1 из 3

HIMA F 7133 H51q System Family 4-Fold Power Distribution Module

HIMA F 7133 H51q System Family 4-Fold Power Distribution Module

Остался в наличии только 10 товар(ы)
  • Производитель: HIMA

  • Номер продукта: F7133

  • Страна происхождения:Германия

  • Тип продукта: Power Distribution Module

  • Штрихкод: 8537101190

  • Оплата: Т/Т, Western Union

  • Вес: 160г

  • Размеры: 2cm x 18.8cm x 12.8cm

  • Порт отправления: Сямынь

  • Гарантия: 12 месяцев

Количество
Просмотреть полные детали

Description

The HIMA F 7133 is a non-interactive 4-fold power distribution module designed for the H51q System Family to provide fuse monitoring and L- distribution. The module functions within the I/O subrack (occupying slots 18 to 21) to supply and protect I/O modules, sensor contacts, and actuator circuits. It incorporates four miniature fuses that provide line protection, with each fuse monitored via an internal evaluation logic block. Power for the I/O modules is fed into the rear side of the power distribution modules via XG. 7/8/9/10, allowing specific slots to allocate power to designated groups of I/O slots. Built-in failure signalization is achieved through dedicated front-panel LEDs and an integrated relay contact to report missing or faulty fuse states safely.

Features

  • Provides 4-channel power distribution with independent fuse protection for each current path.
  • Integrates evaluation logic to monitor the operational state of each miniature fuse continuously.
  • Features front-panel LED indicators that stay on when a path is functional, flash when a fuse is faulty or missing, and turn off if supply voltage fails.
  • Equipped with a safety-related relay contact that remains closed when all fuses are functional and de-energizes automatically if any fuse is missing or faulty.
  • Designed as a non-interactive module ensuring isolated line protection across subrack assemblies.

Applications

  • 24 V DC power supply and distribution for safe routing to I/O slots within HIMA safety subracks.
  • Fused power circuit distribution for external sensors and actuator contacts.
  • Failure-signaling and monitored power marshalling in industrial automation and safety-instrumented systems.

Ordering Information

Part Type Designation Alternative Designation Functional Description
F 7133 F7133 4-fold power distribution with fuse monitoring and L- distribution

Technical Specifications

Parameter Value
Manufacturer HIMA Paul Hildebrandt GmbH + Co KG
Fuses max. 4 A slow blow
Switching Time approx. 100 ms (relay)
Loadability of the Relay Contacts 30 V/4 A (continuous load)
Residual Voltage (Fuse Tripped) 0 V
Residual Current (Fuse Tripped) 0 mA
Residual Voltage (Missing Supply) max. 3 V
Residual Current (Missing Supply) < 1 mA
Space Requirement 4 TE
Operating Data 24 V DC: 60 mA

Connections/Interfaces

Connector Pin Function
Front Contacts 1, 2, 3, 4 Connection for L+ resp. EL+ to supply the I/O modules and sensor contacts
Front Contact L- Connection for L- distribution
Rear Contacts d6, d10, d14, d18 Terminals for 24 V supply of one I/O slot each
Relay Contacts d22/z24 Safety monitoring loop contact (closed when all fuses are in order)

Installation Guidelines

  • Subrack Positioning: Install the module into slots 18 to 21 of the I/O subrack based on the specific group of I/O slots requiring power distribution.
  • Wiring Setup: Wire the supply inputs directly to the front-side contact pins (1, 2, 3, 4, and L-) via the front cable plug to establish the monitoring circuit.
  • Rear Connection Check: Secure the power feed to the rear side of the modules using XG. 7/8/9/10 connectors for proper distribution to the bus board.

Compliance and Certifications

  • CE
Loading product navigation…

Product Documentation

Technical Datasheet (PDF) Complete specifications and technical drawings.

Technical Datasheet

HIMA F 7133 H51q System Family 4-Fold Power Distribution Module

What is the maximum rating permitted for the integrated fuses on this module?

The module permits a maximum of 4 A slow blow miniature fuses to handle line protection across each current path.

How does the device communicate an internal line fault or a missing fuse condition?

An internal evaluation logic drives front-panel status LEDs to flash, and opens an integrated relay contact (d22/z24) if a fuse is faulty or missing.

What is the typical reaction time associated with the safety signaling relay contact?

The relay contact features an operational switching time of approximately 100 ms.

Глобальная экспресс-доставка

  • Стандартная доставка: 4-6 рабочих дней через DHL, FedEx и UPS.
  • Экспресс-отправка: Отправка в тот же день для заказов со склада, сделанных до 14:00 (GMT+8).
  • Мировое покрытие: Обслуживаем более 150 стран, включая быструю доставку в Саудовскую Аравию и ОАЭ.

Возвраты и гарантия

  • 30-дневная гарантия: Принимаются возвраты товаров со склада в оригинальной, заводской упаковке.
  • 12-месячная гарантия: Каждый промышленный компонент поддерживается нашей профессиональной технической гарантией.

Заказы обрабатываются и доставляются с понедельника по пятницу (кроме государственных праздников).


Для полной информации о праве на возврат, сборах за пополнение запасов и международных возвратах, пожалуйста, ознакомьтесь с нашей официальной Политика возврата и возмещения .

TECHNICAL SPECIFICATIONS

Color pattern
Зеленый
Country of origin
Германия

Недавно просмотренные товары

Технические знания

Электрические приводы, разработанные для замены гидравлических систем: практическое руководство по промышленной автоматизации

В этой статье объясняется, как интегрированные электрические приводы, такие как серия e-Actuator от SMC, преобразуют промышленное управление движением, заменяя традиционные пневматические и...

Математические операции с использованием OpenPLC для промышленных автоматизированных систем

В этой статье объясняется, как системы ПЛК выполняют основные математические операции, такие как сложение, вычитание, умножение, деление, взятие остатка и возведение в степень в рамках промышленной...

Продвинутая булева логика в программировании ПЛК с использованием FBD: практические промышленные применения за пределами базовой логики

В статье объясняются несколько продвинутых функций булевой логики, используемых в программировании ПЛК, помимо базовых операций AND, OR и NOT. Рассматривается, как такие инструменты, как таблицы...

Булева логика в программировании ПЛК: понимание логических элементов FBD

Булева логика является основой каждой программы ПЛК. От простого управления машинами до сложных систем промышленной автоматизации, логические элементы определяют, как контроллеры реагируют на...

Подробное руководство по промышленным файрволам и сегментации сетей ОТ

Промышленные межсетевые экраны играют ключевую роль в кибербезопасности операционных технологий, защищая сети ПЛК, ДСК и SCADA посредством сегментации, контроля входящего и исходящего трафика, а...

Руководство по роботизированным захватам: от деликатного обращения до тяжелой автоматизации

Современные роботизированные захваты развиваются дальше традиционных механических челюстей. От систем с клеящими поверхностями, вдохновлёнными гекконами, и мягких захватов пищевого класса до...