Description
The Siemens 6AV3627-5BB00-0AE0 is an OP27 STN Color Operator Panel from the SIMATIC HMI range. This unit features a customer-specific design (Version B) and is delivered with a standard front, making it suitable for human-machine interface applications in industrial automation environments. It provides visual feedback and control capabilities, facilitating interaction with machinery and processes.
Features
- STN Color display technology
- Customer-specific design (Version B)
- Delivered with standard front
- Part of the Siemens SIMATIC HMI product range
Applications
The Siemens OP27 STN Color Operator Panel is typically deployed in various industrial settings requiring local control and visualization. Common applications include:
- Machine operation and monitoring
- Process control and data display
- Factory automation systems
- Building management systems
- Material handling and logistics
Technical Specifications
| Parameter |
Value |
| Manufacturer |
Siemens |
| Range |
SIMATIC HMI |
| Type of product |
Operator panels |
| PLM Product phase |
Obsolete |
| Package Dimensions (Calculated) |
59.00 x 39.00 x 23.00 cm |
| Shipping Weight |
1.80 kg |
| Commodity Code |
85371091 |
| Export Control Regulations (ECCN) |
N |
Installation Guidelines
Proper installation ensures reliable operation and longevity of the operator panel. Adhere to the following general guidelines:
-
De-energize System: Before beginning any installation or maintenance, ensure all power to the control system and the panel's mounting location is disconnected and locked out.
-
Mounting: Securely mount the operator panel into a prepared cutout in a control cabinet or console. Ensure adequate space for ventilation and cable routing behind the panel.
-
Environmental Considerations: Install the panel in an environment that meets the specified operating temperature and humidity ranges. Protect it from excessive dust, moisture, and direct sunlight.
-
Power Connection: Connect the panel to a stable and correctly rated power supply. Verify polarity and ensure proper grounding to prevent electrical noise and potential hazards.
-
Communication Wiring: Route communication cables (e.g., for PLC connection) away from power cables to minimize electromagnetic interference. Use shielded cables where recommended and ensure shields are properly terminated.
-
Initial Power-Up: After installation, carefully re-energize the system. Observe the panel for proper startup and functionality.