BECKHOFF

Beckhoff EL3423 EtherCAT Terminal

SKU EL3423

In stock
  • 12-month warranty
  • Free returns within 30 days
  • Manufacturer: BECKHOFF

  • Product No.: EL3423

  • Country of origin:Germany

  • Product Type: EtherCAT Terminal

  • Payment: T/T, Western Union

  • Weight: 2000g

  • Dimensions: 12 mm x 100 mm x 68 mm

  • Shipping port: Xiamen

  • Warranty: 12 months

Product Overview

The Beckhoff EL3423 is a sophisticated 3-phase power measurement terminal designed for detailed energy and power quality analysis. Unlike standard analog input terminals that simply report voltage or current levels, the EL3423 performs complex calculations internally, providing processed values like active/reactive power, energy consumption, and power factor directly via the EtherCAT network. It is an ideal solution for monitoring industrial machinery, electrical distribution cabinets, and grid-connected systems where efficiency, load management, and electrical health are paramount.

Technical Configuration

The EL3423 acts as an intelligent measurement node, offloading the heavy math required for power analysis from the PLC.

  • 3-Phase Measurement: Features 3 current and 3 voltage measurement channels, allowing it to monitor balanced and unbalanced 3-phase systems up to 480 V AC.
  • Integrated Analysis: Provides real-time data on power quality factors, phase asymmetry, and phase order, enabling early detection of grid-side issues or motor-side faults.
  • Galvanic Isolation: With 2500 V isolation, the terminal provides excellent protection for your control system against voltage spikes on the power grid.
  • Flexible Wiring: The terminal supports standard 35 mm DIN rail mounting and utilizes spring-loaded terminals, facilitating secure and vibration-resistant installation in compact cabinet spaces.

Technical Specifications

Feature Specification
Model EL3423
Measurement Type 3-Phase Energy/Power
Voltage Range Max. 480 V AC
Current Range Max. 1 A AC/DC
Measuring Error 0.5% (U/I), 1% (Calculated values)
Electrical Isolation 2500 V
Mounting 35 mm DIN Rail
Dimensions 12 x 100 x 68 mm
Protection Rating IP20

Frequently Asked Questions

Does the terminal measure current directly?

No. The current measurement inputs are designed for a maximum of 1 A. You must use external current transformers (CTs) with a secondary output of 1 A to scale down your line current to a level suitable for the terminal.

What is the "power quality factor" measuring?

The power quality factor helps you understand how efficiently your load is consuming power. It monitors parameters like the power factor ($\cos\phi$) and harmonic distortion. A drop in these values can indicate issues with connected motors, power supplies, or the grid itself.

Can this be used for single-phase measurement?

Yes, the terminal supports optional single-phase operation, allowing it to be used for simpler energy monitoring tasks if a 3-phase connection is not required.

Engineering Integration and Operational Best Practices

  • Safety First: Because this terminal is directly connected to line-side voltages (up to 480 V), always ensure that appropriate fuses or circuit breakers are installed on the voltage measurement lines to protect the terminal and the control cabinet.
  • Wiring Correctness: Ensure the phase order (L1, L2, L3) is maintained across both voltage and current inputs. Incorrect phase mapping will lead to inaccurate power and energy calculations.
  • CT Sizing: When selecting your external current transformers, ensure the accuracy class is sufficient for your application. The terminal’s measurement error is 0.5%, so using low-accuracy CTs will degrade the overall system performance.
  • Data Refresh: Since the update interval is > 10 s (net-synchronous), this terminal is intended for monitoring operational energy usage rather than high-speed transients. It is perfect for logging energy consumption and identifying long-term load trends.
Quantity
Shipping & Returns

Global Express Shipping

  • Standard Delivery: 4–6 business days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our technical warranty.
Reviews
1 of 1
Only 10 item(s) left in stock
Quantity
View full details

Global Express Shipping

  • Standard Delivery: 4-6 Business Days via DHL, FedEx, and UPS.
  • Express Dispatch: Same-day dispatch for in-stock orders placed before 2:00 PM (GMT+8).
  • Worldwide Coverage: Serving over 150 countries, including rapid delivery to Saudi Arabia and UAE.

Returns & Warranty

  • 30-Day Guarantee: Returns accepted for in-stock products in original, factory-sealed packaging.
  • 12-Month Warranty: Every industrial component is backed by our professional technical warranty.

Orders are processed and delivered Monday-Friday (excluding public holidays).


For full eligibility, restocking fees, and international return details, please view our official Refund & Return Policy .

TECHNICAL SPECIFICATIONS

Color pattern
Greyish White
Country of origin
Germany

Technical knowledge

Moving TwinCAT 3 Licenses with C9900-L100: Build and Device Checks

Before moving a TwinCAT 3 license with a Beckhoff C9900-L100, verify the TwinCAT build, XML device description, exact order code and cabinet limits.

Replacing a Beckhoff EL4032: Wiring and Output Checks

A field checklist for replacing a Beckhoff EL4032, covering the ±10 V load, terminal map, power contacts, EtherCAT state, and watchdog behavior.

Replacing Yokogawa AAI835: Wiring and Barrier Checks Before Swap

Before replacing a Yokogawa AAI835, verify the 4-in/4-out channel map, power-loss loop behavior, barrier type, output load, cable, and redundancy.

ABB PM891K01 Replacement: Check Redundancy Before Ordering

ABB PM891K01 article 3BSE053241R1 is the non-redundant AC 800M processor kit. Use this field checklist before replacement.

ABB TP853 Replacement Checks for CI853/CI855/CI857/CI861

Replacement checks for ABB TP853 3BSE018126R1: identify the installed CI853, CI855, CI857, or CI861 interface, record wiring, and verify communication after installation.

5069-L330ERMS2 Startup Checks: RTBs, I/O, and Motion Limits

Engineering checks for the Allen-Bradley 5069-L330ERMS2: controller capacity, separate RTB kits, local I/O limits, network-node limits, and motion-axis count.