redundant configurations. This unit is supplied as a spare part and does not include a System Expansion Card.

Features

  • Integrated safety controller for S7-400F and S7-400FH systems.
  • Multi-protocol support with onboard PROFINET and PROFIBUS DP ports.
  • Dedicated interfaces for synchronization modules to enable high-availability operation.
  • Designed for use as a direct replacement spare part.

Applications

  • Process control systems requiring functional safety (SIL).
  • Fault-tolerant and redundant automation architectures.
  • Emergency shutdown systems (ESD) and burner management systems (BMS).
  • Critical infrastructure and manufacturing plant control.

Technical Specifications

Specification Value
Manufacturer Siemens
Product Series SIMATIC S7-400
Model Number 6ES7410-5FM08-0AB0
Product Type CPU 410SIS Safety Controller
System Compatibility S7-400F, S7-400FH
Interfaces 2x PROFINET, 1x PROFIBUS DP, 2x Sync Module
System Expansion Card Not Included
Product Lifecycle Status Phase-Out
Shipping Weight 1.49 kg
Package Dimensions (Calculated) 29.0 cm x 21.9 cm x 5.0 cm
Commodity Code 85389091
ECCN EAR99
Country of Origin Germany (Estimate)

Installation Guidelines

CRITICAL WARNING: Installation or replacement of safety-rated hardware must be performed by qualified personnel only. Failure to follow proper procedures, including system validation and testing, can result in equipment damage, serious injury, or death. Always adhere to local safety regulations and site-specific protocols.
  1. 1 De-energize the entire S7-400 rack and apply Lockout/Tagout (LOTO) procedures to all power sources.
  2. 2 Verify the absence of voltage at the power supply terminals using a calibrated multimeter.
  3. 3 Use a properly grounded ESD wrist strap to prevent electrostatic discharge damage to the CPU.
  4. 4 Carefully align the CPU module with the guide rails of the designated slot in the S7-400 rack.
  5. 5 Slide the module into the rack and apply firm, even pressure to ensure it is fully seated on the backplane connectors.
  6. 6 Secure the module in place by tightening the retaining screws located on the front panel. Do not overtighten.
  7. 7 Connect all required communication cables (PROFINET, PROFIBUS DP) and synchronization module fiber optic cables to their respective ports.
  8. 8 Once all connections are verified, remove LOTO devices and re-energize the system for commissioning and a full functional safety test.

FAQ

What systems is this CPU compatible with?

The 6ES7410-5FM08-0AB0 CPU is specifically designed for Siemens SIMATIC S7-400F (fail-safe) and S7-400FH (fault-tolerant, high-availability) automation systems.

What communication interfaces are included on this module?

This safety controller features five integrated interfaces: two for PROFINET (PN), one for PROFIBUS DP, and two dedicated ports for synchronization modules used in redundant H-systems.

Is a System Expansion Card included with this part number?

No, this unit is supplied as a spare part and does not include the System Expansion Card. It must be ordered separately if required for a new installation.

What is the product lifecycle status of this CPU?

According to the provided information, this product is in the 'Phase-Out' stage of its lifecycle, indicating it is being discontinued but may still be available for spare parts.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 2 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Derivative Action in PID Control Without Noise Problems

Learn what derivative action contributes to a PID loop, why it can amplify measurement noise and setpoint changes, and how filtering, sampling, and staged tests make D tuning safer.

Designing Industrial Networks That Stay Troubleshootable

A practical guide to segmenting, documenting, and testing industrial Ethernet networks so plant teams can isolate faults quickly, control change, and expand without creating fragile dependencies.

Commissioning IO-Link From Master Ports to IODD Data

Commission IO-Link systematically from master addressing and port modes through IODD selection, PLC byte mapping, parameter backups, device validation, and failure-injection tests.

PowerFlex Dynamic Braking Resistor Design and Testing

A practical PowerFlex braking guide covering regenerative energy, resistor resistance and duty cycle, thermal protection, model-specific parameters, and measured commissioning tests.

Engineering Industrial Joystick Controls for Safe Motion

An industrial joystick is only the first element in a safe motion command chain. This guide covers sensing choices, wiring, signal validation, PLC logic, restart behavior, and commissioning for...

Seeing PID Behavior Before Tuning the Loop

PID tuning becomes safer when engineers can see how proportional, integral, and derivative actions reshape error, output, and response over time. This guide turns live trends into a disciplined...