1 von 1

Siemens 6ES7675-1DK30-2AL0 SIMATIC IPC427C Microbox PC Bundle

Siemens 6ES7675-1DK30-2AL0 SIMATIC IPC427C Microbox PC Bundle

Nur noch 3 Artikel auf Lager verfügbar
  • Hersteller: Siemens

  • Produkt-Nr.: 6ES7675-1DK30-2AL0

  • Herkunftsland:Deutschland

  • Produkttyp: Industrial PC

  • Strichcode: 85371091

  • Zahlung: T/T, Western Union

  • Gewicht: 3400g

  • Abmessungen: 18.5 cm x 18.5 cm x 15.0 cm

  • Versandhafen: Xiamen

  • Garantie: 12 Monate

Anzahl
Vollständige Details anzeigen

Description

This is a Siemens 6ES7675-1DK30-2AL0, a pre-configured SIMATIC IPC427C Microbox PC bundle designed for demanding PC-based automation tasks. The unit is equipped with an Intel Core 2 Duo 1.2 GHz processor, 2 GB of DDR3 RAM, and a 50 GB high-endurance SATA Solid-State Drive (SSD) for reliable, fanless operation. It comes pre-installed with a comprehensive software package including Windows Embedded Standard 2009, the WinAC RTX 2010 software controller, and WinCC flexible 2008 RT for HMI applications. Connectivity is provided through one PROFIBUS DP port and two 1 Gbit/s Industrial Ethernet interfaces, making it suitable for integrated control and visualization solutions.

Features

  • Processor: Intel Core 2 Duo at 1.2 GHz with 800 MHz FSB
  • Memory: 2 GB DDR3 1066 SODIMM
  • Storage: 50 GB High-Endurance SATA Solid-State Drive (SSD)
  • Operating System: Windows Embedded Standard 2009 (Pre-installed)
  • Software Controller: WinAC RTX 2010
  • HMI Runtime: WinCC flexible 2008 RT (512 PowerTags)
  • Industrial Communication: 1x PROFIBUS DP, 2x Gigabit Industrial Ethernet
  • Compact, fanless Microbox design

Applications

  • PC-based machine control and automation
  • Human-Machine Interface (HMI) and SCADA applications
  • Data acquisition, logging, and processing at the machine level
  • Gateway and communication tasks in industrial networks
  • Process control and visualization in manufacturing

Technical Specifications

Category Specification
General
Part Number 6ES7675-1DK30-2AL0
Base Model SIMATIC IPC427C Microbox PC
Product Lifecycle Status Phase-Out
Hardware
Processor Intel Core 2 Duo, 1.2 GHz
Front Side Bus (FSB) 800 MHz
Memory 2 GB DDR3 1066, SODIMM
Storage 50 GB Solid-State Drive (SATA, High Endurance)
Software
Operating System Windows Embedded Standard 2009
Control Software WinAC RTX 2010
HMI Runtime WinCC flexible 2008 RT (512 PowerTags)
Interfaces
PROFIBUS 1x PROFIBUS DP
Ethernet 2x Industrial Ethernet (1 Gbit/s)
Logistics
Shipping Weight 3.40 kg
Package Dimensions (Calculated) 18.5 cm x 18.5 cm x 15.0 cm
Country of Origin (Estimate) Germany
Commodity Code 85371091
ECCN N

Installation Guidelines

CRITICAL WARNING: RISK OF ELECTRIC SHOCK AND EQUIPMENT DAMAGE

Installation must be performed by qualified personnel only. Disconnect all power sources and follow Lockout/Tagout (LOTO) procedures before accessing or installing this equipment. This device contains components sensitive to electrostatic discharge (ESD). Use proper ESD protection, including wrist straps and grounded mats, during handling and installation.

  1. 1 De-energize System: Before installation, ensure the control cabinet and all related power sources are completely de-energized, locked out, and tagged out to prevent accidental activation.
  2. 2 Mount the IPC: Securely mount the Microbox PC onto a standard DIN rail or a flat panel surface inside the control cabinet. Ensure adequate ventilation space around the unit as specified by the manufacturer for proper heat dissipation.
  3. 3 Establish Ground Connection: Connect the chassis grounding terminal to the main protective earth (PE) busbar of the control cabinet using a low-impedance conductor. A reliable ground connection is critical for safety and noise immunity.
  4. 4 Connect Communication Cables: Connect the PROFIBUS DP and Industrial Ethernet cables. Use appropriately shielded cables and ensure proper shield termination at one end to minimize electromagnetic interference (EMI). Route communication cables separately from high-voltage power lines.
  5. 5 Connect Power Supply: Connect the 24V DC power supply to the designated power input terminals. Verify the polarity is correct before applying power. Use appropriately sized wiring for the load.
  6. 6 System Power-Up: After verifying all connections, remove the lockout/tagout and re-energize the control cabinet. Monitor the IPC for correct boot-up sequence and status indicator activity.

Globaler Expressversand

  • Standardlieferung: 4-6 Werktage per DHL, FedEx und UPS.
  • Expressversand: Versand am selben Tag für vorrätige Bestellungen, die vor 14:00 Uhr (GMT+8) eingehen.
  • Weltweite Abdeckung: Wir beliefern über 150 Länder, einschließlich schneller Lieferung nach Saudi-Arabien und in die VAE.

Rückgaben & Garantie

  • 30-Tage-Garantie: Rückgaben werden für vorrätige Produkte in originaler, werkversiegelter Verpackung akzeptiert.
  • 12-Monats-Garantie: Jede Industriekomponente ist durch unsere professionelle technische Garantie abgesichert.

Bestellungen werden von Montag bis Freitag bearbeitet und geliefert (außer an Feiertagen).


Für vollständige Anspruchsvoraussetzungen, Wiedereinlagerungsgebühren und internationale Rückgabebedingungen lesen Sie bitte unsere offiziellen Rückerstattungs- & Rückgaberecht .

TECHNICAL SPECIFICATIONS

Country of origin
Deutschland

Kürzlich angesehene Produkte

Technisches Wissen

Boolesche Logik in der SPS-Programmierung: Verständnis von FBD-Logikgattern

Die boolesche Logik ist die Grundlage jedes SPS-Programms. Von einfachen Maschinensteuerungen bis hin zu komplexen industriellen Automatisierungssystemen bestimmen Logikgatter, wie Steuerungen auf...

Umfassender Leitfaden zu industriellen Firewalls und OT-Netzwerksegmentierung

Industrielle Firewalls spielen eine entscheidende Rolle in der OT-Cybersicherheit, indem sie PLC-, DCS- und SCADA-Netzwerke durch Segmentierung, Ein- und Ausgangskontrolle sowie IDS/IPS-Integration...

Leitfaden für Roboter-Greifer: Von der schonenden Handhabung bis zur Schwerlastautomatisierung

Moderne robotische Greifer entwickeln sich über traditionelle mechanische Greifbacken hinaus. Von gecko-inspirierten Haftsystemen und weichen, lebensmittelechten Greifern bis hin zu KI-gestützten...

Rückblick: Wie frühe Elektromotoren den Untertagebergbau veränderten

Von seilgetriebenen Gleichstromkompressoren bis hin zu batteriebetriebenen Grubenwagen markierten frühe Bergbauoperationen einen Wendepunkt in der industriellen Elektrifizierung. Dieser Artikel...

Factory I/O: Ein modernes PLC-Simulationswerkzeug für die Ausbildung in der Industrieautomatisierung

Factory I/O revolutioniert die SPS-Ausbildung, indem es immersive 3D-Industriesimulationen für Studenten, Ingenieure und Wartungsteams bereitstellt. Die Plattform überbrückt die Lücke zwischen...

Programmierung von Ein-Achsen-Bewegungszyklen auf einem CMZ-Servoantrieb

Dieses Tutorial untersucht, wie die integrierte SPS-Funktionalität in einem CMZ SBD-Servoantrieb eigenständige Bewegungsprogramme ausführen kann, einschließlich Referenzfahrt-Logik,...