1 из 1

Beckhoff EL9227-5500 EL Series Overcurrent Protection Terminal

Beckhoff EL9227-5500 EL Series Overcurrent Protection Terminal

Остался в наличии только 10 товар(ы)
  • Производитель: BECKHOFF

  • Номер продукта: EL9227-5500

  • Страна происхождения:Германия

  • Тип продукта: Overcurrent Protection Terminals

  • Оплата: Т/Т, Western Union

  • Вес: 2000г

  • Размеры: 12 mm x 100 mm x 68 mm

  • Порт отправления: Сямынь

  • Гарантия: 12 месяцев

Количество
Просмотреть полные детали

Description

Providing precise circuit-level protection, the Beckhoff EL9227-5500 electronic overcurrent protection terminal distributes and monitors 24 V DC power across two channels within EtherCAT I/O networks. This module integrates adjustable current limit settings, diagnostic pre-warnings, and physical LED status buttons, making it a critical component for safeguarding sensitive field sensors, actuators, and industrial controllers from localized electrical faults. By isolating individual overloaded channels, the terminal prevents system-wide voltage sags and maximizes total machinery uptime.

Features

  • 2-Channel Protection: Two independent 24 V DC channels with continuous monitoring and discrete electronic shutdown.
  • Adjustable Current Ratings: Trip currents can be programmed from 1 A to 10 A in steps of 1 A, with a maximum combined sum current of 10 A.
  • Intelligent Diagnostic Warnings: Configurable load warnings (50% to 100%) and low-voltage warnings (17 V to 24 V DC) prevent unexpected downtime.
  • Hardware Redundancy: Dual integrated 15 A fail-safe fast fuses provide hardware-level backup protection on both channels.
  • Enhanced Physical Interfaces: Features integrated LED diagnostic buttons on the front plate for direct manual control and quick local troubleshooting.

Applications

  • Control Cabinet Power Distribution: Safe division of 24 V DC main lines into branch circuits for PLC controllers, HMIs, and networking devices.
  • Industrial Sensor/Actuator Protection: Segmented protection of field devices to prevent localized cable damage or shorts from collapsing the main power rail.
  • Automated Assembly & Robotic Cells: Protects motion control auxiliary lines and safety circuits where temporary overloads may occur.

Technical Specifications

Technical Parameter Specification Value
Manufacturer Beckhoff
Model Number EL9227-5500
Nominal Operating Voltage 24 V DC
Number of Channels 2 (Inputs: 2, Outputs: 2)
Rated Output Current Adjustable 1 A to 10 A (in 1 A steps; max. sum 10 A)
E-bus Current Consumption Typically 80 mA
Electrical Isolation 500 V (E-bus / signal voltage)
Overvoltage Power-off Threshold >= 32 V DC
Integrated Fail-Safe Element 15 A (F) per channel
Operating Temperature 0 to +55 degC
Storage Temperature -25 to +85 degC
Housing Material Polycarbonate
Dimensions (W x H x D) 12 mm x 100 mm x 68 mm
Connection Cross-Section (Solid/Stranded) 0.08 to 2.5 mm² (AWG 28 to 14)
Connection Cross-Section (with Ferrule) 0.14 to 1.5 mm² (AWG 26 to 16)
Stripping Length 8 to 9 mm
Approvals and Markings CE, cULus, cURus

Empirical Engineering Insights

Alternative Models & Compatibility

The EL9227-5500 differs from the basic EL9227 variants by offering extended configuration capabilities directly via the TwinCAT CoE (CoE directory) system. Standard EL9227 terminals typically use physical rotary switches or fixed parameters. In contrast, the EL9227-5500 allows dynamic adjustments of current steps and warning parameters over the EtherCAT backplane, which requires a corresponding up-to-date ESI (XML) device file inside TwinCAT.

Application Pitfalls & Engineering Notes

Keep in mind that the total sum of current through the power contacts must not exceed 10 A continuously. When installing multiple high-load EL9227-5500 terminals side-by-side, calculate the cumulative thermal profile inside the panel. In unventilated control boxes, operating at ambient temperatures near +55 degC can lower the thermal hold duration of the electronic switch-off, causing premature tripping at transient peak currents.

Commissioning & Wiring Tips

Use standard spring-actuated terminations. For stranded wires, utilizing gas-tight crimped ferrules is highly recommended to prevent micro-arcs and transient resistance fluctuations. Ensure that the 24 V DC common negative rail (0 V) is bonded properly to the primary control cabinet ground to allow reliable detection of low-resistance earth faults.

Installation Guidelines

CRITICAL WARNING:

Risk of arc flash and electrical damage. Isolate all 24 V DC field supply currents and disconnect the main AC/DC control transformer prior to terminal insertion or extraction. Never insert or pull terminals under load.

1
Mount the terminal on a standard 35 mm DIN rail conforming to EN 60715, ensuring the locking slide is secure.
2
Slide the terminal adjacent to the existing EtherCAT terminals so that the lateral tongue-and-groove system and gold power contacts engage cleanly.
3
Strip field wiring cables to 8–9 mm. Depress the terminal spring mechanism with a small flathead screwdriver, insert the conductor, and release to lock.
4
Energize the backplane, run TwinCAT System Manager, scan the EtherCAT box topology, and configure the CoE threshold parameters for output channels 1 and 2.
Loading product navigation…

How do you adjust the rated current limit on this terminal?

The overcurrent trip limits are fully adjustable from 1 A to 10 A in 1 A increments. These settings are customized and written via the CAN over EtherCAT (CoE) online directory inside TwinCAT.

What is the E-bus power draw for the Beckhoff EL9227-5500?

The module draws a typical current of 80 mA from the E-bus. System designers must ensure the upstream EtherCAT Coupler or power supply terminal provides adequate current for the total E-bus load.

How does the diagnostic warning system function on this module?

This module provides adjustable pre-warning thresholds. The load warning is adjustable from 50% to 100% of the set current, and the low-voltage pre-warning is adjustable from 17 V to 24 V DC, enabling proactive maintenance before a full trip occurs.

Глобальная экспресс-доставка

  • Стандартная доставка: 4-6 рабочих дней через DHL, FedEx и UPS.
  • Экспресс-отправка: Отправка в тот же день для заказов со склада, сделанных до 14:00 (GMT+8).
  • Мировое покрытие: Обслуживаем более 150 стран, включая быструю доставку в Саудовскую Аравию и ОАЭ.

Возвраты и гарантия

  • 30-дневная гарантия: Принимаются возвраты товаров со склада в оригинальной, заводской упаковке.
  • 12-месячная гарантия: Каждый промышленный компонент поддерживается нашей профессиональной технической гарантией.

Заказы обрабатываются и доставляются с понедельника по пятницу (кроме государственных праздников).


Для полной информации о праве на возврат, сборах за пополнение запасов и международных возвратах, пожалуйста, ознакомьтесь с нашей официальной Политика возврата и возмещения .

TECHNICAL SPECIFICATIONS

Country of origin
Германия

Недавно просмотренные товары

Технические знания

Электрические приводы, разработанные для замены гидравлических систем: практическое руководство по промышленной автоматизации

В этой статье объясняется, как интегрированные электрические приводы, такие как серия e-Actuator от SMC, преобразуют промышленное управление движением, заменяя традиционные пневматические и...

Математические операции с использованием OpenPLC для промышленных автоматизированных систем

В этой статье объясняется, как системы ПЛК выполняют основные математические операции, такие как сложение, вычитание, умножение, деление, взятие остатка и возведение в степень в рамках промышленной...

Продвинутая булева логика в программировании ПЛК с использованием FBD: практические промышленные применения за пределами базовой логики

В статье объясняются несколько продвинутых функций булевой логики, используемых в программировании ПЛК, помимо базовых операций AND, OR и NOT. Рассматривается, как такие инструменты, как таблицы...

Булева логика в программировании ПЛК: понимание логических элементов FBD

Булева логика является основой каждой программы ПЛК. От простого управления машинами до сложных систем промышленной автоматизации, логические элементы определяют, как контроллеры реагируют на...

Подробное руководство по промышленным файрволам и сегментации сетей ОТ

Промышленные межсетевые экраны играют ключевую роль в кибербезопасности операционных технологий, защищая сети ПЛК, ДСК и SCADA посредством сегментации, контроля входящего и исходящего трафика, а...

Руководство по роботизированным захватам: от деликатного обращения до тяжелой автоматизации

Современные роботизированные захваты развиваются дальше традиционных механических челюстей. От систем с клеящими поверхностями, вдохновлёнными гекконами, и мягких захватов пищевого класса до...