Description
The Siemens 6AV7875-0BE52-0AC0 is a SIMATIC Panel PC 677B designed for industrial human-machine interface (HMI) and control applications. This unit features a 19-inch touch display with a 1280x1024 resolution, powered by an Intel Core 2 Duo T7400 processor running at 2.16 GHz. It is equipped with 4 GB of DDR2 RAM and a redundant storage system consisting of two 250 GB SATA hard drives configured in a RAID1 array. Connectivity options include dual Gigabit Ethernet, four USB 2.0 ports, a serial port, and an integrated PROFIBUS/MPI interface. The system is pre-installed with Windows XP Professional MUI and is powered by a 110/230 V AC supply.
Features
- 19-inch color touch display with 1280 x 1024 pixel resolution
- Intel Core 2 Duo T7400 processor (2.16 GHz)
- 4 GB DDR2 system memory
- Redundant storage with two 250 GB SATA hard drives in a RAID1 configuration
- Dual 10/100/1000 Mbit/s Ethernet ports for network connectivity
- Integrated PROFIBUS/MPI interface for field-level communication
- Front-panel USB port for convenient data transfer and peripheral connection
- Pre-installed with Windows XP Professional Multi-User Interface (MUI)
- Two available PCI slots for hardware expansion
Applications
- Machine-level control and visualization
- Process monitoring and data acquisition (SCADA)
- Manufacturing Execution Systems (MES) terminals
- Industrial data logging and analysis
- Automation control panels in manufacturing and process industries
Technical Specifications
| Category |
Specification |
| General |
|
| Brand |
Siemens |
| Model |
6AV7875-0BE52-0AC0 |
| Series |
SIMATIC Panel PC 677B |
| Product Type |
Panel PC |
| Product Lifecycle Status |
Obsolete |
| Processor & Memory |
|
| CPU |
Intel Core 2 Duo T7400 |
| CPU Clock Speed |
2.16 GHz |
| Cache |
4 MB SLC |
| RAM |
4 GB DDR2 |
| Buffered SRAM |
2 MB |
| Display |
|
| Type |
Touch Screen |
| Size |
19 inch |
| Resolution |
1280 x 1024 pixels |
| Storage |
|
| Configuration |
RAID1 (2x Hard Drives) |
| Total Capacity |
2x 250 GB |
| Interface |
SATA |
| Form Factor |
2.5 inch |
| Optical Drive |
Not included |
| Interfaces & Expansion |
|
| Ethernet |
2x 10/100/1000 Mbit/s |
| USB |
4x USB 2.0 (plus one front-side port) |
| Serial |
1x COM1 |
| Fieldbus |
PROFIBUS/MPI |
| Expansion Slots |
2x PCI |
| Power Supply |
|
| Input Voltage |
110/230 V AC |
| Standards |
NAMUR |
| Power Cable |
Europe type included |
| Software |
|
| Operating System |
Windows XP Professional MUI |
| Installed Languages |
German, English, French, Spanish, Italian, Japanese, Chinese, Korean |
| Logistics |
|
| Shipping Weight |
17.00 kg |
| Package Dimensions |
67.0 x 83.0 x 11.5 cm |
| Commodity Code |
85371098 |
| ECCN |
N (Not subject to EAR) |
| Country of Origin |
Germany (Estimate) |
Installation Guidelines
CRITICAL WARNING: Hazardous voltages are present. Installation must be performed by qualified personnel only. Failure to follow safety procedures can result in severe injury or death. Always de-energize and apply Lockout/Tagout (LOTO) procedures before accessing equipment.
-
1
De-energize the main control cabinet and verify the absence of voltage using a calibrated meter. Apply appropriate Lockout/Tagout (LOTO) devices.
-
2
Prepare the panel cutout according to the manufacturer's dimensional drawings. Ensure the mounting surface is clean, flat, and free of debris.
-
3
Insert the Panel PC into the cutout and secure it evenly using all provided mounting clamps. Do not overtighten the clamps, as this can deform the bezel.
-
4
Connect the Protective Earth (PE) or chassis ground terminal to the cabinet's main ground bus using a low-impedance conductor. This connection must be made first.
-
5
Connect the 110/230 V AC power supply cable to a properly rated and protected circuit. Ensure the cable is secured to prevent accidental disconnection.
-
6
Connect all required communication and peripheral cables, including Ethernet, PROFIBUS/MPI, USB, and serial devices. Use shielded cables where specified.
-
7
After verifying all connections are secure and correct, remove LOTO devices and re-energize the cabinet according to established site safety procedures.