Description
The Siemens 6GK5204-0BA00-2BA3 is a managed Industrial Ethernet switch from the SCALANCE X204IRT series, designed for isochronous real-time (IRT) motion control applications. This device provides reliable network management and high availability for demanding industrial automation systems. It features 4x 10/100 Mbit/s RJ45 ports for connecting automation components and serves as a PROFINET IO device with an integrated Redundancy Manager. The switch is equipped with an error signaling contact and supports a redundant power supply to ensure continuous operation and rapid fault diagnosis in critical production environments.
Features
- Four 10/100 Mbit/s RJ45 ports for network connectivity.
- Managed switch with integrated network management functions.
- Functions as a PROFINET IO device for seamless automation integration.
- Integrated Redundancy Manager enhances network availability.
- Features an error signaling contact with a set pushbutton for diagnostics.
- Supports redundant power supply inputs for increased operational reliability.
- Compatible with optional C-PLUG for configuration backup and rapid device replacement.
Applications
- High-performance machine networks requiring isochronous real-time (IRT) communication.
- PROFINET-based automation and motion control systems.
- Production lines with high demands on network availability and diagnostics.
- Network infrastructure in manufacturing cells and process control environments.
Technical Specifications
| Specification |
Value |
| Manufacturer |
Siemens |
| Product Series |
SCALANCE |
| Model Number |
6GK5204-0BA00-2BA3 |
| Product Type |
Managed Industrial Ethernet IRT Switch |
| Number of Ports |
4 |
| Port Type |
10/100 Mbit/s RJ45 |
| Supported Protocol |
PROFINET IO |
| Product Lifecycle Status |
Phase-Out |
| Shipping Weight |
0.92 kg |
| Package Dimensions (Provided) |
6.0 cm x 12.4 cm x 12.5 cm |
| Commodity Code |
85176200 |
| Export Control (ECCN) |
5A002 |
| Country of Origin |
Germany (Estimated) |
Installation Guidelines
CRITICAL WARNING: Disconnect and lock out all power sources to the control panel before installation or maintenance. Failure to de-energize equipment can result in severe electrical shock, injury, or death.
-
1
Securely mount the switch onto a standard 35mm DIN rail inside a suitable enclosure, ensuring adequate clearance for ventilation and cable access.
-
2
Connect the primary and, if used, redundant DC power supplies to the designated terminals. Verify correct polarity before energizing the unit.
-
3
Establish a low-impedance connection from the switch's functional earth terminal to the enclosure's main ground point using a short, appropriately sized conductor.
-
4
Connect shielded RJ45 Ethernet cables to the ports. Ensure connectors are fully seated and that cable shields are properly terminated at one end to prevent ground loops.
-
5
Wire the error signaling contact to the appropriate monitoring system or PLC input as required for system diagnostics and fault alarming.