Description
The
6ES7647-6BD36-1FB0 is a Siemens
SIMATIC Box PC 627B, designed for industrial applications requiring a robust computing platform. This PC box features onboard graphics with 128 MB shared memory, supporting various display requirements. It is equipped with a Core 2 Duo T5500 processor (1.66 GHz, 2 MB L2 cache, 667 MHz FSB) and 2 GB DDR2 667 SODIMM RAM for reliable performance. Connectivity options include two 10/100/1000 Mbit/s Ethernet RJ45 ports, four USB V2.0 ports (high current), and one serial (COM1) port. Storage is managed by an onboard RAID controller, supporting two 250 GB SATA (2.5") drives, and includes a DVD +/-RW optical drive. The unit also features a front-side CompactFlash Drive slot (without CF card), a watchdog timer, and integrated temperature/fan monitoring. It operates on a 24 V DC industrial power supply and comes with Windows XP Professional Multi-language SP2 pre-installed.
Features
- Integrated graphics with 128 MB shared memory
- Core 2 Duo T5500 processor (1.66 GHz, 2 MB L2, 667 MHz FSB)
- 2 GB DDR2 667 SODIMM RAM
- Dual 10/100/1000 Mbit/s Ethernet RJ45 ports
- Four USB V2.0 ports (high current)
- One serial (COM1) interface
- Onboard RAID controller
- Two 250 GB SATA (2.5") hard drives
- DVD +/-RW optical drive
- Front-side CompactFlash Drive slot (without CF)
- Watchdog and temperature/fan monitoring
- 1x PCI and 1x PCIE (X4) expansion slots
- 24 V DC industrial power supply
- Pre-installed Windows XP Professional Multi-language SP2
Applications
The Siemens SIMATIC Box PC 627B is suitable for a range of industrial automation tasks, including:
- Machine control and visualization (HMI)
- Data acquisition and processing
- Industrial communication gateways
- Distributed control systems
- Manufacturing execution systems (MES)
- General industrial computing environments requiring a rugged PC
Technical Specifications
| Attribute |
Value |
| Manufacturer |
Siemens |
| Series |
SIMATIC Box PC |
| Subrange |
PC627B |
| Product Type |
PC Box |
| PLM Product Phase |
Obsolete |
| Processor |
Core 2 Duo T5500 (1.66 GHz, 2 MB L2, 667 MHz FSB) |
| RAM |
2 GB DDR2 667 SODIMM |
| Graphics Memory |
128 MB Shared memory |
| Ethernet Ports |
2x 10/100/1000 Mbit/s RJ45 |
| USB Ports |
4x V2.0 (high current) |
| Serial Port |
1x (COM1) |
| Storage Drives |
2x 250 GB SATA (2.5") |
| Optical Drive |
DVD +/-RW |
| Expansion Slots |
1x PCI, 1x PCIE (X4) |
| Operating System |
Windows XP Prof. Multi-lang. SP2 (de, de, fr, en fr, sp, it) |
| Power Supply |
24 V DC industrial |
| Special Features |
RAID controller onboard, CompactFlash Drive No. 1 front-side (without CF), Watchdog, temp./fan monitoring |
| Package Dimensions (Calculated) |
120.50 x 50.50 x 10.00 cm |
| Shipping Weight |
7.00 kg |
| Commodity Code |
85371091 |
| Export Control Regulations (ECCN) |
N |
Connections / Interfaces
-
Ethernet: 2x RJ45 ports for 10/100/1000 Mbit/s connections
-
USB: 4x USB V2.0 ports (high current)
-
Serial: 1x COM1 port
Installation Guidelines
-
De-energize System: Ensure all power to the installation area is disconnected before mounting or connecting the PC box.
-
Mounting: Securely mount the SIMATIC Box PC 627B in a suitable industrial enclosure or control cabinet, ensuring adequate ventilation around the unit to prevent overheating.
-
Power Connection: Connect the 24 V DC industrial power supply to the designated terminals, observing correct polarity. Verify the power source meets the specified voltage and current requirements.
-
Ethernet Connections: Connect standard RJ45 Ethernet cables to the 10/100/1000 Mbit/s ports for network integration.
-
USB Device Connection: Attach USB devices such as keyboards, mice, or external storage to the USB V2.0 ports.
-
Serial Device Connection: If required, connect serial devices to the COM1 port.
-
Expansion Cards: If utilizing the PCI or PCIE (X4) slots, install compatible expansion cards according to their respective guidelines and ensure they are properly seated.
-
Grounding: Ensure the PC box is properly grounded to the control cabinet or system ground to minimize electrical noise and enhance safety.
-
Cable Management: Route all cables neatly and securely, away from sources of electrical interference or mechanical stress.
-
System Startup: After all connections are verified, re-energize the system and power on the PC box. Monitor initial boot-up for any error indicators.