Siemens

Siemens 6ES5247-4UA41 SIMATIC S5 IP 247 Positioning Module

SKU 6ES5247-4UA41

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6ES5247-4UA41

  • Country of origin:Germany

  • Product Type: Positioning Module

  • Barcode: 85389091

  • Payment: T/T, Western Union

  • Weight: 610g

  • Dimensions: 18.10 x 8.00 x 17.20 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6ES5247-4UA41 is an IP 247 positioning module for the SIMATIC S5 automation platform. This module is specifically engineered for the precise control of stepper motors in industrial applications. A key operational requirement for this unit is the use of forced ventilation to maintain performance and reliability, particularly during intensive production cycles. As part of the legacy SIMATIC S5 series, it provides dependable functionality for automation tasks where accurate and repeatable position control is critical. This module is identified as an obsolete component, making it a crucial spare part for maintaining existing systems.

Features

  • Designed for precise positioning control of stepper motors.
  • Requires forced ventilation for proper operation.
  • Integrates with the Siemens SIMATIC S5 PLC system.
  • Robust construction for industrial environments.
  • Classified as an obsolete product, suitable for legacy system maintenance.

Applications

  • Automated assembly lines
  • Material handling and conveyor systems
  • Packaging machinery
  • Pick-and-place robotics
  • Textile and printing equipment

Technical Specifications

Specification Value
Manufacturer Siemens
Product Family SIMATIC S5
Model Number 6ES5247-4UA41
Module Type IP 247 Positioning Module
Motor Compatibility Stepper Motors
Cooling Requirement Forced Ventilation
Product Lifecycle Status Obsolete
Shipping Weight 0.61 kg
Package Dimensions (Calculated) 18.10 x 8.00 x 17.20 cm
Commodity Code 85389091
ECCN N
Country of Origin Germany (Estimate)

Installation Guidelines

CRITICAL WARNING: Installation, commissioning, and maintenance must be performed by qualified personnel only. Failure to de-energize the system before handling can result in severe electrical shock, injury, or death. Always adhere to local and national safety regulations, including Lockout/Tagout (LOTO) procedures.
  1. 1 De-energize the entire SIMATIC S5 rack and associated machinery. Apply Lockout/Tagout (LOTO) devices as per established safety protocols.
  2. 2 Use a calibrated multimeter to verify a zero-energy state at the power supply terminals and backplane before proceeding.
  3. 3 Carefully align the module with the backplane connector in an available slot and press firmly until it is securely seated in the S5 rack.
  4. 4 Secure the module to the rack using its integrated fastening screws. Do not overtighten.
  5. 5 Connect the stepper motor and any associated I/O wiring to the front panel terminals. Ensure proper cable shielding and grounding practices are followed.
  6. 6 Verify that the enclosure's forced ventilation system is operational and that airflow to the module is unobstructed.
  7. 7 After clearing all personnel and tools, remove LOTO devices and re-energize the system for commissioning and testing.

FAQ

What is the primary function of the 6ES5247-4UA41 module?

It is a positioning module from the Siemens SIMATIC S5 series, designed for the precise control of stepper motors in industrial automation systems.

Does this module have any special cooling requirements?

Yes, the module is specified for operation in systems equipped with forced ventilation to ensure performance and reliability.

Is the 6ES5247-4UA41 a current Siemens product?

No, this module is part of the obsolete SIMATIC S5 product line. Its availability is typically limited to surplus and refurbished stock for maintaining legacy systems.

Which automation family does this module belong to?

This module is part of the Siemens SIMATIC S5 family of programmable logic controllers and accessories.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 4 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Seal-In Logic or OTL/OTU? Choosing PLC Memory Safely

Seal-in circuits and OTL/OTU instructions can hold the same command, but they fail differently. This guide compares scan behavior, restart risk, troubleshooting, permissives, and safer PLC design...

Commissioning a Micro800 PLC in FactoryTalk Design Workbench

A practical Micro800 commissioning workflow covering hardware checks, USB and Ethernet discovery, safe ladder testing, download risks, fault isolation, and project recovery in FactoryTalk Design...

Derivative Action in PID Control Without Noise Problems

Learn what derivative action contributes to a PID loop, why it can amplify measurement noise and setpoint changes, and how filtering, sampling, and staged tests make D tuning safer.

Designing Industrial Networks That Stay Troubleshootable

A practical guide to segmenting, documenting, and testing industrial Ethernet networks so plant teams can isolate faults quickly, control change, and expand without creating fragile dependencies.

Commissioning IO-Link From Master Ports to IODD Data

Commission IO-Link systematically from master addressing and port modes through IODD selection, PLC byte mapping, parameter backups, device validation, and failure-injection tests.

PowerFlex Dynamic Braking Resistor Design and Testing

A practical PowerFlex braking guide covering regenerative energy, resistor resistance and duty cycle, thermal protection, model-specific parameters, and measured commissioning tests.