Siemens

Siemens 6ES7710-0BA12-0FB1 SIMATIC Field PG Programming Device

SKU 6ES7710-0BA12-0FB1

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6ES7710-0BA12-0FB1

  • Country of origin:Germany

  • Product Type: Industrial Programming Device

  • Barcode: 84713000

  • Payment: T/T, Western Union

  • Weight: 4g

  • Dimensions: 29.00 x 25.00 x 25.00 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6ES7710-0BA12-0FB1 is a SIMATIC Field PG programming device designed for industrial automation tasks. This robust unit features a Celeron 650 MHz processor with 128 KB of 2nd level cache, 128 MB of SDRAM, and a 15 GByte EIDE hard disk drive. It includes a CD-ROM drive and a SuperDisk LS 240 drive for versatile data handling. The device comes pre-installed with Windows 2000 MUI GEFSI and essential Siemens software, including STEP 7 and STEP 7 MicroWIN (installed August 2001), making it ready for programming and configuring SIMATIC controllers. It is supplied with a power cable suitable for use in Germany, France, Netherlands, Spain, Belgium, Austria, Sweden, and Finland.

Features

  • Celeron 650 MHz Processor with 128 KB 2nd Level Cache
  • 128 MB SDRAM (1x128 MB)
  • 15 GByte EIDE Hard Disk Drive
  • Integrated CD-ROM Drive
  • Integrated SuperDisk LS 240 Drive
  • Pre-installed Windows 2000 MUI GEFSI Operating System
  • Pre-installed Siemens STEP 7 and STEP 7 MicroWIN Software
  • Includes Power Cable for specific European regions

Applications

  • On-site programming and configuration of Siemens SIMATIC PLCs
  • Industrial automation system diagnostics and troubleshooting
  • HMI and SCADA system development and deployment
  • Software installation and updates for industrial control systems
  • Data backup and transfer in industrial environments

Technical Specifications

Brand Siemens
Manufacturer Siemens
Series SIMATIC Field PG
Model 6ES7710-0BA12-0FB1
Product Type Industrial Programming Device
Processor Celeron 650 MHz
Cache 128 KB 2nd Level Cache
RAM 128 MB SDRAM (1x128 MB)
Hard Drive 15 GByte HDD EIDE
Optical Drive CD ROM Drive
Floppy Drive SuperDisk LS 240 Drive
Operating System Windows 2000 MUI GEFSI
Pre-installed Software STEP 7, STEP 7 MicroWIN (installed 08/2001)
Power Cable Region Germany, France, Netherlands, Spain, Belgium, Austria, Sweden, Finland
PLM Product Phase Phase-Out
Package Dimensions (Calculated) 29.00 x 25.00 x 25.00 cm
Shipping Weight 4.00 kg
Commodity Code 84713000
Export Control Regulations (ECCN) N

Installation Guidelines

  1. Power Connection: Connect the appropriate power cable for the region (Germany, France, Netherlands, Spain, Belgium, Austria, Sweden, Finland) to a suitable power outlet. Ensure the power supply meets the device's requirements.
  2. Initial Boot-up: Power on the Field PG. Allow the pre-installed Windows 2000 operating system to load.
  3. Software Verification: Verify the presence and functionality of the pre-installed STEP 7 and STEP 7 MicroWIN software.
  4. Peripheral Connections: Connect any necessary external peripherals such as a mouse, keyboard, or external monitor as required for the programming task.
  5. Network Configuration: Configure network settings for communication with PLCs or other industrial devices as per site requirements.
  6. Environmental Considerations: Operate the device within a clean, dry industrial environment, avoiding excessive dust, moisture, or extreme temperatures to ensure longevity.
  7. Data Backup: Regularly back up critical project data and configurations to external storage to prevent data loss.

FAQ

What is the primary function of the Siemens 6ES7710-0BA12-0FB1?

It is an industrial programming device designed for configuring, programming, and diagnosing Siemens SIMATIC PLCs and other automation systems.

What operating system is pre-installed on this Field PG?

The device comes with Windows 2000 MUI GEFSI pre-installed.

Which Siemens software applications are included?

It includes pre-installed STEP 7 and STEP 7 MicroWIN software, installed in August 2001.

What are the main memory and storage specifications?

The Field PG is equipped with 128 MB of SDRAM and a 15 GByte EIDE hard disk drive.

For which regions is the included power cable suitable?

The power cable is suitable for Germany, France, Netherlands, Spain, Belgium, Austria, Sweden, and Finland.

View all FAQs →

Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 2 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Grounded or Floating 24 VDC? A Control-Panel Decision Guide

Grounding one side of a 24 VDC supply can improve fault detection and voltage reference, while floating circuits support isolation. This guide explains bonding, noise, first-fault behavior, and...

Seal-In Logic or OTL/OTU? Choosing PLC Memory Safely

Seal-in circuits and OTL/OTU instructions can hold the same command, but they fail differently. This guide compares scan behavior, restart risk, troubleshooting, permissives, and safer PLC design...

Commissioning a Micro800 PLC in FactoryTalk Design Workbench

A practical Micro800 commissioning workflow covering hardware checks, USB and Ethernet discovery, safe ladder testing, download risks, fault isolation, and project recovery in FactoryTalk Design...

Derivative Action in PID Control Without Noise Problems

Learn what derivative action contributes to a PID loop, why it can amplify measurement noise and setpoint changes, and how filtering, sampling, and staged tests make D tuning safer.

Designing Industrial Networks That Stay Troubleshootable

A practical guide to segmenting, documenting, and testing industrial Ethernet networks so plant teams can isolate faults quickly, control change, and expand without creating fragile dependencies.

Commissioning IO-Link From Master Ports to IODD Data

Commission IO-Link systematically from master addressing and port modes through IODD selection, PLC byte mapping, parameter backups, device validation, and failure-injection tests.