Siemens

Siemens 6ES7647-6BG26-0WF0 SIMATIC BOX PC 627B Industrial PC

SKU 6ES7647-6BG26-0WF0

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6ES7647-6BG26-0WF0

  • Country of origin:Germany

  • Product Type: Industrial PC

  • Barcode: 85371091

  • Payment: T/T, Western Union

  • Weight: 7000g

  • Dimensions: 120.5 x 50.5 x 10.0 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6ES7647-6BG26-0WF0 is a SIMATIC BOX PC 627B designed for robust industrial applications. This unit is equipped with an Intel Core 2 Duo T7400 2.16 GHz processor, 1 GB of DDR2 RAM, and a 24 V DC industrial power supply. It provides extensive connectivity with dual Gigabit Ethernet ports, four high-current USB 2.0 ports, and a serial COM port. The system features onboard graphics with 128 MB of shared memory and includes an integrated RAID controller. For storage, it is configured with two CompactFlash drive slots, one front-accessible and one internal, and is supplied with Windows XP Embedded on a 2 GB CompactFlash card.

Features

  • Intel Core 2 Duo T7400 processor at 2.16 GHz
  • 1 GB DDR2 667 SODIMM memory
  • Dual 10/100/1000 Mbit/s Ethernet ports for network redundancy or separation
  • Four high-current USB 2.0 ports for peripheral devices
  • Onboard RAID controller for data integrity
  • Integrated monitoring for watchdog, temperature, and fan status
  • Two available PCI slots for hardware expansion
  • Operates on a 24 V DC industrial power supply

Applications

  • Process visualization and HMI stations
  • Data acquisition and logging systems
  • Industrial control and automation gateways
  • Machine vision and quality control systems
  • Shop-floor data collection terminals

Technical Specifications

Specification Value
Manufacturer Siemens
Product Series SIMATIC BOX PC 627B
Processor Intel Core 2 Duo T7400 (2.16 GHz, 4 MB L2 Cache, 667 MHz FSB)
Memory (RAM) 1 GB DDR2 667 SODIMM
Graphics Onboard, 128 MB Shared Memory
Ethernet Interface 2 x 10/100/1000 Mbit/s RJ45
USB Interface 4 x USB 2.0 (High Current)
Serial Interface 1 x COM1
Storage Controller Onboard RAID Controller
Storage Drive 1 Front-side CompactFlash Drive (without CF card)
Storage Drive 2 Internal CompactFlash Drive (installed instead of HDD/ODD, without CF card)
Operating System Windows XP Embedded (SP2) English on 2 GB CompactFlash
Expansion Slots 2 x PCI (Free)
Power Supply 24 V DC
System Monitoring Watchdog, Temperature, Fan Monitoring
Product Lifecycle Status Obsolete
Country of Origin Germany (Estimate)
Package Dimensions 120.5 x 50.5 x 10.0 cm
Shipping Weight 7.00 kg

Installation Guidelines

CRITICAL WARNING: Risk of Electric Shock and Equipment Damage

Disconnect all power sources before installation or maintenance. This device contains components sensitive to electrostatic discharge (ESD). Use appropriate ESD protection, including wrist straps and mats, when handling. Failure to comply can result in equipment damage and personnel injury.

  1. 1 Site Preparation: Select a mounting location within an enclosure that provides adequate ventilation and protection from excessive vibration, moisture, and contaminants. Ensure sufficient clearance around the unit for airflow and cable access.
  2. 2 Mounting: Securely fasten the Box PC to the mounting panel using all provided mounting points. Ensure the chassis is level and stable to prevent mechanical stress.
  3. 3 Grounding: Connect the chassis ground terminal to the main panel's protective earth (PE) bus bar using a low-impedance conductor. A reliable ground connection is essential for safety and noise immunity.
  4. 4 Power Connection: Connect the 24 V DC power supply to the designated input terminals. Verify the polarity is correct before energizing the circuit. Use appropriately sized wiring for the load and distance.
  5. 5 I/O and Peripheral Wiring: Connect Ethernet, USB, serial, and any other required cables. Route signal cables separately from power cables to minimize electromagnetic interference. Ensure all connectors are fully seated.
  6. 6 Final System Check: After all connections are made, re-verify wiring against schematics. Apply power to the unit and check for correct boot sequence and status indicators. Proceed with software configuration as required.
Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 7 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Silver
Country of origin
Germany
Power source
DC Power

Technical knowledge

Derivative Action in PID Control Without Noise Problems

Learn what derivative action contributes to a PID loop, why it can amplify measurement noise and setpoint changes, and how filtering, sampling, and staged tests make D tuning safer.

Designing Industrial Networks That Stay Troubleshootable

A practical guide to segmenting, documenting, and testing industrial Ethernet networks so plant teams can isolate faults quickly, control change, and expand without creating fragile dependencies.

Commissioning IO-Link From Master Ports to IODD Data

Commission IO-Link systematically from master addressing and port modes through IODD selection, PLC byte mapping, parameter backups, device validation, and failure-injection tests.

PowerFlex Dynamic Braking Resistor Design and Testing

A practical PowerFlex braking guide covering regenerative energy, resistor resistance and duty cycle, thermal protection, model-specific parameters, and measured commissioning tests.

Engineering Industrial Joystick Controls for Safe Motion

An industrial joystick is only the first element in a safe motion command chain. This guide covers sensing choices, wiring, signal validation, PLC logic, restart behavior, and commissioning for...

Seeing PID Behavior Before Tuning the Loop

PID tuning becomes safer when engineers can see how proportional, integral, and derivative actions reshape error, output, and response over time. This guide turns live trends into a disciplined...