1 of 1

Omron CJ1W-CLK23 CJ Series Controller Link Unit

Omron CJ1W-CLK23 CJ Series Controller Link Unit

Only 5 item(s) left in stock
  • Manufacturer: Omron

  • Product No.: CJ1W-CLK23

  • Country of origin:Japan

  • Product Type: Controller Link Units

  • Payment: T/T, Western Union

  • Weight: 110g

  • Shipping port: Xiamen

  • Warranty: 12 months

Quantity
View full details

Description

Managing high-capacity peer-to-peer data transfers and message services across industrial networks, the Omron CJ1W-CLK23 serves as a dedicated Controller Link interface module designed for the Sysmac CJ PLC platform. By implementing a deterministic N:N token-bus method, this communication module enables seamless, real-time data exchange between CJ-series CPU units. It utilizes flag synchronization conforming to HDLC frames to guarantee highly reliable transmission over wired shielded twisted-pair cabling. Designed for flexible network scaling, it supports segmented architectures and multi-node configurations directly from the PLC backplane.

Features

  • Deterministic Token-Bus Protocol: Utilizes the N:N token-bus access control method for structured, collision-free industrial data traffic.
  • Dual-Mode Communication: Supports both high-volume data links for cyclic variables and explicit messaging services for event-driven diagnostics.
  • High Node Density: Allows flexible node configurations accommodating up to 62 nodes depending on network topology.
  • High Backplane Capacity: Supports up to 8 Controller Link modules mounted on a single CJ-series CPU rack.
  • Robust Signal Synchronization: Features hardware-level flag synchronization conforming to HDLC framing standards.

Applications

  • Distributed manufacturing line synchronization and inter-PLC coordination.
  • SCADA and industrial workstation communication backbones.
  • High-speed process network clustering requiring deterministic data packet delivery.

Technical Specifications

Parameter Specification
Manufacturer Omron
Model / SKU CJ1W-CLK23
Applicable PLCs All CJ-series CPU Units
Communication Medium Wired shielded twisted-pair (STP) cable
Communication Access Method N:N token-bus method
Data Synchronization Type Flag synchronization (conforms to HDLC frames)
Network Topology Multidrop method (bus type)
Node Capacity 32 or 62 nodes (determined by network parameters)
Max Units per CPU 8
Internal Current Consumption 0.35 A at 5 VDC from PLC bus
Weight 0.11 kg
Shipping Weight (Calculated) 1.15 kg

Alternative Models & Compatibility

The CJ1W-CLK23 is directly compatible with standard Sysmac CJ-series systems, including CJ1G, CJ1H, and CJ2M controllers. It serves as a direct upgrade to older-generation Controller Link units, providing improved message buffer handshakes and diagnostic routing efficiency. Always ensure your CPU unit's firmware and CX-Programmer software are updated to support the full routing table configurations enabled by this unit.

Application Pitfalls & Engineering Notes

A common issue in Controller Link networks is duplicate node setting. The node address is set via rotary switches on the front of the unit; duplicate node addresses will prevent the unit from joining the token ring. Furthermore, since the module draws 0.35 A from the backplane 5 VDC supply, power budget calculations must be verified prior to installation, especially when mounting multiple communication modules on a single rack.

Commissioning & Wiring Tips

To ensure stable, noise-tolerant communication:

  • Always enable the terminating resistance switches at both physical ends of the Controller Link trunk line. Keep all intermediate node terminating switches set to OFF.
  • Ground the shield of the twisted-pair cable at one single point in the network layout to avoid hazardous ground loops.
  • Route the communication cable in a separate conduit from high-voltage motor wiring or VFD cables to minimize electromagnetic interference (EMI).

Installation Guidelines

CRITICAL WARNING: SAFETY COMPLIANCE Always shut down the PLC power supply and bleed all residual charges before inserting, removing, or wiring the Controller Link Unit. Failure to completely de-energize the assembly can cause backplane hardware damage or communication processor corruption.
1

Configure the Unit Number and Node Address using the rotary switches on the front panel prior to physically mounting the module.

2

Align the upper and lower hooks of the CJ1W-CLK23 with the adjacent module or CPU rack connector, pushing until the module locks securely into position.

3

Secure the module lock levers at both the top and bottom of the rack assembly.

4

Connect the wired Controller Link network cable to the terminal block, ensuring correct terminal polarity and that the shielding layout is properly terminated.

What is the maximum node capacity of this Controller Link interface?

The module supports up to 32 or 62 nodes on a single network loop, depending on the network configuration and baud rate settings.

Can I install more than one Controller Link Unit on a single CPU?

Yes, you can mount up to 8 units per CPU rack to configure redundant paths or segment your control network.

What are the power requirements of this communication module?

The module draws a current of 0.35 A directly from the 5V internal backplane power supply of the PLC rack.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Japan

Recently Viewed Products

Technical knowledge

Modernizing Bailey INFI 90 Symphony HMIs Running on OpenVMS Alpha

A practical guide to replacing aging Bailey Symphony operator stations running on OpenVMS Alpha. It compares Alpha emulation, OpenVMS x86 migration, OPC re-platforming, and phased ABB modernization.

Why Maintenance Data Is Essential for Industrial Reliability

Maintenance data connects work orders, sensor signals, asset history, costs, and technician knowledge. Used well, it improves planning, reliability, predictive maintenance, spare-parts control, and...

Сұйықтық қуат жүйелерін ауыстыруға арналған электрлік актуаторлар: Практикалық өнеркәсіптік автоматтандыру нұсқаулығы

Бұл мақала SMC компаниясының e-Actuator сериясы сияқты біріктірілген электрлік актюаторлардың дәстүрлі пневматикалық және гидравликалық жүйелерді ауыстыра отырып, өнеркәсіптік қозғалысты басқаруды...

Өнеркәсіптік автоматтандыру қолданбалары үшін OpenPLC көмегімен математикалық операциялар

Бұл мақалада PLC жүйелерінің өнеркәсіптік автоматтандыруда қосу, алу, көбейту, бөлу, модуль және дәрежелеу сияқты негізгі математикалық операцияларды қалай орындайтыны түсіндіріледі. Онда осы функция...

FBD PLC бағдарламалауындағы жетілдірілген булев логика: Негізгі логикадан тыс практикалық өнеркәсіптік қолданбалар

Мақалада PLC бағдарламалауында негізгі AND, OR және NOT операцияларынан тыс қолданылатын бірнеше күрделі Булев логика функциялары түсіндіріледі. Онда шындық кестелері, мультиплексорлар, импульс...

PLC бағдарламалаудағы логикалық операторлар: FBD логикалық қақпаларын түсіну

Булев логика әрбір ПЛК бағдарламасының негізі болып табылады. Қарапайым машина басқару жүйелерінен күрделі өнеркәсіптік автоматтандыру жүйелеріне дейін, логикалық қақпалар контроллерлердің өзгеретін...