Description
The Siemens
6ES7647-6CA03-0BA0 is a
SIMATIC IPC627C Box PC designed for industrial automation applications. This robust industrial computer features onboard HD graphics, dual 10/100/1000 Mbit/s Ethernet ports, four high-current USB V2.0 ports, and one serial (COM 1) interface. It includes an onboard RAID controller for data redundancy, a front-accessible CompactFlash drive, and integrated watchdog, temperature, and fan monitoring for reliable operation. Powered by an Intel Celeron P4505 processor (1.86 GHz) with 1 GB DDR3 memory, it comes equipped with a 250 GB SATA HDD, a DVD +/-RW drive, and pre-installed Windows XP Professional SP3 MUI. The unit operates on an AC 110/230V industrial power supply unit with NAMUR compatibility.
Features
- HD Graphics Onboard
- Dual 10/100/1000 Mbit/s Ethernet (RJ45)
- Four USB V2.0 Ports (High Current)
- One Serial Port (COM 1)
- Onboard RAID Controller
- Front-accessible CompactFlash Drive No. 1
- Watchdog and Temperature/Fan Monitoring
- Intel Celeron P4505 Processor (2C/2T, 1.86 GHz, VT, 2 MB Cache)
- 1 GB DDR3 1066 DIMM Memory
- AC 110/230V Industrial Power Supply Unit with NAMUR
- 2x Free PCI Slots
- 250 GB SATA HDD
- DVD +/-RW Drive
- Pre-installed Windows XP Professional SP3 MUI (DE, EN, FR, ES, IT)
Applications
The SIMATIC IPC627C Box PC is suitable for a wide range of industrial applications requiring a reliable and compact computing platform, including:
- Machine control and automation systems
- Data acquisition and processing
- Human Machine Interface (HMI) and visualization
- SCADA system integration
- Process control and monitoring
- Industrial communication gateways
Technical Specifications
| Manufacturer |
Siemens |
| Product Range |
SIMATIC Box PC |
| Subrange |
IPC627C |
| Product Type |
Box PC |
| Processor |
Intel Celeron P4505 (2C/2T, 1.86 GHz, VT, 2 MB Cache) |
| Memory |
1 GB DDR3 1066 DIMM |
| Storage |
250 GB HDD SATA |
| Optical Drive |
DVD +/-RW |
| Operating System |
Windows XP Professional SP3 MUI (DE, EN, FR, ES, IT) |
| Graphics |
HD Graphic Onboard |
| Ethernet Ports |
2x 10/100/1000 Mbit/s RJ45 |
| USB Ports |
4x USB V2.0 (High Current) |
| Serial Ports |
1x (COM 1) |
| Expansion Slots |
2x PCI Free |
| Additional Features |
RAID Controller Onboard, CompactFlash Drive No. 1 (Front), Watchdog, Temp./Fan Monitoring |
| Power Supply |
AC 110/230V Industrial Power Supply Unit with NAMUR |
| Power Cable |
USA |
| Product Phase |
Phase-Out |
| Country of Origin |
Germany |
| Package Dimensions (Calculated) |
120.50 x 50.50 x 10.00 cm |
| Shipping Weight |
7.05 kg |
| Commodity Code |
85371091 |
| Export Control Regulations (ECCN) |
5A992 |
Connections / Interfaces
-
Ethernet: 2x RJ45 ports for 10/100/1000 Mbit/s connectivity.
-
USB: 4x USB V2.0 ports, supporting high current devices.
-
Serial: 1x COM 1 port for serial communication.
-
CompactFlash: 1x front-accessible CompactFlash drive slot.
Installation Guidelines
-
De-energization: Ensure all power to the installation area is disconnected and locked out before beginning any work.
-
Mounting: Mount the Box PC securely in a suitable industrial enclosure or control cabinet, ensuring adequate ventilation for heat dissipation.
-
Power Connection: Connect the AC 110/230V industrial power supply unit to a stable power source. Verify correct voltage and polarity. The unit is compatible with NAMUR standards.
-
Grounding: Establish a proper protective earth (PE) connection to the chassis of the Box PC to ensure electrical safety and minimize electromagnetic interference.
-
Ethernet Connection: Connect industrial Ethernet cables to the RJ45 ports for network integration. Use shielded cables in noisy environments.
-
Peripheral Connections: Connect USB devices, serial devices, and any other required peripherals to their respective ports.
-
Expansion Cards: If utilizing the 2x PCI free slots, ensure proper installation and secure fastening of expansion cards according to their manufacturer's instructions.
-
Cable Routing: Route all cables neatly and securely, separating power cables from signal cables to prevent interference.
-
Initial Power-Up: After all connections are verified, re-energize the system and observe for proper boot-up and operation.