1 of 3

GE Mark VIe IS215WEMAH1A WEMA and BPPS Board Assembly

GE Mark VIe IS215WEMAH1A WEMA and BPPS Board Assembly

Only 2 item(s) left in stock
  • Manufacturer: General Electric

  • Product No.: IS215WEMAH1A

  • Country of origin:ایالات متحده آمریکا

  • Product Type: WEMA and BPPS Board Assembly

  • Barcode: 8537101190

  • Payment: T/T, Western Union

  • Weight: 950g

  • Dimensions: ۲۲ سانتی‌متر طول x ۱۴ سانتی‌متر عرض x ۵ سانتی‌متر ارتفاع

  • Shipping port: Xiamen

  • Warranty: 12 months

Quantity
View full details

Product Overview

The IS215WEMAH1A (IS215-WEMA-H1A) is a highly specialized, mission-critical wind turbine orchestration assembly designed by General Electric for the Mark VIe Wind control platform. Operating as an integrated WEMA and BPPS dual-board architecture, this control element interfaces directly with specialized wind turbine pitch control systems and battery backup backup networks (BPPS/BPPB configurations). Large-scale renewable utility complexes—specifically utility-scale onshore wind farms and highly remote offshore wind matrices—rely on the IS215WEMAH1A to govern live blade positioning and execute deterministic emergency feathering sequences. By consolidating active processing nodes with real-time backup power routing, the assembly maintains system stability under volatile wind loads. This protects critical generator components from catastrophic mechanical overspeed events, ensures constant grid synchronization, and significantly minimizes unprogrammed field down-times.

Architectural Blueprint & Part Designation Suffix Breakdown

The system topography and physical component configurations of the IS215WEMAH1A main assembly are decoded through its strict alphanumeric product numbering matrix.

  • IS215 Framework Prefix: Identifies the hardware as a complex, multi-board composite module type manufactured within domestic facilities, combining the primary WEMA logic card with a closely mated BPPS/BPPB auxiliary options board.

  • WEMA Functional Acronym: Designates the definitive industrial shorthand identifier for the specialized wind turbine pitch and battery monitoring circuit matrix.

  • H1 Protective Classification: Details the hardware status as a Group 1 series assembly featuring full conformal PCB protective coating. This involves a thin, uniform chemical insulation shell wrapped entirely over every track and component surface to guard against severe seaside salt-air and condensation.

  • Functional Revision Suffix "A": Indicates a singular, fully validated initial functional engineering revision level, assuring seamless integration with Cabinet Version A deployment rules.

Structural Parameters & System Indexes

System Parameter Engineering Specification Standard
Model Identity IS215WEMAH1A
Brand Manufacturer GE Energy (General Electric Renewable Division)
Control System Line Speedtronic Mark VIe Wind Turbine Platform
Assembly Definition WEMA and BPPS Integrated Card Assembly
Dedicated Application Wind Turbine Pitch Regulation & Emergency Feathering
Hardware Core Subsystem Combined WEMA Control Board + BPPB Option Board
Enclosure Compatibility Enclosure / Cabinet Version A Assemblies
PCB Environmental Guard Complete Thin-Film Chemically Applied Conformal Coating
Sister Device Variation IS215WEMAH1BA (Alternative Revision Class)
Physical Dimensions 22 cm L x 14 cm W x 5 cm H
Total Hardware Weight 0.95 kg
Operating Ambient Window -30 to +65 deg C Ambient Parameters
Manufacturing Origin United States (USA)

System Lifecycle & Hardware Diagnostic FAQs

Why is it difficult to locate standardized factory documentation for the IS215WEMAH1A assembly on public networks?

The Mark VIe Wind Turbine Control series represents a highly specialized sector engineered directly by GE Energy (General Electric's alternative energy division). Because these boards were distributed almost exclusively inside proprietary wind utility control packages rather than generalized gas turbine systems, documentation is contained within targeted wind-farm specific project manifests rather than standard public industrial manuals.

How does the integrated BPPB options board interact with the primary WEMA card during a utility grid failure?

The BPPB option board acts as the direct intelligence interface to the Battery Energy Storage and Backup Power Protection System (BPPS). If a complete power grid drop occurs, the WEMA logic processes the fault and directs power from the emergency batteries through the BPPB interface to actuate the pitch motors, ensuring the turbine blades feather safely into a parked configuration.

What is the functional difference between the IS215WEMAH1A and its sister device variant, the IS215WEMAH1BA?

The trailing alphanumeric variations represent minor layout updates or component optimization pathways executed during the manufacturing lifespan of the module family. Both models maintain identical application execution profiles and core processing dimensions, allowing the units to serve as direct form-and-fit alternatives within Cabinet Version A setups.


Engineering & Installation Guide

  • Electrostatic Discharge Protection and Handling Protocols:

    The high-density logic tracks on the IS215WEMAH1A are highly vulnerable to static voltage degradation. Retain the card inside its sealed electrostatic shielding bag until the immediate moment of mechanical installation. Field personnel must wear a calibrated grounding static wrist strap bonded to the metal ground structure of Cabinet A. Handle the module strictly by its outer green fiberglass borders to avoid touching delicate surface components.

  • Conformal Coating Inspection and Environmental Parameters:

    While the H1 suffix guarantees full factory conformal coating protection against coastal humidity, salt fog, and ambient condensation, you must ensure that no physical scratches penetrate the chemical shell during assembly insertion. Maintain the ambient cabinet thermal interior within the designated operating window of -30 to +65 deg C, and verify that the passive cooling louvers within the module rack are free of dust buildup.

  • Option Board Alignment and Mounting Fasteners:

    When docking the composite module into the Mark VIe panel framework, ensure that all internal multi-pin logic headers linking the WEMA and BPPB substrates are perfectly straight and properly seated. Torque the exterior faceplate retention screws to a maximum specification of 0.5 N-m (4.4 inch-lbs). Loose terminal seating under continuous low-frequency tower vibration can result in intermittent battery monitoring data loss and generate false emergency trips.

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
چند رنگ
Country of origin
ایالات متحده آمریکا
Power source
برق DC

Recently Viewed Products

Technical knowledge

راهنمای جامع فایروال‌های صنعتی و تقسیم‌بندی شبکه OT

فایروال‌های صنعتی نقش حیاتی در امنیت سایبری OT ایفا می‌کنند و از شبکه‌های PLC، DCS و SCADA از طریق بخش‌بندی، کنترل ورود/خروج و ادغام IDS/IPS مطابق با اصول IEC 62443 محافظت می‌کنند.

راهنمای گیره‌های رباتیک: از جابجایی ظریف تا اتوماسیون سنگین

گیره‌های رباتیک مدرن فراتر از فک‌های مکانیکی سنتی در حال پیشرفت هستند. از سیستم‌های چسبنده الهام‌گرفته از گکوی، گیره‌های نرم با درجه‌بندی غذایی تا ابزارهای انبار مجهز به هوش مصنوعی، فناوری‌های...

بازگشت به گذشته: چگونه موتورهای الکتریکی اولیه معدن‌کاری زیرزمینی را تغییر دادند

از کمپرسورهای جریان مستقیم با نیروی طناب تا واگن‌های معدنی باتری‌دار، عملیات‌های اولیه معدن‌کاری نقطه عطفی در برق‌رسانی صنعتی بودند. این مقاله بررسی می‌کند که چگونه موتورهای الکتریکی پیش از ورود...

Factory I/O: یک ابزار شبیه‌سازی PLC مدرن برای آموزش اتوماسیون صنعتی

Factory I/O آموزش PLC را با ارائه شبیه‌سازی‌های صنعتی سه‌بعدی فراگیر برای دانشجویان، مهندسان و تیم‌های نگهداری متحول می‌کند. این پلتفرم فاصله بین نظریه و عمل واقعی اتوماسیون را پر می‌کند و در عین حال...

برنامه‌نویسی چرخه‌های حرکت تک‌محور روی درایو سروو CMZ

این آموزش بررسی می‌کند که چگونه عملکرد PLC داخلی درایو سروو CMZ SBD می‌تواند برنامه‌های حرکتی مستقل را اجرا کند، از جمله منطق خانه‌یابی، کنترل موقعیت و حرکت دوره‌ای محور بدون نیاز به PLC خارجی.

راه‌اندازی کنترل حرکت تک‌محور با درایوهای سروو CMZ

این آموزش به راه‌اندازی سیستم حرکت سروو تک‌محوره با استفاده از درایو CMZ SBD می‌پردازد و شامل تنظیمات سخت‌افزاری، مقیاس‌بندی محور، پیکربندی موقعیت‌یابی اولیه و تأیید حرکت ایمن برای محیط‌های اتوماسیون...