Siemens

Siemens 6ES7713-1BB14-0AD1 SIMATIC Field PG M2 Industrial Programming Device

SKU 6ES7713-1BB14-0AD1

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: Siemens

  • Product No.: 6ES7713-1BB14-0AD1

  • Country of origin:Germany

  • Product Type: Industrial Programming Device

  • Barcode: 85371091

  • Payment: T/T, Western Union

  • Weight: 4g

  • Dimensions: 29.0 x 25.0 x 25.0 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Description

The Siemens 6ES7713-1BB14-0AD1 is a SIMATIC Field PG M2, a ruggedized industrial programming device designed for commissioning, servicing, and maintaining automation systems. This Premium model is equipped with a 2.2 GHz Core 2 Duo (T7500) processor, 2 GB of DDR2 RAM, and a 250 GB S-ATA hard drive. It features a 15-inch SXGA+ display and comes pre-loaded with a comprehensive suite of Siemens automation software, including STEP 7 Professional, STEP 5, and WinCC flexible Advanced, on a Windows XP Professional operating system. The unit includes essential accessories such as an EPROM adapter and an S5-PLC cable for direct connectivity to legacy systems.

Features

  • Intel Core 2 Duo T7500 processor operating at 2.2 GHz.
  • 15-inch SXGA+ display with a resolution of 1400 x 1050 pixels.
  • 250 GB Serial ATA (S-ATA) hard disk drive for project storage.
  • 2 GB of DDR2 RAM installed.
  • Pre-installed Windows XP Professional English Multi-language User Interface (MUI).
  • Includes licenses for STEP 7 Professional, STEP 5, STEP 7 Micro/WIN, STEP 7 Basic, and WinCC flexible Advanced.
  • Equipped with a DL Multistandard DVD RW optical drive.
  • Includes EPROM adapter and S5-PLC cable for legacy system support.

Applications

  • Programming and configuration of SIMATIC S5 and S7 PLCs.
  • Development and commissioning of HMI applications with WinCC flexible.
  • On-site diagnostics, troubleshooting, and system maintenance.
  • Mobile engineering workstation for field service personnel in industrial plants.

Technical Specifications

General Information
Manufacturer Siemens
Product Series SIMATIC Field PG M2
Part Number 6ES7713-1BB14-0AD1
Product Type Premium Industrial Programming Device
Product Lifecycle Status Obsolete
Hardware Specifications
Processor Core 2 Duo (T7500), 2.2 GHz
Memory (RAM) 1 x 2 GB DDR2
Storage 250 GB S-ATA HDD
Display 15-inch SXGA+ (1400 x 1050)
Optical Drive DL Multistandard DVD RW
Software and Licensing
Operating System Windows XP Professional English MUI (with German, French, Spanish, Italian images)
Included Licenses STEP 7 Professional, STEP 5, STEP 7 Micro/WIN, STEP 7 Basic, WinCC flexible Advanced
Software Version 01/2008
Connectivity and Power
WLAN Approved for Europe
Modem Approved for Europe
Power Cable Included for Italy
Logistics and Compliance
Shipping Weight 4.00 kg
Package Dimensions (Calculated) 29.0 x 25.0 x 25.0 cm
Commodity Code 85371091
ECCN 5D992
Country of Origin Germany (Estimate)

Installation Guidelines

CRITICAL WARNING: This device operates on mains voltage. All setup and connection procedures must be performed by qualified personnel. Ensure the device is powered off and disconnected from the mains supply before connecting or disconnecting any PLC or communication cables. Failure to comply can result in equipment damage and risk of electric shock.
  1. 1 Visually inspect the Field PG for any signs of shipping damage to the chassis, screen, or ports before applying power. Verify that all included accessories are present.
  2. 2 Connect the provided power cable (specified for Italy) to the Field PG's power input and a suitable, grounded mains outlet. Allow the internal battery to charge if necessary.
  3. 3 Power on the device. Allow the Windows XP operating system to boot completely. Verify the functionality of the display, keyboard, and trackpad.
  4. 4 Launch the required Siemens engineering software (e.g., STEP 7). Configure the programming interface (PG/PC Interface) to match the communication protocol and hardware being used (e.g., MPI, PROFIBUS).
  5. 5 Connect the appropriate programming cable (e.g., the included S5-PLC cable) between the Field PG and the target automation device. Ensure a secure connection before attempting to go online with the controller.
  6. 6 Due to the age of the operating system and hardware, it is critical to perform regular backups of all project files and software licenses to an external storage medium.
Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 8 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Germany

Technical knowledge

Derivative Action in PID Control Without Noise Problems

Learn what derivative action contributes to a PID loop, why it can amplify measurement noise and setpoint changes, and how filtering, sampling, and staged tests make D tuning safer.

Designing Industrial Networks That Stay Troubleshootable

A practical guide to segmenting, documenting, and testing industrial Ethernet networks so plant teams can isolate faults quickly, control change, and expand without creating fragile dependencies.

Commissioning IO-Link From Master Ports to IODD Data

Commission IO-Link systematically from master addressing and port modes through IODD selection, PLC byte mapping, parameter backups, device validation, and failure-injection tests.

PowerFlex Dynamic Braking Resistor Design and Testing

A practical PowerFlex braking guide covering regenerative energy, resistor resistance and duty cycle, thermal protection, model-specific parameters, and measured commissioning tests.

Engineering Industrial Joystick Controls for Safe Motion

An industrial joystick is only the first element in a safe motion command chain. This guide covers sensing choices, wiring, signal validation, PLC logic, restart behavior, and commissioning for...

Seeing PID Behavior Before Tuning the Loop

PID tuning becomes safer when engineers can see how proportional, integral, and derivative actions reshape error, output, and response over time. This guide turns live trends into a disciplined...