Description
The
Siemens 6ES7710-5DA35-2RB3 is a SIMATIC Field PG, designed as an industrial programming device for Siemens automation systems. This unit features a
Pentium III 1 GHz processor with a
256 KB 2nd level cache,
256 MB SDRAM (1x256 MB), and a
40 GBYTE EIDE Hard Disk Drive. It includes an integrated
DVD-ROM / CD-RW drive and a
SuperDisk LS 240 drive. The device comes with
Windows NT V4.0 German pre-installed, along with essential Siemens programming software:
STEP 7 Professional,
STEP 5, and
STEP 7 MicroWIN, with the software installed in June 2002. A power cable suitable for GER, FR, NL, SP, BEL, AUSTRIA, SWD, and FIN regions is included.
Features
- Pentium III 1 GHz Processor
- 256 KB 2nd Level Cache
- 256 MB SDRAM (1x256 MB)
- 40 GBYTE EIDE Hard Disk Drive
- Integrated DVD-ROM / CD-RW Drive
- Integrated SuperDisk LS 240 Drive
- Pre-installed Windows NT V4.0 German Operating System
- Includes STEP 7 Professional, STEP 5, and STEP 7 MicroWIN Software
- Regional Power Cable for GER, FR, NL, SP, BEL, AUSTRIA, SWD, FIN
Applications
- Industrial automation system programming and configuration
- PLC software development and debugging for Siemens SIMATIC controllers
- On-site diagnostics and maintenance for automation equipment
- Legacy system support for STEP 5 and older STEP 7 applications
Technical Specifications
| Attribute |
Value |
| Brand |
Siemens |
| Manufacturer |
Siemens |
| Country of Origin |
Germany |
| Range |
Simatic Field PG |
| Subrange |
Field PG |
| Product Type |
Pentium 3 Programming Device |
| Processor |
Pentium III 1 GHz |
| 2nd Level Cache |
256 KB |
| RAM |
256 MB SDRAM (1x256 MB) |
| Hard Disk Drive |
40 GBYTE HDD EIDE |
| Optical Drive |
DVD-ROM / CD-RW |
| Floppy Drive |
SuperDisk LS 240 Drive |
| Operating System |
Windows NT V4.0 German |
| Pre-installed Software |
STEP 7 Professional, STEP 5, STEP 7 MicroWIN |
| Software Installation Date |
06/2002 |
| Product Phase |
Phase-Out |
| Package Dimensions (Calculated) |
29.00 x 25.00 x 25.00 cm |
| Shipping Weight |
4.00 kg |
| Commodity Code |
84713000 |
| Export Control Regulations (ECCN) |
N |
Installation Guidelines
-
Power Connection: Connect the appropriate power cable for your region (GER, FR, NL, SP, BEL, AUSTRIA, SWD, FIN) to the device and a stable power source.
-
Initial Setup: Power on the Field PG. Allow the Windows NT V4.0 German operating system to boot completely.
-
Software Access: Access the pre-installed STEP 7 Professional, STEP 5, or STEP 7 MicroWIN software as required for your programming tasks.
-
Peripheral Connection: Connect necessary programming cables (e.g., MPI, PROFIBUS, Ethernet) to the Field PG and the target automation device. Ensure all connections are secure before commencing operations.
-
Safety Precautions: Always ensure that the target automation equipment is de-energized or in a safe state before connecting or disconnecting programming cables to prevent accidental operation or damage.
-
Environmental Considerations: Operate the Field PG in a clean, dry environment within its specified operating temperature range to ensure optimal performance and longevity.