Siemens

Siemens 6ES7647-6CG00-0FX0 SIMATIC IPC627C Box PC

SKU 6ES7647-6CG00-0FX0

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6ES7647-6CG00-0FX0

  • Country of origin:Germany

  • Product Type: Industrial Box PC

  • Barcode: 85371099

  • Payment: T/T, Western Union

  • Weight: 7050g

  • Dimensions: 92.0 x 21.0 x 14.0 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6ES7647-6CG00-0FX0 is a SIMATIC IPC627C series Box PC designed for demanding industrial automation applications. This unit is configured with an Intel Core i7-610E processor, 1 GB of DDR3 RAM, and a dual storage configuration of 2x 320 GB SATA hard drives managed by an onboard RAID controller. It features an integrated industrial power supply compatible with 110/230V AC inputs and includes essential system monitoring functions such as a watchdog timer and temperature/fan monitoring. Connectivity is provided through dual Gigabit Ethernet ports, high-current USB 2.0 ports, and a serial interface. This model is supplied without a pre-installed operating system.

Features

  • ■Intel Core i7-610E Processor (2.53 GHz, 2 Cores / 4 Threads)
  • ■1 GB DDR3 1066 DIMM Memory
  • ■Dual 320 GB SATA Hard Drives
  • ■Onboard RAID Controller for data redundancy or performance
  • ■Dual 10/100/1000 Mbit/s Ethernet ports for network connectivity
  • ■Integrated system monitoring with Watchdog, Temperature, and Fan sensors
  • ■DVD+/-RW optical drive and front-accessible CompactFlash slot
  • ■Two free PCI slots for hardware expansion

Applications

  • ■Machine-level data processing and visualization
  • ■Process control and monitoring systems
  • ■Industrial gateways and data loggers
  • ■Supervisory Control and Data Acquisition (SCADA) nodes

Technical Specifications

General Information
Manufacturer Siemens
Product Series SIMATIC IPC627C
Model Number 6ES7647-6CG00-0FX0
Product Type Box PC
Product Lifecycle Status Phase-Out
Processing Unit
CPU Intel Core i7-610E
Cores / Threads 2 Cores / 4 Threads
Clock Speed 2.53 GHz
Cache 4 MB
Features Turbo Boost (TB), Hyper-Threading (HT), Virtualization Technology (VT), Active Management Technology (AMT)
Memory and Storage
RAM 1 GB DDR3 1066 DIMM
Hard Drive 2x 320 GB SATA
RAID Controller Onboard
Optical Drive DVD +/-RW
Removable Media CompactFlash Drive No. 1 (Front)
Interfaces and Expansion
Ethernet 2x 10/100/1000 Mbit/s RJ45
USB 4x USB V2.0 (High Current)
Serial 1x COM 1
Graphics HD Graphic Onboard
Expansion Slots 2x PCI (Free)
Power Supply
Input Voltage 110/230V AC
Type Industrial Power Supply Unit with NAMUR
Power Cable Europe
Physical and Environmental
System Monitoring Watchdog, Temperature/Fan Monitoring
Package Dimensions (Calculated) 92.0 x 21.0 x 14.0 cm
Shipping Weight 7.05 kg
Country of Origin Germany (Estimate)
Commodity Code 85371099

Installation Guidelines

CRITICAL WARNING: Hazardous voltages are present. Installation must be performed by qualified personnel only. Failure to follow safety procedures can result in severe injury, death, or equipment damage. Always de-energize and lock out/tag out (LOTO) all power sources before installation or maintenance.
  1. 1 De-energize the main control cabinet and verify the absence of voltage using a calibrated meter. Apply Lockout/Tagout (LOTO) procedures.
  2. 2 Select a suitable mounting location inside the panel, ensuring adequate clearance for ventilation around the PC chassis as specified by the manufacturer. Avoid proximity to high-noise sources like VFDs.
  3. 3 Securely mount the Box PC chassis to the backplane or mounting plate using all provided mounting points to ensure mechanical stability and proper grounding continuity.
  4. 4 Connect the main AC power cable to the unit's power supply input. Ensure the power source matches the 110/230V AC rating.
  5. 5 Connect a low-impedance protective earth (PE) conductor to the designated chassis grounding terminal. This is critical for safety and EMI protection.
  6. 6 Connect all required peripheral and network cables (Ethernet, USB, Serial). Use shielded cables for data lines where appropriate and ensure shields are properly terminated.
  7. 7 After a final inspection of all connections, remove LOTO devices and re-energize the cabinet to commission the system.
Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 5 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Commissioning Quantum Inputs with the 140XSM00200 Simulator

A controlled commissioning method for using the 140XSM00200 simulator to verify Modicon Quantum input mapping and interlocks before reconnecting field wiring.

Commissioning PLX32-EIP-MBTCP: Subnets, Registers, and RPI

A commissioning checklist for the ProSoft PLX32-EIP-MBTCP covering subnet separation, register contracts, EtherNet/IP timing, failure tests and replacement records.

Diagnosing IC693MDL916 Relay Outputs Before Module Replacement

A field checklist for IC693MDL916 relay commands, terminal blocks, load current, switching rate and contact-side measurements.

Troubleshooting Beckhoff KL1512 Counter Inputs and Mapping

A field checklist for KL1512 signal thresholds, counter direction, process data and the KL1512-to-KS1512 wiring difference.

Troubleshooting Beckhoff EPP2008-0001 Output Faults

A field checklist for EPP2008-0001 current limits, supply voltage, channel LEDs, connector coding and load-related output faults.

Moving TwinCAT 3 Licenses with C9900-L100: Build and Device Checks

Before moving a TwinCAT 3 license with a Beckhoff C9900-L100, verify the TwinCAT build, XML device description, exact order code and cabinet limits.