General Electric

GE IS215WETAH1A Mark VIe Wind Top Box A Module Board

SKU IS215WETAH1A

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: General Electric

  • Product No.: IS215WETAH1A

  • Country of origin:United States

  • Product Type: Top Box A Module Board

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 600g

  • Dimensions: 28.5cm x 22.6cm x 9.5cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The IS215WETAH1A functions as a dedicated Top Box A Module Board designed for integration within the Mark VIe Wind turbine control system architecture. This circuit board assembly is primarily located within the turbine's upper drive assembly loop, providing essential local monitoring and control node synchronization. The hardware configuration features a special assembly version that incorporates a SCOM grounding output terminal structure, engineered to manage auxiliary voltage dissipation and electrical isolation. To ensure operational survivability in harsh wind engine environments, the entire surface area of the printed circuit board is sealed with an exhaustive, chemically applied conformal coating that completely envelopes all onboard hardware sub-components.

Features

  • Specialized assembly design containing a integrated SCOM grounding terminal for voltage stabilization.
  • Factory-applied conformal coating covering all components to prevent moisture and particulate degradation.
  • Designed as a conversational shorthand variant under the WETA functional acronym.
  • Part of the Group 1 classification within the Mark VIe Wind control series.

Applications

  • Wind turbine main nacelle Top Box drive control networks.
  • Localized rotor or pitch control loop automation.
  • Multi-megawatt wind engine electrical distribution monitoring.

Technical Specifications

Parameter Specification
Manufacturer GE Energy (General Electric)
Model IS215WETAH1A
Product Type Top Box A Module Board
Product Series Mark VIe Wind
Functional Acronym WETA
PCB Coating Type Conformal Coating
Functional Revision A
Series Grouping Group 1
Manufacturing Location Salem, Virginia, USA

Connections/Interfaces

Connector Pin Function
SCOM Grounding Output Terminal for Voltage Storage and Isolation

Installation Guidelines

  • Electrostatic Grounding: Technicians must utilize a verified electrostatic discharge (ESD) wrist strap properly bonded to cabinet ground prior to unpacking or adjusting the board.
  • Grounding Connection: Ensure the SCOM grounding output terminal is securely integrated into the main chassis grounding bus to provide continuous over-voltage protection.
  • Environmental Sealing: Verify the completeness of the conformal coating layer along board edges before mounting inside the Top Box enclosure to prevent condensation short-circuits.
  • Cabinet Mounting: Secure the board assembly within its designated slot inside the wind turbine drive housing using correct torque specifications to prevent vibration detachment.

FAQ

What is the primary function of the SCOM terminal on this board assembly?

The SCOM grounding output terminal provides a dedicated path for voltage storage and circuit grounding protection within the drive assembly.

What environmental protection method is applied to this module?

The board features a thin, chemically-applied conformal coating that completely covers every surface of the hardware elements to protect against environmental contaminants.

What does the conversational shorthand acronym WETA represent?

WETA is the official functional acronym designated by the manufacturer to denote the Top Box A Module Board configuration.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 3
Only 8 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Green
Country of origin
United States

Technical knowledge

Derivative Action in PID Control Without Noise Problems

Learn what derivative action contributes to a PID loop, why it can amplify measurement noise and setpoint changes, and how filtering, sampling, and staged tests make D tuning safer.

Designing Industrial Networks That Stay Troubleshootable

A practical guide to segmenting, documenting, and testing industrial Ethernet networks so plant teams can isolate faults quickly, control change, and expand without creating fragile dependencies.

Commissioning IO-Link From Master Ports to IODD Data

Commission IO-Link systematically from master addressing and port modes through IODD selection, PLC byte mapping, parameter backups, device validation, and failure-injection tests.

PowerFlex Dynamic Braking Resistor Design and Testing

A practical PowerFlex braking guide covering regenerative energy, resistor resistance and duty cycle, thermal protection, model-specific parameters, and measured commissioning tests.

Engineering Industrial Joystick Controls for Safe Motion

An industrial joystick is only the first element in a safe motion command chain. This guide covers sensing choices, wiring, signal validation, PLC logic, restart behavior, and commissioning for...

Seeing PID Behavior Before Tuning the Loop

PID tuning becomes safer when engineers can see how proportional, integral, and derivative actions reshape error, output, and response over time. This guide turns live trends into a disciplined...