1 dari 1

Siemens 6ES7647-6CH30-0BX0 SIMATIC IPC627C Box PC

Siemens 6ES7647-6CH30-0BX0 SIMATIC IPC627C Box PC

Hanya 3 item tersisa di stok
  • Produsen: Siemens

  • Nomor Produk: 6ES7647-6CH30-0BX0

  • Negara asal:Jerman

  • Jenis Produk: Industrial Box PC

  • Kode batang: 85371091

  • Pembayaran: T/T, Western Union

  • Berat: 7g

  • Dimensi: 120.5 x 50.5 x 10.0 cm

  • Pelabuhan pengiriman: Xiamen

  • Garansi: 12 bulan

Kuantitas
Lihat detail lengkap

Description

This is a Siemens 6ES7647-6CH30-0BX0, a SIMATIC IPC627C series Box PC designed for demanding machine-level control, data acquisition, and visualization tasks. This configuration is powered by an Intel Core i7-610E processor and is equipped with 4 GB of DDR3 RAM, a 250 GB SATA HDD, and an integrated PROFIBUS/MPI interface. The unit features robust onboard monitoring for temperature and fan status, along with a watchdog timer to ensure high system availability in industrial environments. It is delivered without a pre-installed operating system, providing flexibility for custom software deployment.

Features

  • Powered by an Intel Core i7-610E dual-core processor with Hyper-Threading.
  • Integrated HD graphics controller onboard.
  • Dual 10/100/1000 Mbit/s Ethernet ports for network connectivity.
  • Onboard PROFIBUS/MPI interface (CP 5611-A2 compatible).
  • Four high-current USB 2.0 ports and one serial (COM1) port.
  • Built-in RAID controller for data redundancy.
  • Features watchdog timer and hardware monitoring for temperature and fan speed.
  • Includes 2 MB of buffered SRAM for non-volatile data storage.
  • Equipped with two free PCI slots for expansion cards.

Applications

  • Human-Machine Interface (HMI) and SCADA systems
  • Process control and data logging
  • Machine vision and quality inspection systems
  • Industrial data gateways and communication servers
  • Motion control and robotics applications

Technical Specifications

Specification Value
Manufacturer Siemens
Product Series SIMATIC IPC627C
Model Number 6ES7647-6CH30-0BX0
Processor Intel Core i7-610E (2 Cores, 4 Threads, 2.53 GHz, 4 MB Cache)
Memory (RAM) 4 GB DDR3 1066 DIMM
Buffered SRAM 2 MB
Storage 250 GB HDD SATA
Optical Drive DVD +/-RW
Removable Media CompactFlash Drive Slot (Front)
Ethernet Ports 2 x 10/100/1000 Mbit/s Ethernet RJ45
USB Ports 4 x USB 2.0 (High Current)
Serial Port 1 x Serial (COM 1)
Fieldbus Interface PROFIBUS/MPI (CP 5611-A2 compatible)
Expansion Slots 2 x PCI
Power Supply AC 110/230V Industrial Power Supply Unit with NAMUR
Power Cable Europe
Operating System Not included
Product Lifecycle Status Phase-Out
Shipping Weight 7.00 kg
Package Dimensions (Calculated) 120.5 x 50.5 x 10.0 cm
Country of Origin Germany (Estimated)

Installation Guidelines

CRITICAL WARNING: RISK OF ELECTRIC SHOCK AND EQUIPMENT DAMAGE

Installation must be performed by qualified personnel only. Disconnect and lock out all power sources before mounting or servicing. Failure to properly ground the chassis can result in electrical noise, operational instability, or a safety hazard. Always use appropriate electrostatic discharge (ESD) protection when handling the unit.

  1. 1
    De-energize Equipment: Before installation, completely de-energize the control cabinet. Apply lock-out/tag-out (LOTO) procedures to the main power disconnect to prevent accidental startup.
  2. 2
    Verify Clearances: Select a mounting location that provides adequate ventilation clearance around the PC's fans and vents to ensure proper heat dissipation. Avoid locations with high ambient temperatures or heavy vibration.
  3. 3
    Mount the Chassis: Securely fasten the Box PC chassis to the mounting plate or panel using all provided mounting points. Ensure the unit is level and stable.
  4. 4
    Connect Protective Earth (PE): Connect the chassis PE terminal to the main cabinet ground bus using a low-impedance conductor. This is the most critical connection for safety and noise immunity.
  5. 5
    Connect Cables: Connect the AC power supply, Ethernet, PROFIBUS, USB, and any other peripheral cables. Ensure all connectors are fully seated and secured. Route cables to prevent strain and interference.
  6. 6
    Power On and Verify: After verifying all connections, remove the LOTO device and re-apply power to the cabinet. Observe the PC's status LEDs to confirm a successful boot sequence.

Pengiriman Ekspres Global

  • Pengiriman Standar: 4-6 Hari Kerja melalui DHL, FedEx, dan UPS.
  • Pengiriman Ekspres: Pengiriman hari yang sama untuk pesanan dalam stok yang dilakukan sebelum pukul 2:00 PM (GMT+8).
  • Cakupan Seluruh Dunia: Melayani lebih dari 150 negara, termasuk pengiriman cepat ke Arab Saudi dan UAE.

Pengembalian & Garansi

  • Jaminan 30 Hari: Pengembalian diterima untuk produk yang tersedia dalam stok dengan kemasan asli yang tersegel pabrik.
  • Garansi 12 Bulan: Setiap komponen industri didukung oleh garansi teknis profesional kami.

Pesanan diproses dan dikirimkan Senin-Jumat (tidak termasuk hari libur nasional).


Untuk kelayakan penuh, biaya pengisian kembali, dan detail pengembalian internasional, silakan lihat resmi kami Kebijakan Pengembalian & Pengembalian Dana .

TECHNICAL SPECIFICATIONS

Country of origin
Jerman

Produk yang Baru Dilihat

Pengetahuan teknis

Panduan Gripper Robotik: Dari Penanganan Halus hingga Otomasi Berat

Gripper robot modern berkembang melampaui rahang mekanis tradisional. Dari sistem perekat yang terinspirasi oleh tokek dan gripper lembut yang aman untuk makanan hingga alat gudang bertenaga AI,...

Throwback: Bagaimana Motor Listrik Awal Mengubah Pertambangan Bawah Tanah

Dari kompresor DC yang digerakkan tali hingga gerobak tambang bertenaga baterai, operasi pertambangan awal menandai titik balik dalam elektrifikasi industri. Artikel ini mengeksplorasi bagaimana...

Factory I/O: Alat Simulasi PLC Modern untuk Pelatihan Otomasi Industri

Factory I/O mengubah pendidikan PLC dengan menyediakan simulasi industri 3D yang imersif untuk siswa, insinyur, dan tim pemeliharaan. Platform ini menjembatani kesenjangan antara teori dan praktik...

Pemrograman Siklus Gerakan Sumbu Tunggal pada CMZ Servo Drive

Tutorial ini membahas bagaimana fungsi PLC onboard di dalam drive servo CMZ SBD dapat menjalankan program gerakan mandiri, termasuk logika homing, kontrol posisi, dan pergerakan sumbu siklik tanpa...

Pengaturan Kontrol Gerak Sumbu Tunggal dengan CMZ Servo Drive

Tutorial ini membahas pengoperasian sistem gerak servo satu sumbu menggunakan drive CMZ SBD, meliputi pengaturan perangkat keras, penskalaan sumbu, konfigurasi homing, dan verifikasi gerakan aman...

Integrasi Mitsubishi FX PLC dengan FR-D700 VFD dan Kontrol HMI

Tutorial ini menjelaskan bagaimana PLC Mitsubishi FX terintegrasi dengan VFD FR-D700 dan panel HMI untuk kontrol motor maju/mundur. Tutorial ini mencakup logika pengkabelan, konfigurasi parameter,...