1 daripada 1

Omron CJ2H-CPU67 CJ2 Series PLC CPU Module

Omron CJ2H-CPU67 CJ2 Series PLC CPU Module

Hanya 2 item tinggal dalam stok
  • Pengilang: Omron

  • No. Produk: CJ2H-CPU67

  • Negara asal:Jepun

  • Jenis Produk: PLC CPU Modules

  • Pembayaran: T/T, Western Union

  • Berat: 200g

  • Dimensi: 6.5 cm x 4.9 cm x 9.0 cm

  • Pelabuhan penghantaran: Xiamen

  • Jaminan: 12 bulan

Kuantiti
Lihat butiran penuh

Description

Providing advanced processing power and enhanced system responsiveness, the Omron CJ2H-CPU67 serves as the primary processing engine for demanding industrial automation setups within the CJ2 Series. This module features a user program capacity of 250K steps alongside an overhead processing speed of just 100 microseconds, ensuring exceptionally fast execution of both basic and specialized instructions. Designed for seamless mounting inside a control panel, this unit optimizes CPU throughput for synchronized multi-axis control, high-speed sorting, and intensive data processing tasks without sacrificing field reliability.

Key Features

  • Ultra-Fast Execution: Processes basic instructions at 0.016 microseconds minimum and special instructions at 0.048 microseconds minimum.
  • Expansive Logic Capacity: Accommodates complex sequences with up to 250K steps of user memory and 2560 I/O bits.
  • Modular Programming Support: Allows up to 2048 function block definitions and 2048 active instances for structured code reusability.
  • Extended Memory Architecture: Supports force-setting and resetting across EM Area Banks 0 through E hex (automatic allocation on Banks 7 through E hex).
  • Flexible Data Storage: Built-in flash card slot compatible with 128 MB, 256 MB, and 512 MB memory cards for diagnostic log preservation and program backup.

Typical Applications

  • High-speed packaging, labeling, and filling machinery.
  • Multi-axis coordinated motion control and robotic integration.
  • Complex manufacturing assembly lines requiring rapid diagnostic scanning.
  • Centralized PLC configurations with dense digital and analog I/O architectures.

Technical Specifications

Parameter Value
Manufacturer Omron
Model CJ2H-CPU67
Series CJ2 Family
Product Type Programmable Logic Controller CPU
User Program Memory 250K steps
I/O Capacity 2560 bits
Basic Instruction Execution Time 0.016 microseconds minimum
Special Instruction Execution Time 0.048 microseconds minimum
Overhead Processing Time 100 microseconds
Current Consumption 0.42 A at 5 VDC
Grounding Requirements Less than 100 ohms
Supported Memory Cards 128 MB, 256 MB, or 512 MB
Mounting Environment Enclosed control panel mount
Device Dimensions (L x W x H) 6.5 cm x 4.9 cm x 9.0 cm
Net Unit Weight 0.2 kg
Shipping Weight (Calculated) 2.0 kg

Serial Port Communication Protocols

Interface Property Specification
Communication Method Half-duplex
Synchronization Method Start-stop (asynchronous)
Supported Baud Rates (kbps) 0.3, 0.6, 1.2, 2.4, 4.8, 9.6, 19.2, 38.4, 57.6, 115.2
Maximum Cable Distance 15 meters maximum

Empirical Engineering Insights

Alternative Models & Compatibility

The CJ2H-CPU67 serves as a high-performance, drop-in successor to older legacy processors such as the CJ1H and CJ1M series. However, programs utilizing the extended EM memory banks (specifically Banks 7 through E hex) must be compiled with CX-Programmer version 8.02 or higher to prevent register conflicts. Ensure your current expansion racks are compatible with the enhanced backplane bus speed of the CJ2H platform before commissioning.

Application Pitfalls & Engineering Notes

When designing massive logic schemes that utilize the maximum 250K steps, developers must monitor the 128 cyclic task flags carefully. Exceeding this boundary limit or failing to optimize the 100-microsecond CPU overhead processing window can cause unexpected watchdog timeouts during high-density cyclic tasks. Keep task periods balanced to avoid logic execution jitter.

Commissioning & Wiring Tips

To protect the highly sensitive 5 VDC, 0.42 A processor circuitry from electrical transients, maintain a strict single-point functional ground of less than 100 ohms. Avoid running RS-232C serial lines alongside high-voltage motor power leads. For industrial serial setups running near the 15-meter maximum distance limit, ensure high-quality double-shielded twisted-pair cabling is deployed with ground connections strictly terminated on the rack end.

Installation Guidelines

CRITICAL WARNING

Disconnect all primary AC and auxiliary DC power sources before mounting or dismounting the CPU module from the backplane. Hot-swapping the CJ2H-CPU67 under active system power will permanently damage the internal logical bus and invalidate the product warranty.

1

Ensure the rack mounting track is clean, level, and properly secured inside a dry, NEMA-rated or IP54-compliant control cabinet.

2

Carefully align the backplane connectors of the CJ2H-CPU67 with the main power supply module slot, and push firmly until the unit locks into place.

3

Terminate the functional ground terminal to a solid earth ground of less than 100 ohms using a copper wire with a cross-section of at least 2 mm squared.

4

Insert the memory card (if required) and secure any serial communication cabling before applying power to the rack.

Loading product navigation…

What is the basic execution speed of the CJ2H-CPU67?

The CPU processes basic program instructions at a minimum speed of 0.016 microseconds, and special instructions at a minimum speed of 0.048 microseconds.

What is the user memory capacity of this PLC module?

It provides 250K steps of user program memory to accommodate comprehensive, complex industrial processes and applications.

Does the CJ2H-CPU67 require a dedicated ground connection?

Yes. For maximum noise immunity and protection against transients, it must be connected to a functional ground with a resistance of less than 100 ohms.

What memory card capacities are supported for external logging?

This module is compatible with system flash memory cards in capacities of 128 MB, 256 MB, or 512 MB.

Penghantaran Ekspres Global

  • Penghantaran Standard: 4-6 Hari Perniagaan melalui DHL, FedEx, dan UPS.
  • Penghantaran Ekspres: Penghantaran pada hari yang sama untuk pesanan dalam stok yang dibuat sebelum 2:00 PM (GMT+8).
  • Liputan Seluruh Dunia: Berkhidmat di lebih 150 negara, termasuk penghantaran pantas ke Arab Saudi dan UAE.

Pemulangan & Jaminan

  • Jaminan 30 Hari: Pemulangan diterima untuk produk dalam stok dalam pembungkusan asal yang disegel kilang.
  • Jaminan 12 Bulan: Setiap komponen industri disokong oleh jaminan teknikal profesional kami.

Pesanan diproses dan dihantar Isnin-Jumaat (tidak termasuk cuti umum).


Untuk kelayakan penuh, yuran penyimpanan semula, dan butiran pemulangan antarabangsa, sila lihat rasmi kami Polisi Pemulangan & Bayaran Balik .

TECHNICAL SPECIFICATIONS

Country of origin
Jepun

Produk yang Baru Dilihat

Pengetahuan teknikal

Logik Boolean Lanjutan dengan Pengaturcaraan PLC FBD: Aplikasi Industri Praktikal Melebihi Logik Asas

Artikel ini menerangkan beberapa fungsi logik Boolean lanjutan yang digunakan dalam pengaturcaraan PLC selain operasi asas AND, OR, dan NOT. Ia merangkumi bagaimana alat seperti jadual kebenaran,...

Logik Boolean dalam Pengaturcaraan PLC: Memahami Pintu Logik FBD

Logik Boolean adalah asas bagi setiap program PLC. Dari kawalan mesin yang mudah hingga sistem automasi industri yang kompleks, pintu logik menentukan bagaimana pengawal bertindak balas terhadap...

Panduan Mendalam tentang Firewall Industri dan Segmentasi Rangkaian OT

Firewall industri memainkan peranan penting dalam keselamatan siber OT, melindungi rangkaian PLC, DCS, dan SCADA melalui segmentasi, kawalan masuk/keluar, dan integrasi IDS/IPS yang selaras dengan...

Panduan Pengapit Robotik: Dari Pengendalian Halus ke Automasi Tugas Berat

Pengapit robotik moden sedang berkembang melebihi rahang mekanikal tradisional. Daripada sistem pelekat yang diinspirasikan oleh cicak dan pengapit lembut gred makanan hingga alat gudang yang...

Throwback: Bagaimana Motor Elektrik Awal Mengubah Perlombongan Bawah Tanah

Dari pemampat DC yang digerakkan tali ke troli lombong bertenaga bateri, operasi perlombongan awal menandakan titik perubahan dalam elektrifikasi industri. Artikel ini meneroka bagaimana motor...

Factory I/O: Alat Simulasi PLC Moden untuk Latihan Automasi Industri

Factory I/O sedang mengubah pendidikan PLC dengan menyediakan simulasi industri 3D yang mendalam untuk pelajar, jurutera, dan pasukan penyelenggaraan. Platform ini merapatkan jurang antara teori dan...