1 of 1

Mitsubishi Electric LJ72GF15-T2-CM MELSEC L Series CC-Link IE Field Head Module

Mitsubishi Electric LJ72GF15-T2-CM MELSEC L Series CC-Link IE Field Head Module

Only 10 item(s) left in stock
  • Manufacturer: Mitsubishi Electric

  • Product No.: LJ72GF15-T2-CM

  • Country of origin:United States

  • Product Type: PLC Network Modules

  • Payment: T/T, Western Union

  • Weight: 2000g

  • Shipping port: Xiamen

  • Warranty: 12 months

Quantity
View full details

Description

Establishing reliable, deterministic remote node connectivity within distributed automation architectures, the Mitsubishi Electric LJ72GF15-T2-CM operates as a high-performance CC-Link IE Field Network Head Module. This intelligent device station links decentralized digital and analog I/O modules directly to a master controller over a high-speed Ethernet backbone. Engineered for the MELSEC L Series platform, it supports complex modular topologies while maintaining rapid response times and extensive diagnostics across the industrial network.

Features

  • High-Speed Transmission: Supports 1 Gbps communication speeds over standard industrial Ethernet media for near-zero latency cyclic data exchange.
  • Extensive Node Capacity: Manages up to 2048 remote I/O points and 1024 words of remote register data per station.
  • Integrated RAS Functions: Features built-in Reliability, Availability, and Serviceability diagnostics to pinpoint network faults instantly.
  • System Completeness: Supplied standard with the required END bus cover to ensure correct backplane termination.
  • Modular Expandability: Allows direct attachment of standard MELSEC L Series digital, analog, and specialty function modules.

Applications

  • Automotive assembly lines requiring high-speed distributed I/O control.
  • Packaging and material handling systems with remote conveyor nodes.
  • Water treatment facilities utilizing scattered instrumentation stations.
  • Multi-zone thermal control processes and remote telemetry panels.

Technical Specifications

Parameter Specification
Manufacturer Mitsubishi Electric
Model Number LJ72GF15-T2-CM
Product Series MELSEC L Series
Station Type CC-Link IE Field Intelligent Device Station
Communication Speed 1 Gbps
Max. Remote I/O Points 2048 points
Max. Remote Register Capacity 1024 words
Internal Current Consumption (5V DC) 1.00 A
RAS Functions Supported (Hardware diagnostics, loopback tests, link status tracking)
Included Accessories END cover termination unit
Net Weight 0.23 kg
Shipping Weight (Calculated) 2.00 kg

Connections and Interfaces

Interface Port Connection & Cable Type Function Description
PORT 1 / PORT 2 RJ45 Connector (Cat5e or higher STP, double-shielded) CC-Link IE Field Network Line connection (supports line, star, and ring topologies)
Station No. Switches Rotary hardware switches (x1, x10) Manual network station address configuration (1 to 120)

Empirical Engineering Insights

Alternative Models & Compatibility

The "-CM" suffix indicates compliance and localized packaging standards, but functionally mirrors the standard LJ72GF15-T2. It is fully cross-compatible with standard MELSEC L Series power supply modules, digital I/O, and analog modules. Ensure your engineering environment is updated with the correct CSP+ profiles in GX Works2 or GX Works3 to correctly discover the device station during network configuration.

Application Pitfalls & Engineering Notes

A common field failure involves network dropouts caused by electromagnetic interference (EMI). Because CC-Link IE Field operates at 1 Gbps, standard unshielded Cat5 cable is highly susceptible to variable frequency drive (VFD) noise. Double-shielded (STP) Category 5e or Category 6 cables with grounded metal RJ45 shells must be used. Additionally, compute the total 5V DC backplane current consumption: if adding high-density modules exceeds the power supply module's capacity, the head module will shut down or experience intermittent communications.

Commissioning & Wiring Tips

The head module will fail to boot and display a hardware bus error if the physical END cover is not securely locked onto the rightmost slot of the overall assembly. Always perform a physical latch-check before powering up. When setting the station number using the rotary dials, make sure to cycle the main system power; the module only reads the rotary switch state during the initial hardware initialization phase.

Installation Guidelines

CRITICAL WARNING: Before installing, removing, or wiring any module in the assembly, ensure the main external power source is completely disconnected on all phases. Failure to do so can result in electrical shock, backplane bus damage, or immediate hardware failure.
1

Mount the head module onto the DIN rail, ensuring the unit's DIN rail hooks are securely engaged and locked.

2

Align the side joint connectors of the adjacent power supply and I/O modules, sliding them together until they click into place, then engage the module joint levers.

3

Affix the supplied END cover onto the rightmost module slot of the completed rack assembly.

4

Set the station number on the front-panel rotary switches using a small precision screwdriver, and connect the double-shielded Ethernet cables to PORT 1 or PORT 2.

Loading product navigation…

What is the function of the included END cover on the LJ72GF15-T2-CM?

The END cover terminates the internal backplane bus of the MELSEC L Series system. Without this cover physically attached to the right side of the module stack, the system will detect an incomplete bus connection and generate a hardware error, halting all operations.

Can I use standard CAT5 UTP patch cables for this CC-Link IE Field module?

It is highly discouraged. Because CC-Link IE Field operates at 1 Gbps, it requires double-shielded (STP) Category 5e or Category 6 industrial Ethernet cabling with grounded metal connectors to prevent packet loss due to electromagnetic noise.

How do I configure the station number on this network head module?

The station number is configured using the two rotary switches on the front of the module. Turn the dials to your desired address (from 1 to 120) before powering up. Power must be cycled for the module to register changes to these switches.

Does this module support both line and ring network topologies?

Yes. The dual RJ45 ports (PORT 1 and PORT 2) support line, star, and redundant ring topologies within the CC-Link IE Field network framework.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
United States

Recently Viewed Products

Technical knowledge

Electric Actuators Designed to Replace Fluid Power Systems: A Practical Industrial Automation Guide

This article explains how integrated electric actuators, such as SMC’s e-Actuator series, are transforming industrial motion control by replacing traditional pneumatic and hydraulic systems. It...

Math Operations Using OpenPLC for Industrial Automation Applications

This article explains how PLC systems perform core mathematical operations such as addition, subtraction, multiplication, division, modulo, and exponentiation within industrial automation. It shows...

Advanced Boolean Logic with FBD PLC Programming: Practical Industrial Applications Beyond Basic Logic

The article explains several advanced Boolean logic functions used in PLC programming beyond basic AND, OR, and NOT operations. It covers how tools like truth tables, multiplexers, pulse generators,...

Boolean Logic in PLC Programming: Understanding FBD Logic Gates

Boolean logic is the foundation of every PLC program. From simple machine controls to complex industrial automation systems, logic gates determine how controllers respond to changing inputs and...

Deep-Dive Guide to Industrial Firewalls and OT Network Segmentation

Industrial firewalls play a critical role in OT cybersecurity, protecting PLC, DCS, and SCADA networks through segmentation, ingress/egress control, and IDS/IPS integration aligned with IEC 62443...

Guide to Robotic Grippers: From Delicate Handling to Heavy-Duty Automation

Modern robotic grippers are evolving beyond traditional mechanical jaws. From gecko-inspired adhesive systems and soft food-grade grippers to AI-powered warehouse tools, advanced gripping...