Description
The Siemens
6AV7882-0BA20-1BA0 is a
SIMATIC IPC277E Nanopanel PC, designed for industrial applications requiring a compact and robust human-machine interface or control platform. This unit features a 9-inch Touch TFT display, an integrated Celeron N2807 processor, 4 GB of RAM, and an 80 GB SSD for reliable data storage. It comes pre-installed with WIN Embedded Standard 7E SP1 (English, 32-bit) and is delivered without SIMATIC software, allowing for flexible integration into various automation environments. Connectivity options include two 10/100/1000 Mbps Ethernet ports, one Display Port for external graphics, multiple USB interfaces (one USB 3.0, two USB 2.0), and one serial (COM 1) port, alongside a CFast slot for additional expansion. The unit operates on a 24 V DC power supply, making it suitable for standard industrial power systems.
Features
- 9-inch Touch TFT Display
- Integrated Celeron N2807 (2C/2T) Processor
- 4 GB RAM
- 80 GB Solid State Drive (SSD)
- Pre-installed WIN Embedded Standard 7E SP1 (English, 32-bit)
- 2x 10/100/1000 Mbps Ethernet RJ45 Ports
- 1x Display Port Graphic Output
- 1x USB 3.0 Port
- 2x USB 2.0 Ports
- 1x Serial (COM 1) Port
- CFast Slot for Expansion
- 24 V DC Power Supply Input
Applications
The Siemens SIMATIC IPC277E Panel PC is suitable for a range of industrial applications, including:
- Machine operation and control
- Human-Machine Interface (HMI) solutions
- Data acquisition and visualization
- Embedded control systems
- Manufacturing automation
- Process monitoring and supervision
Technical Specifications
| Attribute |
Value |
| Brand |
Siemens |
| Manufacturer |
Siemens |
| Range |
Simatic Panel PC |
| Subrange |
IPC |
| Type of product |
Accessories (as per source categorization) |
| PLM Product Phase |
Phase-Out |
| Display |
9" Touch TFT |
| Processor |
Celeron N2807 (2C/2T) |
| RAM |
4 GB |
| Storage |
80 GB SSD |
| Operating System |
WIN Embedded Standard 7E SP1, English; 32 bit (without SIMATIC software) |
| Ethernet Ports |
2x 10/100/1000 Mbps RJ45 |
| Graphics Output |
1x Display Port |
| USB Ports |
1x USB 3.0, 2x USB 2.0 |
| Serial Port |
1x (COM 1) |
| Expansion Slot |
CFast slot |
| Power Supply |
24 V DC |
| Package Dimensions (Calculated) |
23.65 cm (L) x 11.70 cm (W) x 19.05 cm (H) |
| Shipping Weight |
1.95 kg |
| Commodity Code |
85371098 |
| Export Control Regulations (ECCN) |
N |
Connections / Interfaces
| Connector Type |
Quantity |
Function / Details |
| Ethernet RJ45 |
2 |
10/100/1000 Mbps network connection |
| Display Port |
1 |
External graphics output |
| USB 3.0 |
1 |
High-speed peripheral connection |
| USB 2.0 |
2 |
Peripheral connection |
| Serial (COM 1) |
1 |
RS-232/422/485 communication (typical for industrial serial) |
| CFast Slot |
1 |
For CFast memory cards |
| DC Power Input |
1 |
24 V DC power connection |
Installation Guidelines
-
Safety First: Ensure all power to the installation area is de-energized before beginning any work. Verify with appropriate lockout/tagout procedures.
-
Mounting: As a Panel PC, this unit is typically designed for flush mounting into a control cabinet or machine panel. Ensure adequate space for ventilation and cable routing.
-
Power Connection: Connect the 24 V DC power supply to the designated power input terminals. Observe correct polarity to prevent damage. Use appropriately sized and shielded cables.
-
Grounding: Establish a proper protective earth (PE) connection to the chassis of the Panel PC. This is crucial for electrical safety and electromagnetic compatibility (EMC).
-
Network Connections: Connect Ethernet cables to the RJ45 ports for network communication. Use shielded cables in industrial environments to minimize interference.
-
Peripheral Connections: Connect USB devices, serial devices, and the Display Port monitor as required. Ensure cables are routed to avoid strain and interference.
-
CFast Installation: If using a CFast card, insert it into the designated slot, ensuring correct orientation.
-
Environmental Considerations: Install the Panel PC in an environment that complies with its specified operating temperature and humidity ranges. Ensure proper airflow for cooling.
-
Cable Management: Route all cables neatly and securely, separating power cables from signal cables to reduce potential interference.
-
Power On: After all connections are secure and verified, re-energize the power supply to the system.