1 dari 1

Siemens 6ES7647-6AB25-0CJ0 SIMATIC BOX PC 627 Industrial PC

Siemens 6ES7647-6AB25-0CJ0 SIMATIC BOX PC 627 Industrial PC

Hanya 5 item tersisa di stok
  • Produsen: Siemens

  • Nomor Produk: 6ES7647-6AB25-0CJ0

  • Negara asal:Jerman

  • Jenis Produk: Industrial PC

  • Kode batang: 85371091

  • Pembayaran: T/T, Western Union

  • Berat: 7050g

  • Dimensi: 92.0 x 21.0 x 14.0 cm

  • Pelabuhan pengiriman: Xiamen

  • Garansi: 12 bulan

Kuantitas
Lihat detail lengkap

Description

This product is a Siemens 6ES7647-6AB25-0CJ0, a SIMATIC BOX PC 627 designed for industrial applications. It is equipped with a Celeron M 370 1.5 GHz processor, 512 MB of DDR2 RAM, and an 80 GB SATA hard drive. Connectivity options include dual 10/100 Mbit/s Ethernet, four high-current USB 2.0 ports, a serial port, and an integrated PROFIBUS/MPI interface. The system features onboard AGP graphics, a RAID controller, and monitoring functions for temperature and fan status. This unit is powered by a 24V DC industrial power supply and comes pre-installed with Windows 2000 Professional.

Features

  • Celeron M 370 processor operating at 1.5 GHz with a 400 MHz FSB.
  • 512 MB DDR2 533 SODIMM system memory.
  • Integrated AGP graphics with 8-128 MB of shared memory.
  • 80 GB SATA Hard Disk Drive and a DVD+/-RW optical drive.
  • Dual 10/100 Mbit/s Ethernet RJ45 ports for network connectivity.
  • Built-in PROFIBUS/MPI interface for industrial communication.
  • Onboard RAID controller for data redundancy.
  • System monitoring including watchdog timer, temperature, and fan status.
  • Two available PCI slots for expansion.

Applications

  • Human-Machine Interface (HMI) and SCADA systems.
  • Data acquisition and logging in manufacturing environments.
  • PC-based control and automation tasks.
  • Gateway for industrial network communications.
  • Process visualization and monitoring stations.

Technical Specifications

Specification Value
Product Type SIMATIC BOX PC 627
Processor Celeron M 370, 1.5 GHz, 400 MHz FSB, 1 MB SLC
Memory 512 MB DDR2 533 SODIMM
Graphics AGP Onboard, 8-128 MB Shared Memory
Storage 80 GB HDD SATA, DVD+/-RW
Removable Media 1x Slot for Compact Flash Drive
Expansion Slots 2x PCI (free)
Interfaces 2x 10/100 Mbit/s Ethernet (RJ45), 4x USB V2.0 (High Current), 1x Serial (COM1), 1x PROFIBUS/MPI
Power Supply 24V DC Industrial Power Supply
Operating System Windows 2000 Professional Multi-Language SP4 (EN, GE, FR, IT, SP)
System Monitoring Watchdog, Temperature/Fan Monitoring
PLM Product Phase Obsolete
Manufacturer Siemens
Country of Origin Germany (Estimate)
Shipping Weight 7.05 kg
Package Dimensions (Calculated) 92.0 x 21.0 x 14.0 cm

Installation Guidelines

CRITICAL WARNING: Hazardous voltages may be present. Installation must be performed by qualified personnel only. Failure to de-energize equipment before installation can result in severe injury or death. Always adhere to local Lockout-Tagout (LOTO) procedures.
  1. 1
    De-energize Equipment: Before installation, completely de-energize the control cabinet and verify the absence of voltage using a calibrated multimeter. Follow all site-specific LOTO safety procedures.
  2. 2
    Mount the Chassis: Securely mount the BOX PC chassis to the designated panel or mounting surface. Ensure adequate clearance around the unit for proper ventilation and heat dissipation.
  3. 3
    Connect System Ground: Connect a dedicated protective earth (PE) conductor to the chassis ground terminal. A low-impedance ground connection is critical for safety and noise immunity.
  4. 4
    Connect Power Supply: Connect the 24V DC power source to the designated power input terminals. Verify correct polarity (+/-) before applying power to prevent damage to the unit.
  5. 5
    Terminate I/O and Network Cables: Connect all required communication cables, such as Ethernet, PROFIBUS, USB, and serial devices. Ensure all connectors are fully seated and secured.
  6. 6
    System Power-Up: After verifying all connections, remove the LOTO device and re-energize the cabinet. Power on the BOX PC and verify correct boot-up and system operation.

Pengiriman Ekspres Global

  • Pengiriman Standar: 4-6 Hari Kerja melalui DHL, FedEx, dan UPS.
  • Pengiriman Ekspres: Pengiriman hari yang sama untuk pesanan dalam stok yang dilakukan sebelum pukul 2:00 PM (GMT+8).
  • Cakupan Seluruh Dunia: Melayani lebih dari 150 negara, termasuk pengiriman cepat ke Arab Saudi dan UAE.

Pengembalian & Garansi

  • Jaminan 30 Hari: Pengembalian diterima untuk produk yang tersedia dalam stok dengan kemasan asli yang tersegel pabrik.
  • Garansi 12 Bulan: Setiap komponen industri didukung oleh garansi teknis profesional kami.

Pesanan diproses dan dikirimkan Senin-Jumat (tidak termasuk hari libur nasional).


Untuk kelayakan penuh, biaya pengisian kembali, dan detail pengembalian internasional, silakan lihat resmi kami Kebijakan Pengembalian & Pengembalian Dana .

TECHNICAL SPECIFICATIONS

Country of origin
Jerman

Produk yang Baru Dilihat

Pengetahuan teknis

Logika Boolean dalam Pemrograman PLC: Memahami Gerbang Logika FBD

Logika Boolean adalah dasar dari setiap program PLC. Dari kontrol mesin sederhana hingga sistem otomasi industri yang kompleks, gerbang logika menentukan bagaimana pengendali merespons perubahan...

Panduan Mendalam tentang Firewall Industri dan Segmentasi Jaringan OT

Firewall industri memainkan peran penting dalam keamanan siber OT, melindungi jaringan PLC, DCS, dan SCADA melalui segmentasi, kontrol masuk/keluar, dan integrasi IDS/IPS yang sesuai dengan prinsip...

Panduan Gripper Robotik: Dari Penanganan Halus hingga Otomasi Berat

Gripper robot modern berkembang melampaui rahang mekanis tradisional. Dari sistem perekat yang terinspirasi oleh tokek dan gripper lembut yang aman untuk makanan hingga alat gudang bertenaga AI,...

Throwback: Bagaimana Motor Listrik Awal Mengubah Pertambangan Bawah Tanah

Dari kompresor DC yang digerakkan tali hingga gerobak tambang bertenaga baterai, operasi pertambangan awal menandai titik balik dalam elektrifikasi industri. Artikel ini mengeksplorasi bagaimana...

Factory I/O: Alat Simulasi PLC Modern untuk Pelatihan Otomasi Industri

Factory I/O mengubah pendidikan PLC dengan menyediakan simulasi industri 3D yang imersif untuk siswa, insinyur, dan tim pemeliharaan. Platform ini menjembatani kesenjangan antara teori dan praktik...

Pemrograman Siklus Gerakan Sumbu Tunggal pada CMZ Servo Drive

Tutorial ini membahas bagaimana fungsi PLC onboard di dalam drive servo CMZ SBD dapat menjalankan program gerakan mandiri, termasuk logika homing, kontrol posisi, dan pergerakan sumbu siklik tanpa...