1 de 1

Siemens 6AV7884-5AG20-6GA0 SIMATIC HMI IPC 477C Panel PC

Siemens 6AV7884-5AG20-6GA0 SIMATIC HMI IPC 477C Panel PC

Apenas 2 item(ns) restante(s) em estoque
  • Fabricante: Siemens

  • Nº do Produto: 6AV7884-5AG20-6GA0

  • País de origem:Alemanha

  • Tipo de Produto: Industrial Panel PC

  • Código de barras: 85371098

  • Pagamento: T/T, Western Union

  • Peso: 15g

  • Dimensões: 64.0 x 64.0 x 42.0 cm

  • Porto de embarque: Xiamen

  • Garantia: 12 meses

Quantidade
Ver informações completas

Description

The Siemens 6AV7884-5AG20-6GA0 is a SIMATIC HMI IPC 477C, an industrial-grade panel PC designed for demanding visualization and control tasks. This unit is equipped with a 19-inch touch display, an Intel Core 2 Duo 1.2 GHz processor, and 2 GB of DDR3 RAM. For storage, it includes a 50 GB high-endurance SATA solid-state drive (SSD) pre-installed with Windows 7 Ultimate MUI. Connectivity is provided through dual 1 Gbit/s PROFINET (IE) ports and five USB interfaces. This model is part of an optional bundle configuration and is supplied without pre-installed SIMATIC HMI software.

Features

  • 19-inch touch display with a native resolution of 1280 x 1024 pixels.
  • Powered by an Intel Core 2 Duo processor operating at 1.2 GHz.
  • Equipped with 2 GB of DDR3 system memory.
  • Includes a 50 GB high-endurance SATA Solid-State Drive (SSD) for robust data storage.
  • Integrated dual-port PROFINET (IE) interface with 1 Gbit/s speed.
  • Features a total of five USB ports: four on the rear and one on the front for easy access.
  • Comes pre-installed with the Windows 7 Ultimate (MUI) operating system.

Applications

  • Human-Machine Interface (HMI) for complex machinery.
  • Supervisory Control and Data Acquisition (SCADA) systems.
  • Process visualization and control in manufacturing environments.
  • Data logging and analysis at the machine level.
  • Industrial automation gateways and controllers.

Technical Specifications

Category Specification
General Information Manufacturer: Siemens
Model: 6AV7884-5AG20-6GA0
Series: SIMATIC HMI IPC 477C
Product Type: Industrial Panel PC
Product Lifecycle Status: Phase-Out
Processing Unit CPU: Intel Core 2 Duo, 1.2 GHz
Memory: 2 GB RAM, DDR3
Display Type: Touch Display
Size: 19 inch
Resolution: 1280 x 1024 pixels
Storage Type: Solid-State Drive (SSD), High Endurance
Capacity: 50 GB
Interface: SATA
Interfaces Ethernet: 2 x 1 Gbit/s PROFINET (IE)
USB: 4 x Rear Ports, 1 x Front Port
Software Operating System: Windows 7 Ultimate MUI (pre-installed)
Logistics Country of Origin: Germany (Estimate)
Commodity Code: 85371098
ECCN: N
Package Dimensions: 64.0 x 64.0 x 42.0 cm
Shipping Weight: 15.00 kg

Installation Guidelines

CRITICAL WARNING: Hazardous voltages are present within industrial control panels. All installation, wiring, and maintenance must be performed by qualified personnel only. Ensure the main power supply to the cabinet is de-energized and locked out (LOTO) before beginning work. Failure to comply can result in severe injury or death.
  1. 1
    De-energize Equipment: Before installation, completely disconnect and lock out all power sources to the control cabinet or mounting location. Verify the absence of voltage using a properly rated test instrument.
  2. 2
    Prepare Panel Cutout: Ensure the mounting cutout in the enclosure door or panel corresponds to the IPC 477C's required dimensions. Deburr all sharp edges to prevent damage to cables and ensure a proper seal.
  3. 3
    Mount the Unit: Insert the Panel PC into the cutout from the front. Secure it from the rear using the provided mounting clamps. Tighten the clamp screws evenly in a cross-pattern to ensure uniform gasket compression and a proper IP rating.
  4. 4
    Connect Protective Earth (PE): Connect a low-impedance protective earth conductor to the designated PE terminal on the unit's chassis. This is critical for operator safety and noise immunity.
  5. 5
    Connect Power and Interfaces: Connect the DC power supply, PROFINET network cables, and any required USB peripherals. Ensure all connectors are fully seated and secured. Route cables away from high-voltage lines to minimize electrical noise.
  6. 6
    Power-Up and Verification: After closing the cabinet and removing all lock-out/tag-out devices, restore power to the system. Verify that the Panel PC boots correctly into the Windows operating system and that network communication is established.

Envio Expresso Global

  • Entrega Padrão: 4-6 dias úteis via DHL, FedEx e UPS.
  • Despacho Expresso: Envio no mesmo dia para pedidos em estoque realizados antes das 14:00 (GMT+8).
  • Cobertura Mundial: Atendendo mais de 150 países, incluindo entrega rápida para Arábia Saudita e Emirados Árabes Unidos.

Devoluções e Garantia

  • Garantia de 30 Dias: Devoluções aceitas para produtos em estoque na embalagem original, lacrada de fábrica.
  • Garantia de 12 Meses: Cada componente industrial é coberto pela nossa garantia técnica profissional.

Os pedidos são processados e entregues de segunda a sexta-feira (exceto feriados).


Para elegibilidade completa, taxas de reabastecimento e detalhes de devolução internacional, por favor, consulte nosso oficial Política de Reembolso e Devolução .

TECHNICAL SPECIFICATIONS

Country of origin
Alemanha

Produtos Visualizados Recentemente

Conhecimento técnico

Lógica Booleana na Programação de CLP: Entendendo Portas Lógicas FBD

A lógica booleana é a base de todo programa PLC. Desde controles simples de máquinas até sistemas complexos de automação industrial, as portas lógicas determinam como os controladores respondem a...

Guia Completo sobre Firewalls Industriais e Segmentação de Redes OT

Firewalls industriais desempenham um papel crítico na cibersegurança OT, protegendo redes PLC, DCS e SCADA por meio de segmentação, controle de entrada/saída e integração IDS/IPS alinhada aos...

Guia de Garras Robóticas: Desde o Manuseio Delicado até a Automação Pesada

As garras robóticas modernas estão evoluindo além das mandíbulas mecânicas tradicionais. De sistemas adesivos inspirados em lagartos-gecko e garras macias de grau alimentício a ferramentas de armazém...

Retrospectiva: Como os Primeiros Motores Elétricos Mudaram a Mineração Subterrânea

De compressores CC acionados por corda a carrinhos de mina movidos a bateria, as operações de mineração iniciais marcaram um ponto de virada na eletrificação industrial. Este artigo explora como os...

Factory I/O: Uma Ferramenta Moderna de Simulação de CLP para Treinamento em Automação Industrial

Factory I/O está transformando a educação em CLP ao oferecer simulações industriais 3D imersivas para estudantes, engenheiros e equipes de manutenção. A plataforma reduz a distância entre a teoria e...

Programando Ciclos de Movimento de Eixo Único em um Servo Drive CMZ

Este tutorial examina como a funcionalidade PLC integrada dentro de um servo drive CMZ SBD pode executar programas de movimento autônomos, incluindo lógica de referência, controle de posição e...