1 trong số 3

Honeywell 10310/2/1 Fail Safe Control Earth Leakage Detector

Honeywell 10310/2/1 Fail Safe Control Earth Leakage Detector

Only 4 item(s) left in stock
  • Manufacturer: Honeywell

  • Product No.: 10310/2/1

  • Country of origin:Hoa Kỳ

  • Product Type: Earth Leakage Detectors

  • Payment: T/T, Western Union

  • Weight: 1500g

  • Dimensions: 180 mm x 120 mm x 60 mm

  • Shipping port: Xiamen

  • Warranty: 12 months

Số lượng
Xem toàn bộ chi tiết

Description

Integrating directly into Honeywell Fail Safe Control (FSC) and Safety Manager architectures, the Honeywell 10310/2/1 functions as a specialized DC earth leakage detector to monitor insulation degradation and ground faults. This module continuously evaluates DC distribution systems to detect active ground faults before they escalate into systemic failures or hazardous plant shutdowns. Operating on a nominal 24 VDC power supply, the unit maintains a balanced earth reference of -12 VDC under normal, non-fault operating conditions. Any electrical current imbalance on the DC loop is registered by the internal monitoring circuitry, triggering an output relay once the current leakage exceeds a predefined threshold limit.

Key Features

  • Continuous DC Supervision: Real-time insulation integrity monitoring of balanced 24 VDC power networks.
  • Multi-Mode Frequency Switching: Selectable DC mode for operational monitoring alongside 1 Hz and 0.25 Hz pulsed modes for pinpointing localized earth faults.
  • Integrated Self-Test Capability: Front-accessible manual test function allows validation of physical loop integrity and output relays.
  • Dual Reset Controls: Supports both local manual reset and remote reset integration via designated 24 VDC or 110 VAC inputs.
  • Front-Panel Diagnostics: High-visibility LED indicator displays live status variations and selected test pulse frequencies.

Applications

  • Emergency Shutdown Systems (ESD) and safety-critical process networks.
  • Petrochemical, oil and gas, and refining safety management platforms.
  • High-availability DC auxiliary power panels in heavy utility generation plants.

Technical Specifications

Parameter Value / Specification
Manufacturer Honeywell
Model Number 10310/2/1
System Compatibility Fail Safe Control (FSC) / Safety Manager
Nominal Supply Voltage 24 VDC
Operating Voltage Range 18 VDC to 30 VDC
Normal Earth Reference -12 VDC
Leakage Trip Threshold 5.5 mA +/- 1 mA
Signal Outputs Dry contact relay output
Contact Power Rating 1 A at 115 VAC or 100 W at 24 VDC
Operating Pulse Frequencies DC (Normal), 1.0 Hz (Fast), 0.25 Hz (Slow tracing)
Mounting Configuration DIN rail or FSC Rack Interface (Slot positions A5, A11)
Shipping Weight (Calculated) 1.5 kg
Package Dimensions (Calculated) 180 mm x 120 mm x 60 mm

Connections and Interfaces

Interface Type Electrical Assignment
Rst24 Terminal Remote manual reset input via standard 24 VDC signal pulse
Rst110 Terminal Remote manual reset input via high-voltage 110 VAC signal pulse
Relay Contact Blocks Potential-free changeover contact for remote DCS or Safety Manager fault registration

Empirical Engineering Insights

Alternative Models & Compatibility

The 10310/2/1 is engineered specifically for Safety Manager and Fail Safe Control (FSC) hardware revisions. While physical slide-in mounting fits standard A5 and A11 slot matrices, verify existing system bus revisions to ensure backplane compatibility with remote software reset calls.

Application Pitfalls & Engineering Notes

During heavy inductive switching or when system lines feature highly distributed cable lengths, parasitic capacitance can induce transient currents. This dynamic capacitive charging can cause nuisance tripping near the 5.5 mA leakage threshold. Segment the DC distribution if line capacitance consistently breaches typical operational limits.

Commissioning & Wiring Tips

When utilizing the low-frequency 0.25 Hz pulsed mode to locate localized earth faults in the field, use a low-frequency current clamp paired with a high-impedance digital multimeter. Standard clamp-on sensors often register 0.25 Hz pulses as thermal drift, yielding incorrect readings.

Installation Guidelines

CRITICAL WARNING: De-energize and lock out all upstream DC power distribution systems before executing physical installation. Do not ground or jumper the reference earth terminal during operations, as accidental reference shorts can damage the internal sensing circuits of adjacent control modules in the FSC rack.
1
Install the module into the designated DIN rail mounting space or securely slide it into position within designated FSC rack slots (A5 or A11).
2
Connect the 24 VDC primary power supply lines and secure the dedicated earth ground reference wiring to the local terminal strip.
3
Integrate the relay contact monitoring connections directly into the safety system's functional alarm logic inputs.
4
Activate control system power and press the front manual test button to confirm real-time system alarm actuation and relay health.

What is the primary function of the Honeywell 10310/2/1 module?

It serves as an Earth Leakage Detector (ELD) that continuously monitors 24 VDC distribution networks inside Fail Safe Control (FSC) and Safety Manager panels for ground path insulation breakdown.

How do the 1 Hz and 0.25 Hz pulse modes assist field technicians?

These modes pulse the earth reference path at low frequencies to allow technicians to trace the physical path of a ground fault using a specialized DC current clamp and voltmeter without taking the system offline.

What are the remote reset electrical ratings for the 10310/2/1?

The module features distinct remote reset inputs: Rst24 for standard 24 VDC safety logic loops and Rst110 for high-voltage 110 VAC signal loops.

How does the module respond to a ground leakage event?

Once earth leakage current exceeds the calibrated 5.5 mA threshold, the dry relay contacts change state, initiating alarm logic in the Safety Manager.

Vận chuyển nhanh toàn cầu

  • Giao hàng tiêu chuẩn: 4-6 ngày làm việc qua DHL, FedEx và UPS.
  • Giao hàng nhanh: Giao hàng trong ngày cho đơn đặt hàng có sẵn trong kho trước 2:00 chiều (GMT+8).
  • Phủ sóng toàn cầu: Phục vụ hơn 150 quốc gia, bao gồm giao hàng nhanh đến Saudi Arabia và UAE.

Trả hàng & Bảo hành

  • Đảm bảo 30 ngày: Chấp nhận trả hàng cho sản phẩm có sẵn trong kho với bao bì nguyên bản, niêm phong từ nhà máy.
  • Bảo hành 12 tháng: Mỗi linh kiện công nghiệp đều được bảo hành kỹ thuật chuyên nghiệp.

Đơn hàng được xử lý và giao từ thứ Hai đến thứ Sáu (không bao gồm ngày lễ).


Để biết đầy đủ điều kiện, phí lưu kho và chi tiết trả hàng quốc tế, vui lòng xem trang chính thức của chúng tôi Chính sách Hoàn tiền & Trả hàng .

TECHNICAL SPECIFICATIONS

Country of origin
Hoa Kỳ

Sản phẩm đã xem gần đây

Kiến thức kỹ thuật

Bộ truyền động điện được thiết kế để thay thế hệ thống thủy lực: Hướng dẫn tự động hóa công nghiệp thực tiễn

Bài viết này giải thích cách các bộ truyền động điện tích hợp, như dòng e-Actuator của SMC, đang thay đổi điều khiển chuyển động công nghiệp bằng cách thay thế các hệ thống khí nén và thủy lực truyền...

Các phép toán toán học sử dụng OpenPLC cho các ứng dụng tự động hóa công nghiệp

Bài viết này giải thích cách các hệ thống PLC thực hiện các phép toán cơ bản như cộng, trừ, nhân, chia, modulo và lũy thừa trong tự động hóa công nghiệp. Nó trình bày cách các khối chức năng này...

Logic Boolean Nâng Cao với Lập Trình PLC FBD: Ứng Dụng Công Nghiệp Thực Tiễn Vượt Xa Logic Cơ Bản

Bài viết giải thích một số hàm logic Boolean nâng cao được sử dụng trong lập trình PLC ngoài các phép toán cơ bản AND, OR và NOT. Nó trình bày cách các công cụ như bảng chân trị, bộ chọn đa kênh, bộ...

Logic Boolean trong Lập trình PLC: Hiểu về Cổng Logic FBD

Logic Boolean là nền tảng của mọi chương trình PLC. Từ các điều khiển máy đơn giản đến các hệ thống tự động hóa công nghiệp phức tạp, các cổng logic quyết định cách các bộ điều khiển phản ứng với các...

Hướng Dẫn Chi Tiết Về Tường Lửa Công Nghiệp và Phân Vùng Mạng OT

Tường lửa công nghiệp đóng vai trò quan trọng trong an ninh mạng OT, bảo vệ các mạng PLC, DCS và SCADA thông qua phân đoạn, kiểm soát truy nhập/ra vào và tích hợp IDS/IPS phù hợp với các nguyên tắc...

Hướng dẫn về Càng Robot: Từ Xử lý Nhẹ Nhàng đến Tự động Hóa Công Suất Nặng

Các bộ kẹp robot hiện đại đang phát triển vượt ra ngoài các hàm cơ học truyền thống. Từ hệ thống dính lấy cảm hứng từ tắc kè, bộ kẹp mềm đạt chuẩn thực phẩm đến các công cụ kho hàng được trang bị trí...