1 de 1

Beckhoff CX2030-0110 CX2000 Series Embedded PC CPU Module

Beckhoff CX2030-0110 CX2000 Series Embedded PC CPU Module

Apenas 10 item(ns) restante(s) em estoque
  • Fabricante: BECKHOFF

  • Nº do Produto: CX2030-0110

  • País de origem:Alemanha

  • Tipo de Produto: PLC CPU Modules

  • Pagamento: T/T, Western Union

  • Peso: 500g

  • Dimensões: 144 mm x 99 mm x 91 mm

  • Porto de embarque: Xiamen

  • Garantia: 12 meses

Quantidade
Ver detalhes completos

Description

Executing high-speed automation tasks and complex visualization applications, the Beckhoff CX2030-0110 embedded controller integrates a dual-core Intel Core i7 2610UE 1.5 GHz processor directly onto a DIN rail mount. This industrial PC features a fanless architectural design with passive cooling, enabling reliable execution of TwinCAT 2 and TwinCAT 3 automation environments. Equipped with 2 GB of internal DDR3 RAM and 128 kB of non-volatile NOVRAM, the system secures critical process variables against unexpected power loss without requiring an external UPS. With automatic recognition for both EtherCAT-based E-bus and standard K-bus terminals, this unit acts as a highly adaptive processing core for distributed control networks.

Key Features

  • Intel Core i7 Processing: Dual-core 2610UE CPU operating at 1.5 GHz delivers high computational performance.
  • Flexible Memory Allocation: Features 2 GB DDR3 RAM along with 128 kB of integrated NOVRAM for persistent, battery-free variables.
  • High-Speed Communication: Equipped with two independent RJ45 ports supporting 10/100/1000 Mbit/s Gigabit Ethernet interfaces.
  • Dual Bus Support: Automatic sensing and management of E-bus (EtherCAT) and K-bus terminal systems.
  • Rugged Enclosure Design: Passive heat-sink cooling architecture with an IP20 protection rating suitable for standard control cabinet installations.

Applications

  • High-speed multi-axis motion control and synchronization networks.
  • Centralized PLC runtimes paired with embedded HMI visualization clients.
  • Industrial IoT gateways requiring real-time fieldbus translation.
  • Distributed data acquisition and processing in testing facilities.

Technical Specifications

Parameter Specification
Manufacturer Beckhoff Automation
Model Reference CX2030-0110
Processor Type Intel Core i7 2610UE 1.5 GHz (Dual Core)
Main Memory 2 GB DDR3 RAM
Persistent Memory 128 kB NOVRAM
Storage Interface CFast card slot (supports 20 GB or 40 GB media)
Ethernet Interfaces 2 x RJ45 10/100/1000 Mbit/s (independent)
Display Interface 1 x DVI-I
USB Ports 4 x USB 2.0
Power Supply 24 V DC (-15 percent / +20 percent)
Max Power Consumption 27 W
Protection Rating IP20
Operating Temperature -25 to +60 degC
Storage Temperature -40 to +85 degC
Dimensions (W x H x D) 144 mm x 99 mm x 91 mm
Shipping Weight (Calculated) 4.0 kg

Connections and Interfaces

Port / Connector Function and Configuration
RJ45 (Port 1 & Port 2) Dual Ethernet interfaces with active status LEDs. Supports real-time EtherCAT protocols and network interfaces.
DVI-I Direct analog or digital display connection. Supports resolution scaling for local terminal panels.
USB 2.0 (x4) Peripheral ports for diagnostic devices, external backup units, or local interface hardware.
CFast Slot Secure system storage bay for hosting the OS partition and configuration files.

Alternative Models & Compatibility

The CPU module runs on the TwinCAT 3 platform level "Mid Performance (Level 60)", dictating the runtime licensing structure for all control tasks. It interfaces directly with power supply segments of the CX2100-xxxx series. When upgrading from older single-core embedded systems, ensure your TwinCAT system configuration is adjusted to allocate task runtimes across the dual execution threads of the Intel Core i7 processor.

Application Pitfalls & Engineering Notes

While this module utilizes highly reliable passive cooling structures, physical mounting direction is critical. It must always be installed vertically on a horizontal DIN rail. Avoid packing adjacent modules too tightly; an unobstructed airflow space of 30 mm above and below the device is required to prevent thermal throttling under high CPU utilization.

Commissioning & Wiring Tips

Always use fully shielded, industrial-grade Cat5e or Cat6 cables for EtherCAT (E-bus) data routing to mitigate high-frequency electromagnetic interference in heavy motor control cabinets. When performing modifications to hardware configurations, ensure the 24 V DC system supply is isolated to prevent accidental ground loops or hot-plug terminal failures.

Installation Guidelines

CRITICAL WARNING: De-energize all primary and secondary power sources prior to physical installation, wiring connections, or removal of any component. Confirm the system is isolated from hazardous voltages before touching any internal terminals or connections to prevent electrical shock.
  1. 1
    Ensure the DIN rail is securely grounded to the main cabinet ground plane.
  2. 2
    Align the module onto the DIN rail and snap the integrated locking mechanism into place.
  3. 3
    Connect the power supply module and hook up the RJ45 Ethernet communication cables.
  4. 4
    Insert the formatted CFast storage card containing the system software image into the slot before initial boot.
Loading product navigation…

What I/O systems are natively compatible with this controller?

The controller automatically detects and interfaces with both Beckhoff E-bus (EtherCAT) and K-bus (standard Bus Terminals) systems upon connection.

What is the licensed TwinCAT 3 performance class for this CPU?

It belongs to the TwinCAT 3 Mid Performance (level 60) platform, which determines the licensing costs for runtime software licenses.

How should the passive cooling system be oriented for optimal heat dissipation?

The unit must be mounted vertically on a standard DIN rail. Ensure a minimum of 30 mm ventilation clearance above and below the chassis to allow free convection airflow.

Envio Expresso Global

  • Entrega Padrão: 4-6 dias úteis via DHL, FedEx e UPS.
  • Despacho Expresso: Envio no mesmo dia para pedidos em estoque realizados antes das 14:00 (GMT+8).
  • Cobertura Mundial: Atendendo mais de 150 países, incluindo entrega rápida para Arábia Saudita e Emirados Árabes Unidos.

Devoluções e Garantia

  • Garantia de 30 Dias: Devoluções aceitas para produtos em estoque na embalagem original, lacrada de fábrica.
  • Garantia de 12 Meses: Cada componente industrial é coberto pela nossa garantia técnica profissional.

Os pedidos são processados e entregues de segunda a sexta-feira (exceto feriados).


Para elegibilidade completa, taxas de reposição e detalhes de devolução internacional, por favor, consulte nosso oficial Política de Reembolso e Devolução .

TECHNICAL SPECIFICATIONS

Country of origin
Alemanha

Produtos Visualizados Recentemente

Conhecimento técnico

Operações Matemáticas Usando OpenPLC para Aplicações de Automação Industrial

Este artigo explica como os sistemas PLC realizam operações matemáticas básicas, como adição, subtração, multiplicação, divisão, módulo e exponenciação dentro da automação industrial. Ele mostra como...

Lógica Booleana Avançada com Programação FBD em CLP: Aplicações Industriais Práticas Além da Lógica Básica

O artigo explica várias funções avançadas de lógica Booleana usadas na programação de CLPs além das operações básicas AND, OR e NOT. Ele aborda como ferramentas como tabelas verdade, multiplexadores,...

Lógica Booleana na Programação de CLP: Entendendo Portas Lógicas FBD

A lógica booleana é a base de todo programa PLC. Desde controles simples de máquinas até sistemas complexos de automação industrial, as portas lógicas determinam como os controladores respondem a...

Guia Completo sobre Firewalls Industriais e Segmentação de Redes OT

Firewalls industriais desempenham um papel crucial na cibersegurança OT, protegendo redes PLC, DCS e SCADA por meio de segmentação, controle de entrada/saída e integração IDS/IPS alinhada aos...

Guia de Garras Robóticas: Do Manuseio Delicado à Automação Pesada

As garras robóticas modernas estão evoluindo além das tradicionais mandíbulas mecânicas. De sistemas adesivos inspirados em lagartos-gecko e garras macias de grau alimentício a ferramentas de armazém...

Retrospectiva: Como os Primeiros Motores Elétricos Transformaram a Mineração Subterrânea

Desde compressores CC acionados por corda até carrinhos de mina movidos a bateria, as operações de mineração iniciais marcaram um ponto de virada na eletrificação industrial. Este artigo explora como...