Mitsubishi Electric

Mitsubishi Electric L26CPU-CM MELSEC L Series CPU Module

SKU L26CPU-CM

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Mitsubishi Electric

  • Product No.: L26CPU-CM

  • Country of origin:United States

  • Product Type: PLC CPU Modules

  • Payment: T/T, Western Union

  • Weight: 3000g

  • Dimensions: 150 mm x 110 mm x 100 mm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

Executing complex sequence logic with nanosecond-level processing efficiency, the Mitsubishi Electric L26CPU-CM serves as a high-density, rack-free controller within the MELSEC L Series platform. This central processing unit eliminates the need for a traditional backplane, utilizing integrated slide-locks for module-to-module mechanical coupling. It comes equipped with a built-in CC-Link master/local station interface, enabling immediate integration of distributed remote I/O points, variable frequency drives, and process sensors directly from the CPU. High-capacity memory reserves of 1040K bytes for programs and 768K bytes of standard RAM support elaborate mathematical operations, logging functionality, and recipe management in space-constrained industrial control panels.

Features

  • Rack-Free Modular Architecture: Direct connection of expansion modules via physical slide-locks reduces cabinet footprint and simplifies hardware scaling.
  • Embedded CC-Link Master/Local: Supports direct deployment of distributed automation networks without consuming separate module slots.
  • Flexible Memory Allocation: Includes 1040K bytes of program memory, 768K bytes of standard RAM, and 2048K bytes of standard ROM.
  • Integrated SD Card Interface: Facilitates firmware updates, data logging, recipe storage, and automated program backups without specialized software.
  • Multi-Protocol Diagnostics: Built-in USB and high-speed communication interfaces facilitate rapid commissioning and debugging.

Applications

  • Packaging and Assembly Machinery: Direct, real-time control over distributed servo systems and sensor arrays.
  • Water and Wastewater Infrastructure: Cost-effective remote station integration via integrated CC-Link connectivity.
  • Material Handling Systems: Flexible routing and conveyor synchronization in high-throughput distribution environments.
  • Automotive Assembly Sub-stations: Highly reliable, compact control layouts inside localized terminal boxes.

Technical Specifications

Manufacturer Mitsubishi Electric
Model Identifier L26CPU-CM
Product Series MELSEC L Series
Program Memory Capacity 1040K bytes (260K steps)
Standard RAM 768K bytes
Standard ROM 2048K bytes
Embedded Interfaces CC-Link (Master/Local), USB, SD Memory Card Slot
File Register Size 384K points
Country of Origin Japan
Shipping Weight (Calculated) 3.0 kg (including protective packaging)
Package Dimensions (Calculated) 150 mm x 110 mm x 100 mm

Empirical Engineering Insights

Alternative Models & Compatibility

The L26CPU-CM provides direct physical integration with all MELSEC L Series expansion hardware. Note that when migrating code from basic modules like the L02CPU, you must adjust the I/O assignment configuration within GX Works2 to account for the integrated CC-Link network address space. This model serves as an excellent replacement for legacy standalone network architectures by merging logic control and network master functions into a single processing node.

Application Pitfalls & Engineering Notes

To maintain proper thermal convection, do not restrict the top and bottom airflow passages of the L26CPU-CM housing. When installed inside unventilated enclosures subject to ambient operating temperatures exceeding 45 degC, maintain at least 50mm clearance above the CPU module. High CPU loading coupled with high-speed CC-Link polling can elevate internal components near thermal trip levels if clearance is obstructed.

Commissioning & Wiring Tips

Always verify that terminating resistors (110 ohm or 130 ohm depending on cable specifications) are physically wired across the DA and DB terminals of the physical end stations on the CC-Link network. Improper termination leads to immediate network frame drops and intermittent communication error flags. Ground the shielded connection of the CC-Link cable to the cabinet's protective earth ground plate at a single terminal point to prevent ground loop noise from corrupting data frames.

Installation Guidelines

CRITICAL WARNING:

De-energize all primary and secondary power distribution lines before executing any installation, module coupling, or wiring procedures. Handling the CPU module or its modular expansions while powered can result in electrical shock, irreversible backplane link driver damage, and erratic PLC control behavior.

1

Mount the CPU module directly onto a clean, grounded DIN rail (DIN type TH35-7.5) or standard rear panel mounting surface.

2

Connect adjacently positioned expansion modules by sliding them along the joint guide slots until the locking levers click firmly into the locked position.

3

Establish system grounding by connecting a dedicated 2 mm square ground wire from the Functional Ground (FG) terminal directly to the enclosure main star ground.

4

Insert a verified SD memory card containing the runtime program, configure CC-Link network terminations, and slowly apply the designated system input voltage.

FAQ

Does the L26CPU-CM require a separate base unit or backplane?

No, the MELSEC L Series features a rack-free architecture. Modules connect directly to each other side-by-side using integrated slide locks, eliminating the need for a physical baseplate.

What is the built-in CC-Link station capability of this CPU?

The L26CPU-CM features a built-in CC-Link interface that can be configured as either a Master Station or a Local Station, allowing direct connection to network nodes without an expansion module.

What software program is used to configure and program the L26CPU-CM?

The module is fully supported and programmed using GX Works2 (part of the iQ Works suite), which manages both the logic code and the integrated CC-Link network parameters.

What battery does this CPU use for memory retention?

It utilizes the Q6BAT battery module to retain standard RAM contents and register values when system control power is switched off.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 10 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
United States

Technical knowledge

Commissioning OPC UA in KEPServerEX: A Field Checklist

A practical commissioning sequence for KEPServerEX OPC UA connections: define data ownership, test tags locally, configure endpoint and certificate trust, limit access, then verify failure recovery...

Set a PLC Commissioning Laptop IP Without Losing Access

Commissioning an Ethernet-connected PLC often starts with the laptop, not the controller. Learn how to record existing settings, choose a temporary address, test connectivity, and restore the plant...

Designing Automation for Combustible Dust Hazards

Combustible dust controls require more than alarms. Learn how to map dust generation, select instrumentation, design interlocks, handle failed feedback, test safe states, and maintain the full...

Hairpin Stators: Benefits, Limits, and Inspection

Hairpin windings raise slot fill and support compact traction motors, but conductor geometry, AC losses, insulation damage, weld quality, and cooling determine whether the design meets its targets.

Using Ansible for Controlled SCADA Server Changes

Use Ansible to standardize SCADA server changes without expanding OT risk. This guide covers inventories, idempotent playbooks, staged testing, credentials, logging, and practical rollback controls.

Securing Remote PLC Access Beyond the VPN

A VPN encrypts the path to an industrial network, but secure remote PLC work also needs identity controls, segmented access, change approval, logging, safe operating boundaries, and tested recovery...