1 из 1

Omron CJ1W-CLK23 CJ Series Controller Link Unit

Omron CJ1W-CLK23 CJ Series Controller Link Unit

Остался в наличии только 5 товар(ы)
  • Производитель: Omron

  • Номер продукта: CJ1W-CLK23

  • Страна происхождения:Япония

  • Тип продукта: Controller Link Units

  • Оплата: Т/Т, Western Union

  • Вес: 110г

  • Порт отправления: Сямынь

  • Гарантия: 12 месяцев

Количество
Просмотреть полные детали

Description

Managing high-capacity peer-to-peer data transfers and message services across industrial networks, the Omron CJ1W-CLK23 serves as a dedicated Controller Link interface module designed for the Sysmac CJ PLC platform. By implementing a deterministic N:N token-bus method, this communication module enables seamless, real-time data exchange between CJ-series CPU units. It utilizes flag synchronization conforming to HDLC frames to guarantee highly reliable transmission over wired shielded twisted-pair cabling. Designed for flexible network scaling, it supports segmented architectures and multi-node configurations directly from the PLC backplane.

Features

  • Deterministic Token-Bus Protocol: Utilizes the N:N token-bus access control method for structured, collision-free industrial data traffic.
  • Dual-Mode Communication: Supports both high-volume data links for cyclic variables and explicit messaging services for event-driven diagnostics.
  • High Node Density: Allows flexible node configurations accommodating up to 62 nodes depending on network topology.
  • High Backplane Capacity: Supports up to 8 Controller Link modules mounted on a single CJ-series CPU rack.
  • Robust Signal Synchronization: Features hardware-level flag synchronization conforming to HDLC framing standards.

Applications

  • Distributed manufacturing line synchronization and inter-PLC coordination.
  • SCADA and industrial workstation communication backbones.
  • High-speed process network clustering requiring deterministic data packet delivery.

Technical Specifications

Parameter Specification
Manufacturer Omron
Model / SKU CJ1W-CLK23
Applicable PLCs All CJ-series CPU Units
Communication Medium Wired shielded twisted-pair (STP) cable
Communication Access Method N:N token-bus method
Data Synchronization Type Flag synchronization (conforms to HDLC frames)
Network Topology Multidrop method (bus type)
Node Capacity 32 or 62 nodes (determined by network parameters)
Max Units per CPU 8
Internal Current Consumption 0.35 A at 5 VDC from PLC bus
Weight 0.11 kg
Shipping Weight (Calculated) 1.15 kg

Alternative Models & Compatibility

The CJ1W-CLK23 is directly compatible with standard Sysmac CJ-series systems, including CJ1G, CJ1H, and CJ2M controllers. It serves as a direct upgrade to older-generation Controller Link units, providing improved message buffer handshakes and diagnostic routing efficiency. Always ensure your CPU unit's firmware and CX-Programmer software are updated to support the full routing table configurations enabled by this unit.

Application Pitfalls & Engineering Notes

A common issue in Controller Link networks is duplicate node setting. The node address is set via rotary switches on the front of the unit; duplicate node addresses will prevent the unit from joining the token ring. Furthermore, since the module draws 0.35 A from the backplane 5 VDC supply, power budget calculations must be verified prior to installation, especially when mounting multiple communication modules on a single rack.

Commissioning & Wiring Tips

To ensure stable, noise-tolerant communication:

  • Always enable the terminating resistance switches at both physical ends of the Controller Link trunk line. Keep all intermediate node terminating switches set to OFF.
  • Ground the shield of the twisted-pair cable at one single point in the network layout to avoid hazardous ground loops.
  • Route the communication cable in a separate conduit from high-voltage motor wiring or VFD cables to minimize electromagnetic interference (EMI).

Installation Guidelines

CRITICAL WARNING: SAFETY COMPLIANCE Always shut down the PLC power supply and bleed all residual charges before inserting, removing, or wiring the Controller Link Unit. Failure to completely de-energize the assembly can cause backplane hardware damage or communication processor corruption.
1

Configure the Unit Number and Node Address using the rotary switches on the front panel prior to physically mounting the module.

2

Align the upper and lower hooks of the CJ1W-CLK23 with the adjacent module or CPU rack connector, pushing until the module locks securely into position.

3

Secure the module lock levers at both the top and bottom of the rack assembly.

4

Connect the wired Controller Link network cable to the terminal block, ensuring correct terminal polarity and that the shielding layout is properly terminated.

Loading product navigation…

What is the maximum node capacity of this Controller Link interface?

The module supports up to 32 or 62 nodes on a single network loop, depending on the network configuration and baud rate settings.

Can I install more than one Controller Link Unit on a single CPU?

Yes, you can mount up to 8 units per CPU rack to configure redundant paths or segment your control network.

What are the power requirements of this communication module?

The module draws a current of 0.35 A directly from the 5V internal backplane power supply of the PLC rack.

Глобальная экспресс-доставка

  • Стандартная доставка: 4-6 рабочих дней через DHL, FedEx и UPS.
  • Экспресс-отправка: Отправка в тот же день для заказов со склада, сделанных до 14:00 (GMT+8).
  • Мировое покрытие: Обслуживаем более 150 стран, включая быструю доставку в Саудовскую Аравию и ОАЭ.

Возвраты и гарантия

  • 30-дневная гарантия: Принимаются возвраты товаров со склада в оригинальной, заводской упаковке.
  • 12-месячная гарантия: Каждый промышленный компонент поддерживается нашей профессиональной технической гарантией.

Заказы обрабатываются и доставляются с понедельника по пятницу (кроме государственных праздников).


Для полной информации о праве на возврат, сборах за пополнение запасов и международных возвратах, пожалуйста, ознакомьтесь с нашей официальной Политика возврата и возмещения .

TECHNICAL SPECIFICATIONS

Country of origin
Япония

Недавно просмотренные товары

Технические знания

Математические операции с использованием OpenPLC для промышленных автоматизированных систем

В этой статье объясняется, как системы ПЛК выполняют основные математические операции, такие как сложение, вычитание, умножение, деление, взятие остатка и возведение в степень в рамках промышленной...

Продвинутая булева логика в программировании ПЛК с использованием FBD: практические промышленные применения за пределами базовой логики

В статье объясняются несколько продвинутых функций булевой логики, используемых в программировании ПЛК, помимо базовых операций AND, OR и NOT. Рассматривается, как такие инструменты, как таблицы...

Булева логика в программировании ПЛК: понимание логических элементов FBD

Булева логика является основой каждой программы ПЛК. От простого управления машинами до сложных систем промышленной автоматизации, логические элементы определяют, как контроллеры реагируют на...

Подробное руководство по промышленным файрволам и сегментации сетей ОТ

Промышленные межсетевые экраны играют ключевую роль в кибербезопасности операционных технологий, защищая сети ПЛК, ДСК и SCADA посредством сегментации, контроля входящего и исходящего трафика, а...

Руководство по роботизированным захватам: от деликатного обращения до тяжелой автоматизации

Современные роботизированные захваты развиваются дальше традиционных механических челюстей. От систем с клеящими поверхностями, вдохновлёнными гекконами, и мягких захватов пищевого класса до...

Воспоминание: как ранние электродвигатели изменили подземную добычу полезных ископаемых

От компрессоров с приводом на верёвке до аккумуляторных шахтных вагонеток — ранние горные работы стали поворотным моментом в индустриальной электрификации. В этой статье рассматривается, как...