1 de 1

Siemens 6ES7647-6MA12-0BC0 SIMATIC BOX PC 840 V2 Industrial PC

Siemens 6ES7647-6MA12-0BC0 SIMATIC BOX PC 840 V2 Industrial PC

Only 4 item(s) left in stock
  • Manufacturer: Siemens

  • Product No.: 6ES7647-6MA12-0BC0

  • Country of origin:Alemanha

  • Product Type: Industrial PC

  • Barcode: 85381091

  • Payment: T/T, Western Union

  • Weight: 5g

  • Dimensions: 55 cm x 45 cm x 25 cm

  • Shipping port: Xiamen

  • Warranty: 12 months

Quantidade
Ver informações completas

Description

The Siemens 6ES7647-6MA12-0BC0 is an industrial computer from the SIMATIC BOX PC 840 V2 series, designed for robust performance in demanding automation environments. This unit is equipped with a Celeron 2.0 GHz processor, 256 MB of DDR SDRAM, and an 80 GB EIDE hard disk drive. It features a versatile set of expansion slots, including PCI and ISA, to accommodate various legacy and modern interface cards. Integrated monitoring functions such as a watchdog timer and temperature monitoring ensure operational reliability. The system is pre-installed with Windows NT 4.0 Workstation and includes an industrial-grade power supply unit compatible with 110/230V AC inputs.

Features

  • Powered by a Celeron 2.0 GHz processor with a 400 MHz Front Side Bus.
  • Equipped with 256 MB of DDR SDRAM for application processing.
  • Includes an 80 GB EIDE Hard Disk Drive, a Floppy Disk Drive (FDD), and a DVD-ROM drive.
  • Onboard AGP graphics with 8/16/32 MB of shared memory.
  • Features a mix of expansion slots: 2x PCI, 2x ISA/PCI, and 1x ISA.
  • Integrated 10/100 Mbit/s Ethernet port for network connectivity.
  • Two high-current USB ports for peripheral devices.
  • Built-in watchdog timer and temperature monitoring for system stability.
  • Industrial power supply unit rated for 110/230V AC with NAMUR compliance.

Applications

  • Human-Machine Interface (HMI) and SCADA visualization stations.
  • Data acquisition, logging, and archival systems.
  • Industrial control and communication gateways.
  • Machine-level data processing and analysis.
  • Platform for legacy automation software requiring Windows NT.

Technical Specifications

Specification Value
Manufacturer Siemens
Series SIMATIC BOX PC 840 V2
Processor Celeron 2.0 GHz
Front Side Bus (FSB) 400 MHz
Processor Cache 128 KB SLC
Memory (RAM) 256 MB DDR SDRAM
Storage 80 GB EIDE Hard Disk Drive
Optical / Removable Media DVD-ROM Drive, Floppy Disk Drive (FDD)
Graphics Onboard AGP with 8/16/32 MB Shared Memory
Ethernet Interface 1 x 10/100 Mbit/s RJ45
USB Interface 2 x USB (High Current)
Expansion Slots 2 x PCI, 2 x ISA/PCI, 1 x ISA
Power Supply 110/230V AC Industrial Power Unit with NAMUR
Operating System Windows NT 4.0 Workstation English, Service Pack 6a
System Monitoring Watchdog, Temperature Monitoring
Product Lifecycle Status Obsolete
Shipping Weight 5.00 kg
Commodity Code 85381091
Country of Origin (Estimate) Germany
Package Dimensions (Calculated) 55 cm x 45 cm x 25 cm

Installation Guidelines

CRITICAL WARNING: Hazardous voltages are present within this equipment. All installation, maintenance, and removal procedures must be performed by qualified personnel only. Ensure the main power supply is de-energized and locked out/tagged out (LOTO) before accessing any internal components or making connections.
  1. 1 Site Preparation: Verify the installation environment meets the PC's operational requirements for temperature, humidity, and vibration. Ensure adequate clearance for ventilation around the chassis to prevent overheating.
  2. 2 Mechanical Mounting: Securely mount the Box PC chassis to a stable panel or surface using all designated mounting points. Use appropriate hardware and torque settings to prevent loosening due to machine vibration.
  3. 3 Protective Earth (PE) Connection: Connect the chassis PE terminal to the facility's main protective earth bus using a low-impedance conductor. This is a critical step for electrical safety and noise immunity.
  4. 4 Power and I/O Wiring: Connect the AC power supply cable to a properly rated and protected circuit. Connect all peripheral and network cables (Ethernet, USB, video). Ensure all cable shields are properly terminated as required.
  5. 5 Final Checks and Power-Up: Before applying power, double-check all connections for correctness and security. Remove all tools and foreign objects from the enclosure. Close and secure all access panels. Re-energize the main power supply and boot the system.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Country of origin
Alemanha

Recently Viewed Products

Technical knowledge

Guia Completo sobre Firewalls Industriais e Segmentação de Redes OT

Firewalls industriais desempenham um papel crítico na cibersegurança OT, protegendo redes PLC, DCS e SCADA por meio de segmentação, controle de entrada/saída e integração IDS/IPS alinhada aos...

Guia de Garras Robóticas: Desde o Manuseio Delicado até a Automação Pesada

As garras robóticas modernas estão evoluindo além das mandíbulas mecânicas tradicionais. De sistemas adesivos inspirados em lagartos-gecko e garras macias de grau alimentício a ferramentas de armazém...

Retrospectiva: Como os Primeiros Motores Elétricos Mudaram a Mineração Subterrânea

De compressores CC acionados por corda a carrinhos de mina movidos a bateria, as operações de mineração iniciais marcaram um ponto de virada na eletrificação industrial. Este artigo explora como os...

Factory I/O: Uma Ferramenta Moderna de Simulação de CLP para Treinamento em Automação Industrial

Factory I/O está transformando a educação em CLP ao oferecer simulações industriais 3D imersivas para estudantes, engenheiros e equipes de manutenção. A plataforma reduz a distância entre a teoria e...

Programando Ciclos de Movimento de Eixo Único em um Servo Drive CMZ

Este tutorial examina como a funcionalidade PLC integrada dentro de um servo drive CMZ SBD pode executar programas de movimento autônomos, incluindo lógica de referência, controle de posição e...

Configuração de Controle de Movimento de Eixo Único com Drives Servo CMZ

Este tutorial explora a comissionamento de um sistema de movimento servo de eixo único usando um drive CMZ SBD, abrangendo a configuração de hardware, escala do eixo, configuração de homing e...