1 of 1

Siemens 6AV7892-0BC34-1BC0 SIMATIC IPC677C Panel PC

Siemens 6AV7892-0BC34-1BC0 SIMATIC IPC677C Panel PC

Only 6 item(s) left in stock
  • Manufacturer: Siemens

  • Product No.: 6AV7892-0BC34-1BC0

  • Country of origin:Jerman

  • Product Type: Panel PC

  • Barcode: 85371098

  • Payment: T/T, Western Union

  • Weight: 17300g

  • Dimensions: 22.00 x 46.70 x 22.50 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Quantity
View full details

Description

This is a Siemens 6AV7892-0BC34-1BC0 SIMATIC HMI IPC677C, an industrial panel PC designed for human-machine interface (HMI) and control applications. It features a 15-inch touch display with a 1024x768 resolution and is powered by an Intel Celeron P4505 processor. The unit is equipped with 4 GB of DDR3 RAM, a 50 GB SLC solid-state drive for robust data storage, and extensive connectivity including PROFINET, dual Gigabit Ethernet, and multiple USB ports. Integrated monitoring for watchdog, temperature, and fan status ensures operational reliability in demanding industrial environments.

Features

  • 15-inch resistive touch screen display.
  • Intel Celeron P4505 dual-core processor (1.86 GHz).
  • 50 GB Solid-State Drive (SLC) for high-endurance performance.
  • Integrated PROFINET interface (CP 1616-compatible).
  • Onboard RAID controller for data redundancy.
  • Built-in watchdog, temperature, and fan monitoring functions.
  • Front-panel USB port for convenient access.
  • PCI and PCIe (x16) expansion slots for additional hardware.
  • Pre-installed Windows 7 Ultimate 32-bit operating system.

Applications

  • Process visualization and control
  • Machine data acquisition and logging
  • Manufacturing Execution Systems (MES) terminals
  • Factory floor automation control
  • Quality assurance stations

Technical Specifications

Specification Value
Product Type SIMATIC HMI IPC677C (Panel PC)
Processor Intel Celeron P4505 (2 Cores / 2 Threads, 1.86 GHz, 2 MB Cache)
Memory (RAM) 4 GB DDR3 1066 DIMM
Buffered Memory 2 MB Buffered SRAM
Storage 50 GB Solid-State Drive (SATA, SLC)
Optical Drive DVD±R/±RW
Display 15-inch Touch Screen
Resolution 1024 x 768 pixels
Ethernet Interface 2x 10/100/1000 Mbit/s
PROFINET Interface 1x PROFINET (CP 1616-compatible, part of 3x RJ45 total)
Serial Interface 1x COM1
USB Interface 4x USB V2.0 (rear), 1x USB (front)
Expansion Slots 1x PCI, 1x PCIe (x16)
Power Supply 110/230 V AC with NAMUR
Operating System Windows 7 Ultimate 32-bit SP1, MUI (DE, EN, FR, ES, IT)
Product Lifecycle Status Phase-Out
Manufacturer Siemens
Country of Origin Germany (Estimate)
Shipping Weight 17.30 kg
Package Dimensions (Calculated) 22.00 x 46.70 x 22.50 cm

Installation Guidelines

CRITICAL WARNING: Electrical Hazard. Disconnect all power sources and follow Lockout/Tagout (LOTO) procedures before installation or maintenance. Installation must be performed by qualified personnel only. Failure to comply can result in severe injury or equipment damage.
  1. 1
    Panel Cutout and Mounting: Prepare the control cabinet panel cutout according to the device's mechanical drawings. Ensure the mounting surface is clean, flat, and rigid. Insert the Panel PC into the cutout and secure it evenly using all provided mounting clamps to maintain the specified IP rating. Do not overtighten.
  2. 2
    Protective Earth (PE) Connection: Connect the chassis to the main protective earth busbar of the cabinet using a short, low-impedance conductor. This connection is critical for operator safety and electromagnetic compatibility (EMC). Verify the integrity of the ground connection before applying power.
  3. 3
    Power Connection: Connect the 110/230 V AC power supply using the provided power cable. Ensure the source voltage matches the device's rating. Route power cables separately from signal and communication cables to minimize electrical noise interference.
  4. 4
    Interface Wiring: Connect Ethernet, PROFINET, USB, and serial cables as required by the application. Use high-quality, shielded cables for all communication links. Ensure cable shields are properly terminated at one end, typically at the cabinet ground bar, to prevent ground loops. Secure all connectors firmly.
  5. 5
    Initial Power-Up: After verifying all connections, remove LOTO devices and apply power to the Panel PC. Observe the boot sequence to ensure the operating system loads correctly. Proceed with application-specific software configuration and testing.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Jerman

Recently Viewed Products

Technical knowledge

Panduan Mendalam tentang Firewall Industri dan Segmentasi Rangkaian OT

Firewall industri memainkan peranan penting dalam keselamatan siber OT, melindungi rangkaian PLC, DCS, dan SCADA melalui segmentasi, kawalan masuk/keluar, dan integrasi IDS/IPS yang selaras dengan...

Panduan Pengapit Robotik: Dari Pengendalian Halus ke Automasi Tugas Berat

Pengapit robotik moden sedang berkembang melebihi rahang mekanikal tradisional. Daripada sistem pelekat yang diinspirasikan oleh cicak dan pengapit lembut gred makanan hingga alat gudang yang...

Throwback: Bagaimana Motor Elektrik Awal Mengubah Perlombongan Bawah Tanah

Dari pemampat DC yang digerakkan tali ke troli lombong bertenaga bateri, operasi perlombongan awal menandakan titik perubahan dalam elektrifikasi industri. Artikel ini meneroka bagaimana motor...

Factory I/O: Alat Simulasi PLC Moden untuk Latihan Automasi Industri

Factory I/O sedang mengubah pendidikan PLC dengan menyediakan simulasi industri 3D yang mendalam untuk pelajar, jurutera, dan pasukan penyelenggaraan. Platform ini merapatkan jurang antara teori dan...

Pengaturcaraan Kitaran Gerakan Paksi Tunggal pada Pemacu Servo CMZ

Tutorial ini mengkaji bagaimana fungsi PLC terbina dalam pemacu servo CMZ SBD dapat melaksanakan program gerakan berdiri sendiri, termasuk logik homing, kawalan kedudukan, dan pergerakan paksi...

Persediaan Kawalan Gerakan Paksi Tunggal dengan Pemacu Servo CMZ

Tutorial ini meneroka penyediaan sistem gerakan servo paksi tunggal menggunakan pemacu CMZ SBD, merangkumi penyediaan perkakasan, penskalaan paksi, konfigurasi homing, dan pengesahan gerakan selamat...