1 daripada 1

Siemens 6ES7647-6AB25-0CJ0 SIMATIC BOX PC 627 Industrial PC

Siemens 6ES7647-6AB25-0CJ0 SIMATIC BOX PC 627 Industrial PC

Hanya 5 item tinggal dalam stok
  • Pengilang: Siemens

  • No. Produk: 6ES7647-6AB25-0CJ0

  • Negara asal:Jerman

  • Jenis Produk: Industrial PC

  • Kod Bar: 85371091

  • Pembayaran: T/T, Western Union

  • Berat: 7050g

  • Dimensi: 92.0 x 21.0 x 14.0 cm

  • Pelabuhan penghantaran: Xiamen

  • Jaminan: 12 bulan

Kuantiti
Lihat butiran penuh

Description

This product is a Siemens 6ES7647-6AB25-0CJ0, a SIMATIC BOX PC 627 designed for industrial applications. It is equipped with a Celeron M 370 1.5 GHz processor, 512 MB of DDR2 RAM, and an 80 GB SATA hard drive. Connectivity options include dual 10/100 Mbit/s Ethernet, four high-current USB 2.0 ports, a serial port, and an integrated PROFIBUS/MPI interface. The system features onboard AGP graphics, a RAID controller, and monitoring functions for temperature and fan status. This unit is powered by a 24V DC industrial power supply and comes pre-installed with Windows 2000 Professional.

Features

  • Celeron M 370 processor operating at 1.5 GHz with a 400 MHz FSB.
  • 512 MB DDR2 533 SODIMM system memory.
  • Integrated AGP graphics with 8-128 MB of shared memory.
  • 80 GB SATA Hard Disk Drive and a DVD+/-RW optical drive.
  • Dual 10/100 Mbit/s Ethernet RJ45 ports for network connectivity.
  • Built-in PROFIBUS/MPI interface for industrial communication.
  • Onboard RAID controller for data redundancy.
  • System monitoring including watchdog timer, temperature, and fan status.
  • Two available PCI slots for expansion.

Applications

  • Human-Machine Interface (HMI) and SCADA systems.
  • Data acquisition and logging in manufacturing environments.
  • PC-based control and automation tasks.
  • Gateway for industrial network communications.
  • Process visualization and monitoring stations.

Technical Specifications

Specification Value
Product Type SIMATIC BOX PC 627
Processor Celeron M 370, 1.5 GHz, 400 MHz FSB, 1 MB SLC
Memory 512 MB DDR2 533 SODIMM
Graphics AGP Onboard, 8-128 MB Shared Memory
Storage 80 GB HDD SATA, DVD+/-RW
Removable Media 1x Slot for Compact Flash Drive
Expansion Slots 2x PCI (free)
Interfaces 2x 10/100 Mbit/s Ethernet (RJ45), 4x USB V2.0 (High Current), 1x Serial (COM1), 1x PROFIBUS/MPI
Power Supply 24V DC Industrial Power Supply
Operating System Windows 2000 Professional Multi-Language SP4 (EN, GE, FR, IT, SP)
System Monitoring Watchdog, Temperature/Fan Monitoring
PLM Product Phase Obsolete
Manufacturer Siemens
Country of Origin Germany (Estimate)
Shipping Weight 7.05 kg
Package Dimensions (Calculated) 92.0 x 21.0 x 14.0 cm

Installation Guidelines

CRITICAL WARNING: Hazardous voltages may be present. Installation must be performed by qualified personnel only. Failure to de-energize equipment before installation can result in severe injury or death. Always adhere to local Lockout-Tagout (LOTO) procedures.
  1. 1
    De-energize Equipment: Before installation, completely de-energize the control cabinet and verify the absence of voltage using a calibrated multimeter. Follow all site-specific LOTO safety procedures.
  2. 2
    Mount the Chassis: Securely mount the BOX PC chassis to the designated panel or mounting surface. Ensure adequate clearance around the unit for proper ventilation and heat dissipation.
  3. 3
    Connect System Ground: Connect a dedicated protective earth (PE) conductor to the chassis ground terminal. A low-impedance ground connection is critical for safety and noise immunity.
  4. 4
    Connect Power Supply: Connect the 24V DC power source to the designated power input terminals. Verify correct polarity (+/-) before applying power to prevent damage to the unit.
  5. 5
    Terminate I/O and Network Cables: Connect all required communication cables, such as Ethernet, PROFIBUS, USB, and serial devices. Ensure all connectors are fully seated and secured.
  6. 6
    System Power-Up: After verifying all connections, remove the LOTO device and re-energize the cabinet. Power on the BOX PC and verify correct boot-up and system operation.

Penghantaran Ekspres Global

  • Penghantaran Standard: 4-6 Hari Perniagaan melalui DHL, FedEx, dan UPS.
  • Penghantaran Ekspres: Penghantaran pada hari yang sama untuk pesanan dalam stok yang dibuat sebelum 2:00 PM (GMT+8).
  • Liputan Seluruh Dunia: Berkhidmat di lebih 150 negara, termasuk penghantaran pantas ke Arab Saudi dan UAE.

Pemulangan & Jaminan

  • Jaminan 30 Hari: Pemulangan diterima untuk produk dalam stok dalam pembungkusan asal yang disegel kilang.
  • Jaminan 12 Bulan: Setiap komponen industri disokong oleh jaminan teknikal profesional kami.

Pesanan diproses dan dihantar Isnin-Jumaat (tidak termasuk cuti umum).


Untuk kelayakan penuh, yuran penyimpanan semula, dan butiran pemulangan antarabangsa, sila lihat rasmi kami Polisi Pemulangan & Bayaran Balik .

TECHNICAL SPECIFICATIONS

Country of origin
Jerman

Produk yang Baru Dilihat

Pengetahuan teknikal

Logik Boolean dalam Pengaturcaraan PLC: Memahami Pintu Logik FBD

Logik Boolean adalah asas bagi setiap program PLC. Dari kawalan mesin yang mudah hingga sistem automasi industri yang kompleks, pintu logik menentukan bagaimana pengawal bertindak balas terhadap...

Panduan Mendalam tentang Firewall Industri dan Segmentasi Rangkaian OT

Firewall industri memainkan peranan penting dalam keselamatan siber OT, melindungi rangkaian PLC, DCS, dan SCADA melalui segmentasi, kawalan masuk/keluar, dan integrasi IDS/IPS yang selaras dengan...

Panduan Pengapit Robotik: Dari Pengendalian Halus ke Automasi Tugas Berat

Pengapit robotik moden sedang berkembang melebihi rahang mekanikal tradisional. Daripada sistem pelekat yang diinspirasikan oleh cicak dan pengapit lembut gred makanan hingga alat gudang yang...

Throwback: Bagaimana Motor Elektrik Awal Mengubah Perlombongan Bawah Tanah

Dari pemampat DC yang digerakkan tali ke troli lombong bertenaga bateri, operasi perlombongan awal menandakan titik perubahan dalam elektrifikasi industri. Artikel ini meneroka bagaimana motor...

Factory I/O: Alat Simulasi PLC Moden untuk Latihan Automasi Industri

Factory I/O sedang mengubah pendidikan PLC dengan menyediakan simulasi industri 3D yang mendalam untuk pelajar, jurutera, dan pasukan penyelenggaraan. Platform ini merapatkan jurang antara teori dan...

Pengaturcaraan Kitaran Gerakan Paksi Tunggal pada Pemacu Servo CMZ

Tutorial ini mengkaji bagaimana fungsi PLC terbina dalam pemacu servo CMZ SBD dapat melaksanakan program gerakan berdiri sendiri, termasuk logik homing, kawalan kedudukan, dan pergerakan paksi...