Description
The Siemens 6ES7647-6AB25-0HK0 is a SIMATIC Box PC 627 designed for robust industrial computing applications. This Box PC features onboard AGP Graphics with 8-128 MB shared memory, dual 10/100 Mbit/s Ethernet RJ45 ports, four USB V2.0 (High Current) ports, and one serial (COM1) interface. It includes an onboard RAID controller, a slot for a Compact Flash drive, and integrated Watchdog, Temperature, and Fan Monitoring functions. The system is powered by a Celeron M 370 1.5 GHz processor with a 400 MHz FSB and 1 MB SLC, and comes with 512 MB DDR2 533 SODIMM RAM. Communication capabilities include PROFIBUS/MPI. For storage, it features RAID1 with two 60 GB SATA (2.5") drives and a DVD ROM. The unit operates on a DC 24V industrial power supply and is pre-installed with Windows XP Professional Multi-Language SP2. It also provides two free PCI slots for expansion.
Features
- AGP Graphics Onboard with 8-128 MB Shared Memory
- 2 x 10/100 Mbit/s Ethernet RJ45 Ports
- 4 x USB V2.0 (High Current) Ports
- 1 x Serial (COM1) Port
- Onboard RAID Controller
- 1 x Slot for Compact Flash Drive
- Watchdog, Temperature, and Fan Monitoring
- 2 x Free PCI Slots
- Celeron M 370 1.5 GHz CPU, 400 MHz FSB, 1 MB SLC
- PROFIBUS/MPI Interface
- 512 MB DDR2 533 SODIMM RAM
- DC 24V Industrial Power Supply
- RAID1 with 2x60 GB SATA (2.5") Storage + DVD ROM
- Pre-installed Windows XP Professional Multi-Language SP2 (EN, GE, FR, IT, SP)
Applications
The Siemens SIMATIC Box PC 627 is suitable for a wide range of industrial automation tasks, including:
- Machine control and visualization
- Data acquisition and processing
- Human-Machine Interface (HMI) applications
- Industrial communication gateways
- Distributed control systems
- Manufacturing execution systems (MES) integration
Technical Specifications
| Brand |
Siemens |
| Manufacturer |
Siemens |
| Range |
Simatic Box PC |
| Subrange |
PC627 |
| Product Type |
Box PC |
| PLM Product Phase |
Obsolete |
| CPU |
Celeron M 370 1.5 GHz, 400 MHz FSB, 1 MB SLC |
| RAM |
512 MB DDR2 533 SODIMM |
| Graphics |
AGP Graphics Onboard, 8-128 MB Shared Memory |
| Ethernet |
2 x 10/100 Mbit/s RJ45 |
| USB Ports |
4 x USB V2.0 (High Current) |
| Serial Ports |
1 x Serial (COM1) |
| Storage |
RAID1 / 2x60 GB SATA (2.5") + DVD ROM |
| Compact Flash |
1 x Slot for Compact Flash Drive |
| Expansion Slots |
2 x PCI Free |
| Communication Interface |
PROFIBUS/MPI |
| Operating System |
Windows XP Professional Multi-Language SP2 (EN, GE, FR, IT, SP) |
| Power Supply |
DC 24V Industrial Power Supply |
| Monitoring |
Watchdog, Temperature, Fan Monitoring |
| Package Dimensions (Calculated) |
45.00 x 47.50 x 27.00 cm |
| Shipping Weight |
7.05 kg |
| Commodity Code |
85371091 |
| Export Control Regulations (ECCN) |
N |
Connections / Interfaces
- Ethernet: 2 x RJ45 (10/100 Mbit/s)
- USB: 4 x USB V2.0 (High Current)
- Serial: 1 x COM1
- Fieldbus: PROFIBUS/MPI
- Power: DC 24V Terminal
Installation Guidelines
-
De-energize System: Ensure all power to the system and associated equipment is disconnected before installation.
-
Mounting: Securely mount the Box PC in a suitable industrial enclosure or control cabinet, ensuring adequate ventilation and clearance for cable routing.
-
Power Connection: Connect the DC 24V industrial power supply to the designated terminals, observing correct polarity.
-
Grounding: Establish a proper protective earth (PE) connection to the chassis of the Box PC to ensure electrical safety and minimize electromagnetic interference.
-
Ethernet Connections: Connect RJ45 cables for network communication to the 10/100 Mbit/s Ethernet ports.
-
USB and Serial Connections: Connect USB devices and serial peripherals to the respective USB V2.0 and COM1 ports as required.
-
PROFIBUS/MPI Connection: If utilizing PROFIBUS/MPI, connect the appropriate cable to the designated interface.
-
Cooling: Ensure the operating environment maintains specified temperature limits and that the integrated fan monitoring system can function effectively.
-
Cable Management: Route all cables neatly and securely, separating power and signal cables to prevent interference.
-
Re-energize System: After all connections are verified, re-apply power to the system and verify proper operation.