Honeywell

Honeywell CC-TFB811 51306751-175 Experion PKS Series C Fieldbus Interface Module IOTA Redundant 8 Links Coated

SKU CC-TFB811 51306751-175

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Honeywell
  • Product No.: CC-TFB811 51306751-175
  • Origin United States
  • Product Type: Fieldbus Interface Module
  • Barcode: 8537101190
  • Payment: T/T, Western Union
  • Weight: 0.4 kg
  • Dimensions: 315 x 135 x 45 mm
  • Shipping port: Xiamen
  • Warranty: 12 months

Tags

Quantity

Product Description

Description

The Honeywell CC-TFB811 51306751-175 is a redundant Fieldbus Interface Module Input/Output Termination Assembly (FIM8 IOTA) designed for the Honeywell Experion PKS Series C process control system platform. It serves as the physical mounting and signal termination base for Series C Fieldbus Interface Modules (FIM8), providing power distribution, Fault Tolerant Ethernet (FTE) network connections, and direct field wiring landings for up to 8 FOUNDATION Fieldbus H1 links.

As a conformal-coated 12-inch IOTA carrier board, the CC-TFB811 (Part Number 51306751-175) supports both redundant and non-redundant hardware topologies. In redundant applications, two FIM8 modules mount onto the upper and lower module positions on the assembly. In non-redundant setups, a single FIM8 module is installed in the upper module slot while the lower slot remains unpopulated. The assembly routes FTE A and FTE B network signals via Control Firewall (CF9) connections directly to the installed interface modules.

Built for harsh industrial automation environments, the conformal coating protects onboard electrical components against environmental contaminants, moisture, and corrosive atmospheric conditions. The module platform supports removal and insertion under power (RIUP), enabling module servicing without disrupting field device communication or process control operations.

Features

  • 8-Link H1 Fieldbus Termination: Accommodates field wiring termination for up to 8 FOUNDATION Fieldbus H1 communications links per assembly.
  • Dual Topology Compatibility: Operates in redundant mode with upper and lower FIM8 module slots, or in non-redundant mode using the upper module position.
  • Conformal Coated Protection: Features factory conformal coating to withstand harsh industrial and atmospheric conditions.
  • Fault Tolerant Ethernet Integration: Provides dual FTE network interface connectors (FTE A and FTE B) for high-availability Control Firewall (CF9) system interconnections.
  • Live Insertion & Removal (RIUP): Supports insertion and removal of Series C FIM modules under power for seamless online maintenance.
  • Integrated Power Conditioning Support: Designed with dedicated connection headers for optional redundant power conditioner IOTA assemblies (J17 and J18).

Applications

  • Experion PKS Series C Architecture: Interfaces FOUNDATION Fieldbus H1 networks directly into the Honeywell C300/FIM control infrastructure.
  • Process Instrumentation Networks: Provides signal routing and power distribution landings for field transmitters, control valves, and fieldbus positioners across 8 H1 links.
  • High-Availability Fieldbus Systems: Serves as the base for redundant FIM8 controller configurations in mission-critical process plants.

Technical Specifications

General

Parameter Specification
Manufacturer Honeywell
Model Number CC-TFB811
OEM Part Number 51306751-175
Product Type Fieldbus Interface Module IOTA (FIM8 Redundant IOTA)
System Compatibility Honeywell Experion PKS Series C
Conformal Coating Yes (Coated)
Capacity 8 H1 Fieldbus Links

Mechanical & Installation

Parameter Specification
IOTA Board Length 12 inches (304.8 mm)
Physical Mounting Carrier Channel Assembly (CCA) mounting in cabinet
Grounding Wire Requirement #8 AWG solid copper wire to protective earth enclosure ground
Module Slots 2 Slots (Upper and Lower for Redundant FIM8)

Fieldbus & Electrical Ratings

Parameter Specification
H1 Link Power/Current (Non-IS) Up to 350 mA for up to 16 non-intrinsically safe mounted devices per H1 link
H1 Link Power/Current (IS) Up to 83 mA for up to 3 intrinsically safe (IS) mounted devices per H1 link
Field Wiring Terminals Molded plug connectors (J2 through J5, J13 through J16)
Power Conditioning Headers J17 (FFLINK 1-4) and J18 (FFLINK 5-8)

Connections / Interfaces

Interface / Connector Function / Wiring Mapping
J8 / J10 FTE A Connector RJ45 connector for yellow FTE cable from Control Firewall (CF9) (J8 Upper / J10 Lower)
J7 / J9 FTE B Connector RJ45 connector for green FTE cable from Control Firewall (CF9) (J7 Upper / J9 Lower)
Terminal J2 (1, 2) FFLINK 1 Fieldbus H1 cable (+ lead to J2-1, - lead to J2-2)
Terminal J3 (1, 2) FFLINK 2 Fieldbus H1 cable (+ lead to J3-1, - lead to J3-2)
Terminal J4 (1, 2) FFLINK 3 Fieldbus H1 cable (+ lead to J4-1, - lead to J4-2)
Terminal J5 (1, 2) FFLINK 4 Fieldbus H1 cable (+ lead to J5-1, - lead to J5-2)
Terminal J13 (1, 2) FFLINK 5 Fieldbus H1 cable (+ lead to J13-1, - lead to J13-2)
Terminal J14 (1, 2) FFLINK 6 Fieldbus H1 cable (+ lead to J14-1, - lead to J14-2)
Terminal J15 (1, 2) FFLINK 7 Fieldbus H1 cable (+ lead to J15-1, - lead to J15-2)
Terminal J16 (1, 2) FFLINK 8 Fieldbus H1 cable (+ lead to J16-1, - lead to J16-2)
Terminal J17 & J18 Interconnects to optional redundant power conditioner IOTA (J17 for Links 1-4, J18 for Links 5-8)

Installation Guidelines

  1. Pre-Installation Checks: Verify the Carrier Channel Assembly (CCA) is properly mounted in the cabinet, Series C power supply is installed, and Control Firewalls (CF9s) are operational.
  2. Mounting Orientation: Align mounting holes of the IOTA with the screw locations on the CCA. Ensure the component side of the board faces upward.
  3. Hardware Alignment: Insert supplied spacers and washers between the bottom of the IOTA board and the top of the CCA. When securing a redundant IOTA, install mounting screws on one side first, then install screws on the opposite side.
  4. Screw Tightening Caution: Do not fully tighten the IOTA mounting screws before installing and tightening the screws in the 24V+ and COM terminals to keep the power screws from binding during installation.
  5. Protective Grounding: Ensure the enclosure connects to protective earth ground using #8 AWG solid copper wire, making solid contact between the grounding bus bar, enclosure, and carrier.
  6. Network Connections: Connect the yellow FTE cable from Control Firewall (CF9) to the FTE A connector and the green FTE cable to the FTE B connector.
  7. Fieldbus Wiring: Connect positive (+) leads to terminal pin 1 and negative (-) leads to terminal pin 2 for each FFLINK connector (J2–J5 and J13–J16) observing strict polarity. Connect all cable shields to the cabinet field wiring shield landing bus bar.

Commissioning and Replacement

Commissioning Recommendations

  1. FTE Cabling Verification: Verify color-coded network cables match connector assignments (Yellow to FTE A, Green to FTE B) for both upper and lower module positions.
  2. Shield Grounding Check: Ensure all Fieldbus H1 cable shields are landed cleanly on the cabinet shield bus bar rather than floating.
  3. Power Conditioner Integration: If using external power conditioning IOTAs, verify interconnection cables are secured to J17 and J18 prior to powering up field links.

Replacement Considerations

  1. Online FIM Module Swap: The Series C FIM8 module supports removal and insertion under power (RIUP) on the IOTA carrier. Maintain standard safety procedures when servicing powered equipment.
  2. Non-Redundant Module Slot: When replacing or configuring a single non-redundant FIM8 module, always ensure the module is inserted into the upper slot; the lower slot remains unused.
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
FAQ
What is the primary function of the Honeywell CC-TFB811 51306751-175 IOTA?
The CC-TFB811 (51306751-175) is a redundant Fieldbus Interface Module Input/Output Termination Assembly (FIM8 IOTA) for Honeywell Experion PKS Series C systems. It terminates up to 8 FOUNDATION Fieldbus H1 links, distributes power, and provides FTE network connectivity to FIM8 modules.
Can the CC-TFB811 IOTA be used in non-redundant system configurations?
Yes. The CC-TFB811 supports both redundant and non-redundant configurations. In non-redundant applications, the single FIM8 module must be installed in the upper module slot, leaving the lower slot unpopulated.
What is the correct cable color convention for FTE network connections on the CC-TFB811?
Yellow FTE cables from the Control Firewall (CF9) connect to the FTE A connectors (J8 for upper slot, J10 for lower slot), and green FTE cables connect to the FTE B connectors (J7 for upper slot, J9 for lower slot).
What grounding precautions are required during CC-TFB811 installation?
The cabinet enclosure must be connected to protective earth ground using #8 AWG solid copper wire, maintaining solid electrical contact between the grounding bus bar, cabinet enclosure, and carrier assembly.
Reviews

CC-TFB811 51306751-175

Stock & lead time on request

Call
1 of 5

Honeywell CC-TFB811 51306751-175 Experion PKS Series C Fieldbus Interface Module IOTA Redundant 8 Links Coated

Only 2 item(s) left in stock
  • Manufacturer: Honeywell

  • Product No.: CC-TFB811 51306751-175

  • Country of origin:United States

  • Product Type: Fieldbus Interface Module

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 400g

  • Dimensions: 315 x 135 x 45 mm

  • Shipping port: Xiamen

  • Warranty: 12 months

Quantity
View full details

Description

The Honeywell CC-TFB811 51306751-175 is a redundant Fieldbus Interface Module Input/Output Termination Assembly (FIM8 IOTA) designed for the Honeywell Experion PKS Series C process control system platform. It serves as the physical mounting and signal termination base for Series C Fieldbus Interface Modules (FIM8), providing power distribution, Fault Tolerant Ethernet (FTE) network connections, and direct field wiring landings for up to 8 FOUNDATION Fieldbus H1 links.

As a conformal-coated 12-inch IOTA carrier board, the CC-TFB811 (Part Number 51306751-175) supports both redundant and non-redundant hardware topologies. In redundant applications, two FIM8 modules mount onto the upper and lower module positions on the assembly. In non-redundant setups, a single FIM8 module is installed in the upper module slot while the lower slot remains unpopulated. The assembly routes FTE A and FTE B network signals via Control Firewall (CF9) connections directly to the installed interface modules.

Built for harsh industrial automation environments, the conformal coating protects onboard electrical components against environmental contaminants, moisture, and corrosive atmospheric conditions. The module platform supports removal and insertion under power (RIUP), enabling module servicing without disrupting field device communication or process control operations.

Features

  • 8-Link H1 Fieldbus Termination: Accommodates field wiring termination for up to 8 FOUNDATION Fieldbus H1 communications links per assembly.
  • Dual Topology Compatibility: Operates in redundant mode with upper and lower FIM8 module slots, or in non-redundant mode using the upper module position.
  • Conformal Coated Protection: Features factory conformal coating to withstand harsh industrial and atmospheric conditions.
  • Fault Tolerant Ethernet Integration: Provides dual FTE network interface connectors (FTE A and FTE B) for high-availability Control Firewall (CF9) system interconnections.
  • Live Insertion & Removal (RIUP): Supports insertion and removal of Series C FIM modules under power for seamless online maintenance.
  • Integrated Power Conditioning Support: Designed with dedicated connection headers for optional redundant power conditioner IOTA assemblies (J17 and J18).

Applications

  • Experion PKS Series C Architecture: Interfaces FOUNDATION Fieldbus H1 networks directly into the Honeywell C300/FIM control infrastructure.
  • Process Instrumentation Networks: Provides signal routing and power distribution landings for field transmitters, control valves, and fieldbus positioners across 8 H1 links.
  • High-Availability Fieldbus Systems: Serves as the base for redundant FIM8 controller configurations in mission-critical process plants.

Technical Specifications

General

Parameter Specification
Manufacturer Honeywell
Model Number CC-TFB811
OEM Part Number 51306751-175
Product Type Fieldbus Interface Module IOTA (FIM8 Redundant IOTA)
System Compatibility Honeywell Experion PKS Series C
Conformal Coating Yes (Coated)
Capacity 8 H1 Fieldbus Links

Mechanical & Installation

Parameter Specification
IOTA Board Length 12 inches (304.8 mm)
Physical Mounting Carrier Channel Assembly (CCA) mounting in cabinet
Grounding Wire Requirement #8 AWG solid copper wire to protective earth enclosure ground
Module Slots 2 Slots (Upper and Lower for Redundant FIM8)

Fieldbus & Electrical Ratings

Parameter Specification
H1 Link Power/Current (Non-IS) Up to 350 mA for up to 16 non-intrinsically safe mounted devices per H1 link
H1 Link Power/Current (IS) Up to 83 mA for up to 3 intrinsically safe (IS) mounted devices per H1 link
Field Wiring Terminals Molded plug connectors (J2 through J5, J13 through J16)
Power Conditioning Headers J17 (FFLINK 1-4) and J18 (FFLINK 5-8)

Connections / Interfaces

Interface / Connector Function / Wiring Mapping
J8 / J10 FTE A Connector RJ45 connector for yellow FTE cable from Control Firewall (CF9) (J8 Upper / J10 Lower)
J7 / J9 FTE B Connector RJ45 connector for green FTE cable from Control Firewall (CF9) (J7 Upper / J9 Lower)
Terminal J2 (1, 2) FFLINK 1 Fieldbus H1 cable (+ lead to J2-1, - lead to J2-2)
Terminal J3 (1, 2) FFLINK 2 Fieldbus H1 cable (+ lead to J3-1, - lead to J3-2)
Terminal J4 (1, 2) FFLINK 3 Fieldbus H1 cable (+ lead to J4-1, - lead to J4-2)
Terminal J5 (1, 2) FFLINK 4 Fieldbus H1 cable (+ lead to J5-1, - lead to J5-2)
Terminal J13 (1, 2) FFLINK 5 Fieldbus H1 cable (+ lead to J13-1, - lead to J13-2)
Terminal J14 (1, 2) FFLINK 6 Fieldbus H1 cable (+ lead to J14-1, - lead to J14-2)
Terminal J15 (1, 2) FFLINK 7 Fieldbus H1 cable (+ lead to J15-1, - lead to J15-2)
Terminal J16 (1, 2) FFLINK 8 Fieldbus H1 cable (+ lead to J16-1, - lead to J16-2)
Terminal J17 & J18 Interconnects to optional redundant power conditioner IOTA (J17 for Links 1-4, J18 for Links 5-8)

Installation Guidelines

  1. Pre-Installation Checks: Verify the Carrier Channel Assembly (CCA) is properly mounted in the cabinet, Series C power supply is installed, and Control Firewalls (CF9s) are operational.
  2. Mounting Orientation: Align mounting holes of the IOTA with the screw locations on the CCA. Ensure the component side of the board faces upward.
  3. Hardware Alignment: Insert supplied spacers and washers between the bottom of the IOTA board and the top of the CCA. When securing a redundant IOTA, install mounting screws on one side first, then install screws on the opposite side.
  4. Screw Tightening Caution: Do not fully tighten the IOTA mounting screws before installing and tightening the screws in the 24V+ and COM terminals to keep the power screws from binding during installation.
  5. Protective Grounding: Ensure the enclosure connects to protective earth ground using #8 AWG solid copper wire, making solid contact between the grounding bus bar, enclosure, and carrier.
  6. Network Connections: Connect the yellow FTE cable from Control Firewall (CF9) to the FTE A connector and the green FTE cable to the FTE B connector.
  7. Fieldbus Wiring: Connect positive (+) leads to terminal pin 1 and negative (-) leads to terminal pin 2 for each FFLINK connector (J2–J5 and J13–J16) observing strict polarity. Connect all cable shields to the cabinet field wiring shield landing bus bar.

Commissioning and Replacement

Commissioning Recommendations

  1. FTE Cabling Verification: Verify color-coded network cables match connector assignments (Yellow to FTE A, Green to FTE B) for both upper and lower module positions.
  2. Shield Grounding Check: Ensure all Fieldbus H1 cable shields are landed cleanly on the cabinet shield bus bar rather than floating.
  3. Power Conditioner Integration: If using external power conditioning IOTAs, verify interconnection cables are secured to J17 and J18 prior to powering up field links.

Replacement Considerations

  1. Online FIM Module Swap: The Series C FIM8 module supports removal and insertion under power (RIUP) on the IOTA carrier. Maintain standard safety procedures when servicing powered equipment.
  2. Non-Redundant Module Slot: When replacing or configuring a single non-redundant FIM8 module, always ensure the module is inserted into the upper slot; the lower slot remains unused.
Loading product navigation…

What is the primary function of the Honeywell CC-TFB811 51306751-175 IOTA?

The CC-TFB811 (51306751-175) is a redundant Fieldbus Interface Module Input/Output Termination Assembly (FIM8 IOTA) for Honeywell Experion PKS Series C systems. It terminates up to 8 FOUNDATION Fieldbus H1 links, distributes power, and provides FTE network connectivity to FIM8 modules.

Can the CC-TFB811 IOTA be used in non-redundant system configurations?

Yes. The CC-TFB811 supports both redundant and non-redundant configurations. In non-redundant applications, the single FIM8 module must be installed in the upper module slot, leaving the lower slot unpopulated.

What is the correct cable color convention for FTE network connections on the CC-TFB811?

Yellow FTE cables from the Control Firewall (CF9) connect to the FTE A connectors (J8 for upper slot, J10 for lower slot), and green FTE cables connect to the FTE B connectors (J7 for upper slot, J9 for lower slot).

What grounding precautions are required during CC-TFB811 installation?

The cabinet enclosure must be connected to protective earth ground using #8 AWG solid copper wire, maintaining solid electrical contact between the grounding bus bar, cabinet enclosure, and carrier assembly.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Silver
Country of origin
United States
Power source
DC Power

Recently Viewed Products

Technical knowledge

Implementing 3-Switch XOR Ladder Logic with Internal Bit

Implement a 3-SPST switch XOR light circuit in LogixPro or RSLogix 500 using an internal relay bit. Includes truth tables, boolean equations, and verified.

Building a Modbus RTU Network with CompactLogix and DeltaV

Integrate Allen-Bradley CompactLogix, Caterpillar ATS, and generators into DeltaV DCS over Modbus RTU. Covers ProSoft MVI69-MCM, Miille DIN266 gateways.

ONS Instruction Not Energizing OTE in Studio 5000 Ladder Logic

ONS instruction fires but the OTE coil never latches in Studio 5000 because the one-shot is only true for one scan. Use OTL/OTU or seal-in logic instead.

Kinetix 5500 EtherNet/IP Network Switch Requirements and Topology

Configure Allen-Bradley Kinetix 5500 servo drives on EtherNet/IP. Covers CIP Sync, IEEE 1588 V2 timing, Stratix selection, DLR topology, and HMI.

Moving Average Filtering in DCS and PLC Analog Control

A moving-average filter is the sliding-window smoother most instrument engineers drop into DCS and PLC analog paths. Here is how the window works, how N and sample time set lag, and when a...

GE Mark VI Function Blocks for Gas Turbine Control Logic

On Frame 5–9 gas turbines, GE Mark VI and Mark VIe run control as function-block application software. This article maps process, protection, and sequencing functions—and what Toolbox ST access...