Description
The Siemens 6ES7710-5CA14-3FB3 is a SIMATIC Field PG based on a Pentium III 1 GHz processor, designed for industrial programming and diagnostic tasks. It features 256 KB 2nd level cache, 128 MB SDRAM, a 20 GB EIDE HDD, and integrated DVD/CD ROM and 1.44 MB floppy disk drives. Pre-installed with Windows 2000 MUI GEFSI and various STEP software versions (STEP 7, STEP 5, STEP 7 MicroWIN) from June 2002, this programming device is equipped with a power cable suitable for specific European regions (Germany, France, Netherlands, Spain, Belgium, Austria, Sweden, Finland).
Features
- Pentium III 1 GHz Processor
- 256 KB 2nd Level Cache
- 128 MB SDRAM (1x128 MB)
- 20 GB EIDE Hard Disk Drive (HDD)
- Integrated DVD / CD ROM Drive
- Integrated 1.44 MB Floppy Disk Drive
- Pre-installed Windows 2000 MUI GEFSI
- Pre-installed STEP 7, STEP 5, STEP 7 MicroWIN Software (06/2002)
- Includes power cable for GER, FR, NL, SP, BEL, AUSTRIA, SWD, FIN
Applications
- Programming and configuration of Siemens SIMATIC PLCs (S7, S5).
- Diagnostic and troubleshooting for industrial automation systems.
- On-site commissioning and maintenance tasks for industrial control systems.
- Support for legacy SIMATIC installations requiring older software versions.
Technical Specifications
| Brand |
Siemens |
| Manufacturer |
Siemens |
| Range |
SIMATIC Field PG |
| Subrange |
Field PG |
| Product Type |
Programming Device (Pentium 3) |
| Processor |
Pentium III 1 GHz |
| Cache |
256 KB 2nd Level Cache |
| RAM |
128 MB SDRAM (1x128 MB) |
| Hard Disk Drive |
20 GB EIDE HDD |
| Optical Drive |
DVD / CD ROM Drive |
| Floppy Drive |
1.44 MB Floppy Disk Drive |
| Operating System |
Windows 2000 MUI GEFSI |
| Pre-installed Software |
STEP 7, STEP 5, STEP 7 MicroWIN (06/2002) |
| Included Accessories |
Power cable for GER, FR, NL, SP, BEL, AUSTRIA, SWD, FIN |
| Product Phase |
Obsolete |
| Package Dimensions (Calculated) |
29.00 x 25.00 x 25.00 cm |
| Shipping Weight |
4.00 kg |
| Commodity Code |
84713000 |
| Export Control Regulations (ECCN) |
N |
Installation Guidelines
-
Power Connection: Connect the device to a suitable power outlet using the provided power cable. Ensure the power supply matches the requirements for the specific region.
-
Environmental Considerations: Operate the Field PG in a clean, dry environment within its specified temperature and humidity ranges (if available). Protect it from excessive dust, moisture, and vibration.
-
Software Verification: Before connecting to any industrial system, verify the integrity and version of the pre-installed STEP software. Ensure compatibility with the target PLC or automation component.
-
Data Transfer: Utilize the integrated DVD/CD ROM or floppy disk drive for loading or saving program files. For network communication, ensure proper network settings and drivers are configured.
-
Safety Precautions: Always de-energize the target industrial system before connecting or disconnecting communication cables to the Field PG to prevent electrical hazards or damage to equipment.